Artificial Intelligence Enabled Project Management: A Systematic Literature Review
Open accessThe DOI matches its Crossref record; 10 of the 10 references it cites were found in a registry or an index.
Abstract
In the Industry 5.0 era, companies are leveraging the potential of cutting-edge technologies such as artificial intelligence for more efficient and green human-centric production. In a similar approach, project management would benefit from artificial intelligence in order to achieve project goals by improving project performance, and consequently, reaching higher sustainable success. In this context, this paper examines the role of artificial intelligence in emerging project management through a systematic literature review; the applications of AI techniques in the project management performance domains are presented. The results show that the number of influential publications on artificial intelligence-enabled project management has increased significantly over the last decade. The findings indicate that artificial intelligence, predominantly machine learning, can be considerably useful in the management of construction and IT projects; it is notably encouraging for enhancing the planning, measurement, and uncertainty performance domains by providing promising forecasting and decision-making capabilities.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
LeCun, Y., Bengio, Y., & Hinton, G. (2015) · Nature · doi:10.1038/nature14539 · Cited by 84,126
Zadeh, L. A. (1965) · Information and Control · doi:10.1016/s0019-9958(65)90241-x · Cited by 67,855
Tranfield, D., Denyer, D., & Smart, P. (2003) · British Journal of Management · doi:10.1111/1467-8551.00375 · Cited by 15,386
Martín-Martín, A., Orduna-Malea, E., Thelwall, M., & López-Cózar, E. D. (2018) · doi:10.31235/osf.io/42nkm · Cited by 1,990
Martín-Martín, A., Orduna-Malea, E., Thelwall, M., & Delgado López-Cózar, E. (2018) · Journal of Informetrics · doi:10.1016/j.joi.2018.09.002 · Cited by 1,990 · cited 1×
“Two of the largest repositories of academic articles, Web of Science and Scopus, were chosen due to their higher scientific impact and thus to search for conforming peer-reviewed journals and conference papers [23].”
BackgroundBorges, A. F. S., Laurindo, F. J. B., Spínola, M. M., Gonçalves, R. F., & Mattos, C. A. (2021) · International Journal of Information Management · doi:10.1016/j.ijinfomgt.2020.102225 · Cited by 760
Pospieszny, P., Czarnacka-Chrobot, B., & Kobylinski, A. (2018) · Journal of Systems and Software · doi:10.1016/j.jss.2017.11.066 · Cited by 247 · cited 2×
“An effective ML ensemble model composed of SVM, NN, and Generalized Linear Models is provided in [32].”
MethodAfzal, F., Yunfei, S., Nazir, M., & Bhatti, S. M. (2021) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-02-2019-0047 · Cited by 172 · cited 1×
“Furthermore, the literature review paper [121] revealed the popularity of hybrid AI methods, such as fuzzy ANNs, fuzzy-analytical network processing, and fuzzy-simulation for risk assessment in construction projects.”
MethodNeural network models for software development effort estimation: a comparative study
Nassif, A. B., Azzeh, M., Capretz, L. F., & Ho, D. (2016) · Neural Computing and Applications · doi:10.1007/s00521-015-2127-1 · Cited by 122
Amer, F., Jung, Y., & Golparvar-Fard, M. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103929 · Cited by 68 · cited 1×
“Amer et al. [116] developed a method for the measurement of activities that automatically maps master schedule activities to planning tasks.”
Method
Metadata
- Authors
- Taboada, I., Daneshpajouh, A., Toledo, N., & de Vass, T.
- Venue
- Applied Sciences
- Publisher
- MDPI AG
- Published
- 2023-04-17
- Volume
- 13
- Issue
- 8
- Pages
- 5014
- ISSN
- 2076-3417 (ISSN-L)
- OpenAlex
- W4366188816
- Cited by
- 216
- References
- 10
- FWCI
- 7.72
- Type
- journal article
- Language
- en
- Open access
- gold
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.