The DOI matches its Crossref record; 142 of the 142 references it cites were found in a registry or an index.
Influence of Artificial Intelligence in Civil Engineering toward Sustainable Development—A Systematic Literature Review
Open accessAbstract
The widespread use of artificial intelligence (AI) in civil engineering has provided civil engineers with various benefits and opportunities, including a rich data collection, sustainable assessment, and productivity. The trend of construction is diverted toward sustainability with the aid of digital technologies. In this regard, this paper presents a systematic literature review (SLR) in order to explore the influence of AI in civil engineering toward sustainable development. In addition, SLR was carried out by using academic publications from Scopus (i.e., 3478 publications). Furthermore, screening is carried out, and eventually, 105 research publications in the field of AI were selected. Keywords were searched through Boolean operation “Artificial Intelligence” OR “Machine intelligence” OR “Machine Learning” OR “Computational intelligence” OR “Computer vision” OR “Expert systems” OR “Neural networks” AND “Civil Engineering” OR “Construction Engineering” OR “Sustainable Development” OR “Sustainability”. According to the findings, it was revealed that the trend of publications received its high intention of researchers in 2020, the most important contribution of publications on AI toward sustainability by the Automation in Construction, the United States has the major influence among all the other countries, the main features of civil engineering toward sustainability are interconnectivity, functionality, unpredictability, and individuality. This research adds to the body of knowledge in civil engineering by visualizing and comprehending trends and patterns, as well as defining major research goals, journals, and countries. In addition, a theoretical framework has been proposed in light of the results for prospective researchers and scholars.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Over the past decade, ML techniques has obtained significant attention for addressing complex engineering challenges [52], [53].”
From Integrating AI in engineering education: A comprehensive review and student-informed module design for U.K. students (2025) · cites this paper as [53]
Citations
Cites
Preferred Reporting Items for Systematic Reviews and Meta-Analyses: the PRISMA statement
Moher, D., Liberati, A., Tetzlaff, J., Altman, D. G., & for the PRISMA Group (2009) · BMJ · doi:10.1136/bmj.b2535 · Cited by 83,823
Preferred Reporting Items for Systematic Reviews and Meta-Analyses: The PRISMA Statement
Moher, D., Liberati, A., Tetzlaff, J., Altman, D. G., & The PRISMA Group (2009) · PLoS Medicine · doi:10.1371/journal.pmed.1000097 · Cited by 64,042
Tranfield, D., Denyer, D., & Smart, P. (2003) · British Journal of Management · doi:10.1111/1467-8551.00375 · Cited by 15,386
Zawacki-Richter, O., Marín, V. I., Bond, M., & Gouverneur, F. (2019) · International Journal of Educational Technology in Higher Education · doi:10.1186/s41239-019-0171-0 · Cited by 7,242 · cited 1×
“Much research has been conducted on the rise of AI from the beginning of the modern era to the present [31–34].”
BackgroundDigital transformation: A multidisciplinary reflection and research agenda
Verhoef, P. C., Broekhuizen, T., Bart, Y., Bhattacharya, A., Qi Dong, J., Fabian, N., & Haenlein, M. (2021) · Journal of Business Research · doi:10.1016/j.jbusres.2019.09.022 · Cited by 5,720
Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry
Azhar, S. (2011) · Leadership and Management in Engineering · doi:10.1061/(asce)lm.1943-5630.0000127 · Cited by 2,207
Systematic Reviews: Rationale for systematic reviews
Mulrow, C. D. (1994) · BMJ · doi:10.1136/bmj.309.6954.597 · Cited by 1,677
Kamble, S. S., Gunasekaran, A., & Gawankar, S. A. (2018) · Process Safety and Environmental Protection · doi:10.1016/j.psep.2018.05.009 · Cited by 1,440
Pan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103517 · Cited by 1,336
Vaio, A. D., Palladino, R., Hassan, R., & Escobar, O. (2020) · Journal of Business Research · doi:10.1016/j.jbusres.2020.08.019 · Cited by 1,320
Artificial intelligence for sustainability: Challenges, opportunities, and a research agenda
Nishant, R., Kennedy, M., & Corbett, J. (2020) · International Journal of Information Management · doi:10.1016/j.ijinfomgt.2020.102104 · Cited by 1,203
Emerging Artificial Intelligence Methods in Structural Engineering
Salehi, H., & Burgueño, R. (2018) · Engineering Structures · doi:10.1016/j.engstruct.2018.05.084 · Cited by 1,068
Artificial Intelligence in Supply Chain Management: A Systematic Literature Review
Toorajipour, R., Sohrabpour, V., Nazarpour, A., Oghazi, P., & Fischl, M. (2021) · Journal of Business Research · doi:10.1016/j.jbusres.2020.09.009 · Cited by 1,020
Talaviya, T., Shah, D., Patel, N., Yagnik, H., & Shah, M. (2020) · Artificial Intelligence in Agriculture · doi:10.1016/j.aiia.2020.04.002 · Cited by 1,015
Patrício, D., & Rieder, R. (2018) · Computers and Electronics in Agriculture · doi:10.1016/j.compag.2018.08.001 · Cited by 1,007
Artificial Intelligence trends in education: a narrative overview
Chassignol, M., Khoroshavin, A., Klimova, A., & Bilyatdinova, A. (2018) · Procedia Computer Science · doi:10.1016/j.procs.2018.08.233 · Cited by 956
Artificial Intelligence and the Modern Productivity Paradox: A Clash of Expectations and Statistics
Brynjolfsson, E., Rock, D., & Syverson, C. (2017) · National Bureau of Economic Research · doi:10.3386/w24001 · Cited by 940
A comparative study of causes of time overruns in Hong Kong construction projects
Chan, D. W. M., & Kumaraswamy, M. M. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00039-7 · Cited by 871
Causes of construction delay: traditional contracts
Odeh, A. M., & Al-Battaineh, H. T. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00037-5 · Cited by 855
Digital Transformation and Environmental Sustainability: A Review and Research Agenda
Feroz, A. K., Zo, H., & Chiravuri, A. (2021) · Sustainability · doi:10.3390/su13031530 · Cited by 813
Applications of artificial intelligence in transport: An overview
Abduljabbar, R., Dia, H., Liyanage, S., & Bagloee, S. A. (2019) · Sustainability · doi:10.3390/su11010189 · Cited by 769
Borges, A. F. S., Laurindo, F. J. B., Spínola, M. M., Gonçalves, R. F., & Mattos, C. A. (2021) · International Journal of Information Management · doi:10.1016/j.ijinfomgt.2020.102225 · Cited by 760
Darko, A., Chan, A. P. C., Adabre, M. A., Edwards, D. J., Hosseini, M. R., & Ameyaw, E. E. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103081 · Cited by 679
Exploring How Usage-Focused Business Models Enable Circular Economy through Digital Technologies
Bressanelli, G., Adrodegari, F., Perona, M., & Saccani, N. (2018) · Sustainability · doi:10.3390/su10030639 · Cited by 666
A comprehensive review of data envelopment analysis (DEA) approach in energy efficiency
Mardani, A., Zavadskas, E. K., Štreimikienė, D., Jusoh, A., & Khoshnoudi, M. (2016) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2016.12.030 · Cited by 639
Artificial intelligence and sustainable development
Goralski, M. A., & Tan, T. (2020) · The International Journal of Management Education · doi:10.1016/j.ijme.2019.100330 · Cited by 628
Ivanov, D., Dolgui, A. B., Sokolov, B., Werner, F. M., & Іванова, М. (2015) · International Journal of Production Research · doi:10.1080/00207543.2014.999958 · Cited by 566
A critical review on computer vision and artificial intelligence in food industry
Kakani, V., Nguyen, V. H., Kumar, B. P., Kim, H., & Pasupuleti, V. R. (2020) · Journal of Agriculture and Food Research · doi:10.1016/j.jafr.2020.100033 · Cited by 565
Governance of artificial intelligence
Taeihagh, A. (2021) · Policy and Society · doi:10.1080/14494035.2021.1928377 · Cited by 562
Qualitative research in marketing
Gummesson, E. (2005) · European Journal of Marketing · doi:10.1108/03090560510581791 · Cited by 546
Mardani, A., Zavadskas, E. K., Govindan, K., Senin, A. A., & Jusoh, A. (2016) · Sustainability · doi:10.3390/su8010037 · Cited by 459
A study on project success factors in large construction projects in Vietnam
Nguyen, L. D., Ogunlana, S. O., & Lan, D. T. X. (2004) · Engineering Construction & Architectural Management · doi:10.1108/09699980410570166 · Cited by 421
A review of risk management through BIM and BIM-related technologies
Zou, Y., Kiviniemi, A., & Jones, S. W. (2016) · Safety Science · doi:10.1016/j.ssci.2015.12.027 · Cited by 414
Digital inequalities in the age of artificial intelligence and big data
Lutz, C. (2019) · Human Behavior and Emerging Technologies · doi:10.1002/hbe2.140 · Cited by 411
Núñez‐Merino, M., Marín, J. M. M., Moyano‐Fuentes, J., & Martínez‐Jurado, P. J. (2020) · International Journal of Production Research · doi:10.1080/00207543.2020.1743896 · Cited by 407
From human – machine interaction to human – machine cooperation
Hoc, J. (2000) · Ergonomics · doi:10.1080/001401300409044 · Cited by 392
De-materialising and re-materialising: Digital technologies and the environment
Berkhout, F., & Hertin, J. (2004) · Futures · doi:10.1016/j.futures.2004.01.003 · Cited by 373
Application of MCDM Methods in Sustainability Engineering: A Literature Review 2008–2018
Stojčić, M., Zavadskas, E. K., Pamucar, D. S., Stević, Ž., & Mardani, A. (2019) · Symmetry · doi:10.3390/sym11030350 · Cited by 368
Applications of Artificial Intelligence in Machine Learning: Review and Prospect
Das, S., Dey, A., Pal, A., & Roy, N. (2015) · International Journal of Computer Applications · doi:10.5120/20182-2402 · Cited by 360
Pacaux‐Lemoine, M., Trentesaux, D., Rey, G. Z., & Millot, P. (2017) · Computers & Industrial Engineering · doi:10.1016/j.cie.2017.05.014 · Cited by 336
Causes of delays on construction projects: a comprehensive list
Durdyev, S., & Hosseini, M. R. (2019) · International Journal of Managing Projects in Business · doi:10.1108/ijmpb-09-2018-0178 · Cited by 314
Self-citationArtificial neural network applications in geotechnical engineering
Shahin, M. A., Jaksa, M. B., & Maier, H. R. (2001) · Cited by 307
Role of construction in economic development: Review of key concepts in the past 40 years
Giang, D. T., & Pheng, L. S. (2010) · Habitat International · doi:10.1016/j.habitatint.2010.06.003 · Cited by 279
Kunkel, S., & Matthess, M. (2020) · Environmental Science & Policy · doi:10.1016/j.envsci.2020.06.022 · Cited by 274
Artificial Intelligence in Civil Engineering
Lu, P., Chen, S., & Zheng, Y. (2012) · Mathematical Problems in Engineering · doi:10.1155/2012/145974 · Cited by 265
The impact of knowledge management processes on information systems: A systematic review
Al‐Emran, M., Mezhuyev, V., Kamaludin, A., & Shaalan, K. F. (2018) · International Journal of Information Management · doi:10.1016/j.ijinfomgt.2018.08.001 · Cited by 245
Prediction of Risk Delay in Construction Projects Using a Hybrid Artificial Intelligence Model
Yaseen, Z. M., Ali, Z. H., Salih, S. Q., & Al-Ansari, N. A. (2020) · Sustainability · doi:10.3390/su12041514 · Cited by 242
Impact of integration management on construction project management performance
Demirkesen, S., & Ozorhon, B. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2017.09.008 · Cited by 235
State-of-the-art review of some artificial intelligence applications in pile foundations
Shahin, M. A. (2014) · Geoscience Frontiers · doi:10.1016/j.gsf.2014.10.002 · Cited by 230
Sustainable Decision-Making in Civil Engineering, Construction and Building Technology
Zavadskas, E. K., Antuchevičienė, J., Vilutienė, T., & Adeli, H. (2017) · Sustainability · doi:10.3390/su10010014 · Cited by 222
Cai, S., Ma, Z., Skibniewski, M. J., & Bao, S. (2019) · Advanced Engineering Informatics · doi:10.1016/j.aei.2019.100989 · Cited by 209
Engineering applications of artificial intelligence: A bibliometric analysis of 30 years (1988–2018)
Shukla, A. K., Janmaijaya, M., Abraham, A., & Muhuri, P. K. (2019) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2019.06.010 · Cited by 205
Magazzino, C., Mele, M., & Schneider, N. (2020) · Waste Management · doi:10.1016/j.wasman.2020.05.033 · Cited by 201
Mobile practices in everyday life: Popular digital technologies and schooling revisited
Merchant, G. (2012) · British Journal of Educational Technology · doi:10.1111/j.1467-8535.2012.01352.x · Cited by 193
Shirowzhan, S., Tan, W., & Sepasgozar, S. M. E. (2020) · ISPRS International Journal of Geo-Information · doi:10.3390/ijgi9040240 · Cited by 183
Frank, B. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.125242 · Cited by 174
Towards an organizational culture framework in construction
Cheung, S. O., Wong, P. S. P., & Wu, A. W. Y. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2010.01.014 · Cited by 174
You, J., Chen, Y., Wang, W., & Shi, C. (2018) · International Journal of Project Management · doi:10.1016/j.ijproman.2018.03.002 · Cited by 173
Manzoor, B., Othman, I., & Torres, J. C. P. (2021) · International Journal of Environmental Research and Public Health · doi:10.3390/ijerph18116135 · Cited by 168
Self-citationAnalysis of Citation Networks in Building Information Modeling Research
Hosseini, M. R., Maghrebi, M., Akbarnezhad, A., Martek, I., & Arashpour, M. (2018) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001492 · Cited by 166
Abdi, M., & Aulakh, P. S. (2014) · Journal of Management · doi:10.1177/0149206314541152 · Cited by 162
Data mining in the construction industry: Present status, opportunities, and future trends
Yan, H., Yang, N., Peng, Y., & Ren, Y. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103331 · Cited by 161
Causes of Delay in the Planning and Design Phases for Construction Projects
Yang, J.-B., & Wei, P.-R. (2010) · Journal of Architectural Engineering · doi:10.1061/(asce)1076-0431(2010)16:2(80 · Cited by 148
The structures of uncertainty: performativity and unpredictability in economic operations
Esposito, E. (2012) · Economy and Society · doi:10.1080/03085147.2012.687908 · Cited by 146
Managing project culture: The case of Environ Megaproject
van Marrewijk, A. H. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.004 · Cited by 146
Alba-Rodríguez, M. D., Martínez-Rocamora, A., González-Vallejo, P., Ferreira-Sánchez, A., & Marrero, M. (2017) · Environmental Impact Assessment Review · doi:10.1016/j.eiar.2017.06.002 · Cited by 146
Determinants of rework in building construction projects
Love, P. E. D., & Edwards, D. J. (2004) · Engineering Construction & Architectural Management · doi:10.1108/09699980410547612 · Cited by 140
Kabirifar, K., & Mojtahedi, M. (2019) · Buildings · doi:10.3390/buildings9010015 · Cited by 136
A Set of Recommendations for Assessing Human-Machine Parity in Language Translation
Läubli, S., Castilho, S., Neubig, G., Sennrich, R., Shen, Q.-L., & Toral, A. (2020) · Journal of Artificial Intelligence Research · doi:10.1613/jair.1.11371 · Cited by 136
Bertone, E., Burford, M. A., & Hamilton, D. P. (2018) · Water Research · doi:10.1016/j.watres.2018.05.001 · Cited by 130
Critical factors affecting the use of alternative dispute resolution processes in construction
Cheung, S. O. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00027-1 · Cited by 128
Artificial intelligence for securing industrial-based cyber–physical systems
Lv, Z., Chen, D., Lou, R., & Alazab, A. (2020) · Future Generation Computer Systems · doi:10.1016/j.future.2020.12.001 · Cited by 128
Chou, J., & Pham, A. (2015) · Computer-Aided Civil and Infrastructure Engineering · doi:10.1111/mice.12121 · Cited by 126
Review of construction journals on causes of project cost overruns
Durdyev, S. (2020) · Engineering Construction & Architectural Management · doi:10.1108/ecam-02-2020-0137 · Cited by 124
Self-citationActive tensegrity: A control framework for an adaptive civil-engineering structure
Adam, B., & Smith, I. F. C. (2008) · Computers & Structures · doi:10.1016/j.compstruc.2008.05.006 · Cited by 122
Robot-based construction automation: An application to steel beam assembly (Part I)
Chu, B., Jung, K., Lim, M. T., & Hong, D. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.12.016 · Cited by 121
Survey of digital technologies in procurement of construction projects
Ibem, E. O., & Laryea, S. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.07.003 · Cited by 121
Architects and contractors: a comparative study of organizational cultures
Ankrah, N. A., & Langford, D. A. (2005) · Construction Management and Economics · doi:10.1080/01446190500126973 · Cited by 119
Constructing Uncertainty: Unions and Migrant Labour in Construction in Spain and the UK
Meardi, G., Artiles, A. M., & Lozano, M. (2012) · Journal of Industrial Relations · doi:10.1177/0022185611432388 · Cited by 117
Enabling knowledge creation and sharing in transnational projects
Adenfelt, M., & Lagerström, K. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.09.003 · Cited by 117
Digital Technologies in Facility Management – The state of Practice and Research Challenges
Araszkiewicz, K. (2017) · Procedia Engineering · doi:10.1016/j.proeng.2017.08.059 · Cited by 113
The hype factor of digital technologies in AEC
Bosch‐Sijtsema, P. M., Claeson-Jonsson, C., Johansson, M., & Roupé, M. (2021) · Construction Innovation · doi:10.1108/ci-01-2020-0002 · Cited by 113
Arashpour, M., Wakefield, R. R., Lee, E. W. M., Chan, R., & Hosseini, M. R. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.02.004 · Cited by 112
Artificial Intelligence Techniques for Smart City Applications
Luckey, D., Fritz, H., Legatiuk, D., Dragos, K., & Smarsly, K. (2020) · Lecture notes in civil engineering · doi:10.1007/978-3-030-51295-8_1 · Cited by 110
de la Fuente, A., Blanco, A., Armengou, J., & Aguado, A. (2016) · Tunnelling and Underground Space Technology · doi:10.1016/j.tust.2016.10.008 · Cited by 100
Planning and implementation of effective collaboration in construction projects
Shelbourn, M., Bouchlaghem, N. M., Anumba, D. O. C., & Carrillo, P. M. (2007) · Construction Innovation · doi:10.1108/14714170710780101 · Cited by 100
Is selective demolition always a sustainable choice?
Pantini, S., & Rigamonti, L. (2019) · Waste Management · doi:10.1016/j.wasman.2019.12.033 · Cited by 99
Manzoor, B., Othman, I., Gardezi, S. S. S., Altan, H., & Abdalla, S. B. (2021) · Applied Sciences · doi:10.3390/app11125397 · Cited by 98
Self-citationAli, A. S., & Rahmat, I. (2010) · Journal of Retail & Leisure Property · doi:10.1057/rlp.2009.20 · Cited by 97
Mardani, A., Štreimikienė, D., Zavadskas, E. K., Cavallaro, F., Nilashi, M., Jusoh, A., & Zare, H. (2017) · Sustainability · doi:10.3390/su9101814 · Cited by 95
The Increasing Role of Digital Technologies in Co-Production and Co-Creation
Lember, V. (2018) · Routledge eBooks · doi:10.4324/9781315204956-16 · Cited by 89
Identifying and Categorizing the Sources of Uncertainty in Construction Supply Chains
Gosling, J., Naim, M. M., & TOWILL, D. R. (2012) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000574 · Cited by 88
Automated construction system for high-rise reinforced concrete buildings
Wakisaka, T., Furuya, N., Inoue, Y., & Shiokawa, T. (2000) · Automation in Construction · doi:10.1016/s0926-5805(99)00039-4 · Cited by 88
A new framework for the sustainable development goals of Saudi Arabia
AlArjani, A. S., Modibbo, U. M., Ali, I., & Sarkar, B. (2021) · Journal of King Saud University - Science · doi:10.1016/j.jksus.2021.101477 · Cited by 85
A review of tertiary BIM education for advanced engineering communication with visualization
Badrinath, A. C., Chang, Y., & Hsieh, S. (2016) · Visualization in Engineering · doi:10.1186/s40327-016-0038-6 · Cited by 80
Zhou, H., Wang, H., & Wei, Z. E. N. G. (2018) · Frontiers of Engineering Management · doi:10.15302/j-fem-2018075 · Cited by 79
MULTI-CRITERIA DECISION MAKING IN CIVIL ENGINEERING: PART I – A STATE-OF-THE-ART SURVEY
Zavadskas, E. K., Antuchevičienė, J., & Kapliński, O. (2016) · Engineering Structures and Technologies · doi:10.3846/2029882x.2015.1143204 · Cited by 78
Genetic algorithm-based multi-objective model for scheduling of linear construction projects
Senouci, A. B., & Al-Derham, H. R. (2008) · Advances in Engineering Software · doi:10.1016/j.advengsoft.2007.08.002 · Cited by 78
Energy consumption forecasting in agriculture by artificial intelligence and mathematical models
Bolandnazar, E., Rohani, A., & Taki, M. (2019) · Energy Sources Part A Recovery Utilization and Environmental Effects · doi:10.1080/15567036.2019.1604872 · Cited by 77
Reinforcement Learning for Structural Control
Adam, B., & Smith, I. F. C. (2008) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2008)22:2(133 · Cited by 74
Luciano, A., Cutaia, L., Cioffi, F., & Sinibaldi, C. (2020) · Environmental Science and Pollution Research · doi:10.1007/s11356-020-09513-6 · Cited by 67
Managing information complexity using system dynamics on construction projects
Khan, K. I. A., Flanagan, R., & Lu, S. (2016) · Construction Management and Economics · doi:10.1080/01446193.2016.1190026 · Cited by 59
The development of an AI journal ranking based on the revealed preference approach
Serenko, A. (2010) · Journal of Informetrics · doi:10.1016/j.joi.2010.04.001 · Cited by 56
Evaluating the critical safety factors causing accidents in high-rise building projects
Manzoor, B., Othman, I., & Manzoor, M. (2021) · Ain Shams Engineering Journal · doi:10.1016/j.asej.2020.11.025 · Cited by 56
Self-citationSustainable Structural Design: Comprehensive Literature Review
Pongiglione, M., & Calderini, C. (2016) · Journal of Structural Engineering · doi:10.1061/(asce)st.1943-541x.0001621 · Cited by 55
Abotaleb, I. S., & El-adaway, I. H. (2018) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000633 · Cited by 55
A Set of Recommendations for Assessing Human–Machine Parity in Language Translation
Läubli, S., Castilho, S., Neubig, G., Sennrich, R., Shen, Q., & Toral, A. (2020) · Zurich Open Repository and Archive (University of Zurich) · doi:10.5167/uzh-188217 · Cited by 54
Amlashi, A. T., Alidoust, P., Pazhouhi, M., Niavol, K. P., Khabiri, S., & Ghanizadeh, A. R. (2021) · Journal of Materials in Civil Engineering · doi:10.1061/(asce)mt.1943-5533.0003645 · Cited by 49
Hosseinzadeh-Bandbafha, H., Nabavi‐Pelesaraei, A., & Shamshirband, S. (2017) · Environmental Progress & Sustainable Energy · doi:10.1002/ep.12604 · Cited by 49
Integration of digital technologies in the field of construction in the Russian Federation
Aleksandrova, E. B., Vinogradova, V., & Tokunova, G. F. (2019) · Engineering Management in Production and Services · doi:10.2478/emj-2019-0019 · Cited by 47
Multiobjective Environmentally Sustainable Road Network Design Using Pareto Optimization
Wang, Y., & Szeto, W. Y. (2017) · Computer-Aided Civil and Infrastructure Engineering · doi:10.1111/mice.12305 · Cited by 47
Community‐based protest against construction projects: a case study of movement continuity
Teo, M. M., & Loosemore, M. (2011) · Construction Management and Economics · doi:10.1080/01446193.2010.535545 · Cited by 45
Artificial Intelligence Applications in Transportation Geotechnics
Correia, A. G., Cortez, P. C., Tinoco, J., & Marques, R. F. P. (2012) · Geotechnical and Geological Engineering · doi:10.1007/s10706-012-9585-3 · Cited by 44
Bobrow, D. G. (1993) · Artificial Intelligence · doi:10.1016/0004-3702(93)90163-6 · Cited by 43
Comparison of Digital Water Marking methods
Mistry, D. (2013) · Cited by 43
A project control process in pre‐construction phases
Al‐Reshaid, K., Kartam, N., Tewari, N., & Albader, H. B. (2005) · Engineering Construction & Architectural Management · doi:10.1108/09699980510608811 · Cited by 42
Qureshi, A. H., Alaloul, W. S., Manzoor, B., Musarat, M. A., Saad, S., & Ammad, S. (2020) · International Sustainability and Resilience Conference · doi:10.1109/ieeeconf51154.2020.9319974 · Cited by 41
Self-citationInnovation Management and Construction Phases in Infrastructure Projects
Noktehdan, M., Shahbazpour, M., Zare, M. R., & Wilkinson, S. J. (2018) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001608 · Cited by 40
Shaheen, A. A., Fayek, A. R., & AbouRizk, S. (2009) · Canadian Journal of Civil Engineering · doi:10.1139/l09-091 · Cited by 36
Bastianoni, S., Galli, A., Pulselli, R. M., & Niccolucci, V. (2007) · AMBIO · doi:10.1579/0044-7447(2007)36[559:eaeeon]2.0.co;2 · Cited by 35
Introduction to Artificial Intelligence
Zhang, L., Pan, Y., Wu, X., & Skibniewski, M. J. (2021) · Lecture notes in civil engineering · doi:10.1007/978-981-16-2842-9_1 · Cited by 35
Lean Deconstruction Approach for Buildings Demolition Processes using BIM
Marzouk, M. M., Elmaraghy, A., & Voordijk, H. (2019) · University of Twente Research Information · Cited by 30
Mihić, M., Vukomanović, M., & Završki, I. (2019) · Organization Technology and Management in Construction An International Journal · doi:10.2478/otmcj-2019-0004 · Cited by 30
Comparison of artificial intelligence algorithms to estimate sustainability indicators
Bienvenido-Huertas, D., Farinha, F., Oliveira, M. J., Silva, E., & Lança, R. (2020) · Sustainable Cities and Society · doi:10.1016/j.scs.2020.102430 · Cited by 30
Evolutionary Computation in Civil Engineering: Research Frontiers
Arciszewski, T., & Jong, K. A. D. (2009) · Computational science, engineering and technology series · doi:10.4203/csets.5.7 · Cited by 28
Wei, Q., & Lin, Q. (2021) · Microprocessors and Microsystems · doi:10.1016/j.micpro.2021.103880 · Cited by 28
Four Decades of Computing in Civil Engineering
Adeli, H. (2019) · Lecture notes in civil engineering · doi:10.1007/978-981-15-0802-8_1 · Cited by 26
A dynamic model of the effects of project complexity on time to complete construction projects
Lebcir, M., & Choudrie, J. (2011) · University of Hertfordshire Research Archive (University of Hertfordshire) · Cited by 25
Incorporation of Computer Simulations into Teaching Linear Scheduling Techniques
Forcael, E., Glagola, C. R., & González, V. A. (2012) · Journal of Professional Issues in Engineering Education and Practice · doi:10.1061/(asce)ei.1943-5541.0000071 · Cited by 25
An implementation of a teleoperation system for robotic beam assembly in construction
Jung, K., Chu, B., Park, S., & Hong, D. (2013) · International Journal of Precision Engineering and Manufacturing · doi:10.1007/s12541-013-0049-3 · Cited by 25
Mitropoulos, L. K., & Prevedouros, P. D. (2016) · Transportation Planning and Technology · doi:10.1080/03081060.2016.1174363 · Cited by 24
Community‐based protest against construction projects
Teo, M. M., & Loosemore, M. (2010) · International Journal of Managing Projects in Business · doi:10.1108/17538371011036554 · Cited by 23
State-of-the-Art Review on the Applicability of AI Methods to Automated Construction Manufacturing
Hatami, M., Flood, I., Franz, B. W., & Zhang, X. (2019) · ASCE International Conference on Computing in Civil Engineering (i3CE) · doi:10.1061/9780784482438.047 · Cited by 21
Yi, W., & Wang, S. (2016) · Computer-Aided Civil and Infrastructure Engineering · doi:10.1111/mice.12239 · Cited by 20
Emerging Market Economy (EME) and Artificial Intelligence (AI): Consequences for the Future of Jobs
Donepudi, P. K., Abmed, D. A. A. A., & Saha, S. (2020) · Zenodo (CERN European Organization for Nuclear Research) · doi:10.5281/zenodo.5562661 · Cited by 19
Zhu, X. (2021) · E3S Web of Conferences · doi:10.1051/e3sconf/202124503091 · Cited by 18
AlRukaibi, F., Alsaleh, R., & Sayed, T. (2019) · Sustainability · doi:10.3390/su11143822 · Cited by 14
Safety Management Model During Construction Focusing on Building Information Modeling (BIM)
Manzoor, B., & Othman, I. (2021) · Lecture notes in civil engineering · doi:10.1007/978-981-33-6560-5_4 · Cited by 12
Self-citationThe Application of Artificial Intelligence to Reduce Greenhouse Gas Emissions in the Mining Industry
Soofastaei, A. (2019) · IntechOpen eBooks · doi:10.5772/intechopen.80868 · Cited by 11
Application of digital technologies about water network in steel industry
Wang, J., Li, S., Xiong, G., & Cang, D. (2011) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2010.12.011 · Cited by 10
Artificial Neural Networks (ANNs) and Solution of Civil Engineering Problems
Yücel, M., Ni̇gdeli, S. M., & Bekdaş, G. (2019) · Advances in computational intelligence and robotics book series · doi:10.4018/978-1-7998-0301-0.ch002 · Cited by 8
Risk management in the different phases of a construction project : a study of actors' involvement
Osipova, E. (2007) · Diva portal (Dalarna University Library) · Cited by 5
Research works printed but not linked: 4
- Lukovac, 2018, Normalized weighted geometric bonferroni mean operator of interval rough numbers–application in interval rough dematel-copras model, Facta Univ. Ser. Mech. Eng., 16, 171
- Vyas, 2018, Artificial intelligence: The beginning of a new era in pharmacy profession, Asian J. Pharm, 12, 72
- Amico, 2016, How artificial intelligence will redefine management, Harv. Bus. Rev., 2, 1
- Bannerjee, 2018, Artificial intelligence in agriculture: A literature survey, Int. J. Sci. Res. Comput. Sci. Appl. Manag. Stud., 7, 1
Cited by
Sorted by citations
Rafsanjani, H. N., & Nabizadeh, A. H. (2023) · Computers in Human Behavior Reports · doi:10.1016/j.chbr.2023.100319 · Cited by 187
Waqar, A., Othman, I., Shafiq, N., & Mansoor, M. S. (2023) · Artificial Intelligence Review · doi:10.1007/s10462-023-10467-7 · Cited by 120
Self-citationKoutsoloukas, L., Nikitas, N., & Aristidou, P. (2022) · Developments in the Built Environment · doi:10.1016/j.dibe.2022.100094 · Cited by 117
Role of ChatGPT and Similar Generative Artificial Intelligence (AI) in Construction IndustryPreprint
Rane, N. (2023) · SSRN Electronic Journal · doi:10.2139/ssrn.4598258 · Cited by 119
Tjebane, M. M., Musonda, I., & Okoro, C. S. (2022) · Frontiers in Built Environment · doi:10.3389/fbuil.2022.823998 · Cited by 79
Metadata
- Authors
- Manzoor, B., Othman, I., Durdyev, S., Ismail, S., & Wahab, M.
- Affiliations
- Universiti Teknologi Petronas (MY)
- Ara Institute of Canterbury (NZ)
- University of Technology Malaysia (MY)
- Corresponding author
- Durdyev, Serdar
- Venue
- Applied System Innovation
- Publisher
- MDPI AG
- Published
- 2021-08-06
- Volume
- 4
- Issue
- 3
- Pages
- 52
- ISSN
- 2571-5577 (ISSN-L)
- OpenAlex
- W3190382256
- Cited by
- 118
- References
- 142
- Citations by year
- 2026: 24 · 2025: 30 · 2024: 27 · 2023: 17 · 2022: 13 · 2021: 7
- FWCI
- 1.48
- Type
- journal article
- Language
- en
- Open access
- gold
- doi.org
- Licence
- Locations
- Applied System Innovation (publishedVersion, cc-by)
- DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion, cc-by-sa)
- Topics
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Physical Sciences › Engineering › Civil and Structural Engineering › Civil and Structural Engineering Research
- Physical Sciences › Engineering › Civil and Structural Engineering › Infrastructure Maintenance and Monitoring
- Keywords
- artificial intelligence in civil engineering, sustainable development, sustainable construction, construction automation, machine learning, computer vision, expert systems, artificial neural networks, research trends, digital technologies in construction
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review