Coordinated train control in a fully automatic operation system for reducing energy consumption
Open accessAbstract
Energy efficient train operation includes four levels for energy saving: energy efficient driving, real-time multi-train coordination and rescheduling, energysaving timetabling, and energy-saving planning.For a fully automatic operation system, it provides a flexible way to coordinate trains.The coordination of trains can improve some system performances, such as the efficient use of regenerative energy.The efficient use of energy regenerated by other trains which are during braking phase can contribute to reducing energy consumption.In general, the approaches of coordinated train control for using regenerative energy can be divided into two types: train dwell time control and train running time control.This paper proposes an approach for coordinating trains in fully automatic operation system by modifying running time between adjacent stations.Simulation studies are performed and the usage of regenerative energy and average passenger waiting time is analysed by using the proposed method.It is shown that improvements in the usage of regenerative energy can be achieved by using the proposed method.
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
Up to four energy-efficiency levels can be distinguished in railway scenarios: energy-efficient driving, coordination and re-scheduling of multiple trains in real time, creation of energy-efficient timetables, and energy-saving planning.
“However, note that up to four energy-efficiency levels can be distinguished in railway scenarios [136]: energy-efficient driving, the coordination and re-scheduling of multiple trains in real time, the creation of energy-efficient timetables, and energy-saving planning.”
From Towards the Internet of Smart Trains: A Review on Industrial IoT-Connected Railways (2017) · cites this paper as [136]
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Cites
Improving Transit Service Quality and Headway Regularity with Real-Time Control
Ding, Y., & Chien, S. (2001) · Transportation Research Record Journal of the Transportation Research Board · doi:10.3141/1760-21 · Cited by 79 · see citing works
Optimization of an MRT Train Schedule: Reducing Maximum Traction Power by Using Genetic Algorithms
Chen, J. F., Lin, R., & Liu, Y. (2005) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2005.851939 · Cited by 79 · see citing works
Albrecht, T. (2004) · WIT transactions on the built environment · doi:10.2495/cr040881 · Cited by 75 · see citing works
Coordinated train control and energy management control strategies
Gordon, S. P., & Lehrer, D. G. (2002) · ASME/IEEE Joint Railroad Conference (JRC) · doi:10.1109/rrcon.1998.668103 · Cited by 67 · see citing works
Economy/regularity fuzzy-logic controlof DC railway systems using event-driven approach
Chang, C. S., Phoa, Y. H., Wang, W., et al. (1996) · IEE Proceedings - Electric Power Applications · doi:10.1049/ip-epa:19960204 · Cited by 23 · see citing works
Self-citationFirpo, P. (1995) · doi:10.1049/cp:19950174 · Cited by 19 · see citing works
Train scheduling desynchronization and power peak optimization in a subway system
Sansò, B., & Girard, P. (2002) · IEEE/ASME Joint Railroad Conference · doi:10.1109/rrcon.1995.395167 · Cited by 11 · see citing works
DC Electric Train Traffic Scheduling Method Considering Energy-Saving
Guo, H., Ohashi, H., & Ichinokura, O. (1999) · IEEJ Transactions on Industry Applications · doi:10.1541/ieejias.119.1337 · Cited by 9 · see citing works
A novel peak power demand reduction strategy under a moving block signalling system
Gu, Q., Pei, L., Cao, F., et al. (2010) · WIT transactions on the built environment · doi:10.2495/cr100611 · Cited by 8 · see citing works
Peak demand reduction techniques when starting under moving block signalling
Takeuchi, H. (1998) · doi:10.1049/cp:19980129 · Cited by 5 · see citing works
A Simulation Study Of Peak Demand ReductionStrategies When Starting Under Moving BlockSignalling
Takeuchi, H., & Goodman, C. J. (1970) · WIT transactions on the built environment · doi:10.2495/cr960192 · Cited by 4 · see citing works
Flagged first, then by citations
Cited by
Sorted by citations
Towards the Internet of Smart Trains: A Review on Industrial IoT-Connected Railways
Fraga-Lamas, P., Fernández-Caramés, T., & Castedo, L. (2017) · Sensors · doi:10.3390/s17061457 · Cited by 267 · see citing works
- Authors
- Xun, J., Yang, X., Ning, B., Tang, T., & Wang, W.
- Affiliations
- Beijing Jiaotong University (CN)
- Venue
- WIT Transactions on The Built Environment
- Publisher
- WIT Press
- Published
- 2012-09-11
- Volume
- 1
- Pages
- 3-13
- ISSN
- 1743-3509 (ISSN-L)
- 1746-4498
- OpenAlex
- W1970284906
- Cited by
- 8
- References
- 11
- Citations by year
- 2021: 1 · 2018: 1 · 2017: 1 · 2016: 2 · 2015: 1 · 2014: 2
- FWCI
- 2.40
- Type
- conference paper
- Language
- en
- Open access
- bronze
- doi.org
- Locations
- WIT transactions on the built environment (publishedVersion)
- Funders
- Beijing Jiaotong University
- State Key Laboratory of Rail Traffic Control and Safety (2011AA110502)
- Topics
- Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Railway Systems and Energy Efficiency
- Physical Sciences › Engineering › Control and Systems Engineering › Traffic control and management
- Social Sciences › Transportation › Transportation Planning and Optimization
- Keywords
- energy consumption reduction, renewable energy, passenger waiting time, railway energy efficiency
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review