Incentive Regulation of UK Electricity and Gas Networks: From RIIO-1 to RIIO-2
Open accessAbstract
The regulatory and operating context of energy networks is dynamic and constantly evolving. Achieving a multitude of economic, environmental, social and policy objectives is a challenging task for the sector regulators. The UK energy regulator Ofgem has proposed a revision of its approach to energy network price control and incentive regulation.
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Cites
Still being checked.
Cited by
Sorted by citations
Joskow, P. L. (2024) · Review of Industrial Organization · doi:10.1007/s11151-024-09973-x · Cited by 37 · see citing works
“Among other things, almost all of the distribution companies earned returns that were well above the ex ante expected benchmark returns (Jamasb, 2020; OFGEM, 2019a, 2019b).”
BackgroundGhasemi, M., Dashti, R., & Amirioun, M. H. (2021) · International Transactions on Electrical Energy Systems · doi:10.1002/2050-7038.13202 · Cited by 6 · see citing works
Bovera, F., Schiavo, L. L., & Vailati, R. (2024) · Current Sustainable/Renewable Energy Reports · doi:10.1007/s40518-024-00239-4 · Cited by 5 · see citing works
- Authors
- Jamasb, T.
- Corresponding author
- Jamasb, Tooraj
- ORCID
- Jamasb, Tooraj
- Published
- 2020
- OpenAlex
- W4391025011
- Cited by
- 3
- References
- 0
- Citations by year
- 2024: 2 · 2021: 1
- Type
- report
- Language
- en
- Open access
- gold
- dx.doi.org
- Licence
- cc-by
- Locations
- CBS Research Portal (Copenhagen Business School) (submittedVersion, cc-by)
- Topics
- Social Sciences › Decision Sciences › Information Systems and Management › Energy Law and Policy
- Physical Sciences › Engineering › Electrical and Electronic Engineering › Electric Power System Optimization
- Social Sciences › Business, Management and Accounting › Strategy and Management › Transport and Economic Policies
- Keywords
- incentive regulation, electrical networks, gas networks, Ofgem, UK energy sector
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review