Investigating the Use of ChatGPT for the Scheduling of Construction Projects
Open accessThe DOI matches its Crossref record; 30 of the 30 references it cites were found in a registry or an index.
Abstract
Generative Pre-Trained Transformer (GPT) language models such as ChatGPT have the potential to revolutionize the construction industry by automating repetitive and time-consuming tasks. This paper presents a study in which ChatGPT was used to generate a construction schedule for a simple construction project. The output from ChatGPT was evaluated by a pool of participants that provided feedback regarding their overall interaction experience and the quality of the output. The results show that ChatGPT can generate a coherent schedule that follows a logical approach to fulfill the requirements of the scope indicated. The participants had an overall positive interaction experience and indicated the potential of such a tool in automating many preliminary and time-consuming tasks. However, the technology still has limitations, and further development is needed before it can be widely adopted in the industry. Overall, this study highlights the advantages of using large language models and Natural Language Processing (NLP) techniques in the construction industry and the need for further research.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Figures










Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
The source backs part of the claim, not all of it — or backs it for a different population, condition or comparison.
In the citing paper
“Prompt sensitivity is another limitation”
From A review of LLMs and their applications in the architecture, engineering and construction industry (2025) · cites this paper as Prieto et al. (2023)
Experimental — accuracy not yet measuredThe cited source says what the claim attributes to it.
In the citing paper
“Key limitations exhibited include omitting important steps, proposing tasks that were not needed, and missing details of the process like the curing time needed for materials, indicating lack of construction-specific knowledge and raising concerns regarding reliability and accuracy, especially in complex real-world scheduling tasks.”
From A review of LLMs and their applications in the architecture, engineering and construction industry (2025) · cites this paper as Prieto et al. (2023)
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
BERT: Pre-training of Deep Bidirectional Transformers for Language Understanding
Devlin, J., Chang, M.-W., Lee, K., & Toutanova, K. (2018) · arXiv · doi:10.48550/arxiv.1810.04805 · Cited by 73,173 · cited 1×
“BERT was first introduced by Google in 2018 [13] and has been the state-of-the-art for many of the NLP models developed afterward.”
MethodLanguage Models are Few-Shot Learners
Brown, T. B., Mann, B., Ryder, N., Subbiah, M., Kaplan, J., Dhariwal, P., Neelakantan, A., Shyam, P., Sastry, G., Askell, A., et al. (2020) · arXiv · doi:10.48550/arxiv.2005.14165 · Cited by 23,372 · cited 5×
“Floridi and Chiriatti [12] studied the scope, limits and consequences of the GPT-3 model and how society will have to get used to not being able to tell if a text was written by a human or an AI.”
BackgroundInfluentialExploring the Limits of Transfer Learning with a Unified Text-to-Text Transformer
Raffel, C., Shazeer, N., Roberts, A., Lee, K., Narang, S., Matena, M., Zhou, Y., Li, W., & Liu, P. J. (2019) · arXiv · doi:10.48550/arxiv.1910.10683 · Cited by 10,929 · cited 1×
“T5 was introduced by Google in 2020 [17].”
BackgroundGPT-3: Its Nature, Scope, Limits, and Consequences
Floridi, L., & Chiriatti, M. (2020) · Minds and Machines · doi:10.1007/s11023-020-09548-1 · Cited by 2,519
Chowdhary, K. R. (2020) · Fundamentals of Artificial Intelligence · doi:10.1007/978-81-322-3972-7_19 · Cited by 1,002
Fundamentals of Artificial Intelligence
Chowdhary, K. R. (2020) · doi:10.1007/978-81-322-3972-7 · Cited by 392
Tixier, A. J.-P., Hallowell, M. R., Rajagopalan, B., & Bowman, D. (2016) · Automation in Construction · doi:10.1016/j.autcon.2015.11.001 · Cited by 333
Korngiebel, D. M., & Mooney, S. D. (2021) · npj Digital Medicine · doi:10.1038/s41746-021-00464-x · Cited by 259
Integrating semantic NLP and logic reasoning into a unified system for fully-automated code checking
Zhang, J., & El-Gohary, N. M. (2017) · Automation in Construction · doi:10.1016/j.autcon.2016.08.027 · Cited by 255
Naseem, U., Razzak, I., Khan, S. K., & Prasad, M. (2021) · ACM Transactions on Asian and Low-Resource Language Information Processing · doi:10.1145/3434237 · Cited by 194 · cited 1×
“Within the field of NLP, research has been focused on developing Large Language representation Models (LLM) that expand the applicability of NLP to more detailed human language understanding tasks such as translation, text classification, and holding conversations [11,12].”
MethodZou, Y., Kiviniemi, A., & Jones, S. W. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.04.003 · Cited by 167
Applications of natural language processing in construction
Ding, Y., Ma, J., & Luo, X. (2022) · Automation in Construction · doi:10.1016/j.autcon.2022.104169 · Cited by 161
Moon, S., Chi, S., & Im, S.-B. (2022) · Automation in Construction · doi:10.1016/j.autcon.2022.104465 · Cited by 134
Digital Transformation of the Design, Construction and Management Processes of the Built Environment
(2020) · Research for Development · doi:10.1007/978-3-030-33570-0 · Cited by 109
Locatelli, M., Seghezzi, E., Pellegrini, L., Tagliabue, L. C., & Giuda, G. M. D. (2021) · Buildings · doi:10.3390/buildings11120583 · Cited by 101 · cited 1×
“The rest of the paper is organized as follows: Section 2 provides a brief state-of-the-art study on various language representation models and the current trend in project management tools.”
BackgroundHassan, F. U., Le, T., & Lv, X. (2021) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002122 · Cited by 89
Data-Driven Machine Learning Approach to Integrate Field Submittals in Project Scheduling
Awada, M., Srour, F. J., & Srour, I. (2020) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000873 · Cited by 77 · cited 1×
“Several approaches have been proposed for performing predictive modeling to utilize historical data to predict project outcomes [27].”
MethodAmer, F., Jung, Y., & Golparvar-Fard, M. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103929 · Cited by 68
Comparing Natural Language Processing Methods to Cluster Construction Schedules
Hong, Y., Xie, H. S., Bhumbra, G. S., & Brilakis, I. K. (2021) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0002165 · Cited by 52
BIM-based draft schedule generation in reinforced concrete-framed buildings
Wang, Z., & Azar, E. R. (2019) · Construction Innovation · doi:10.1108/ci-11-2018-0094 · Cited by 46
Language Representation Models: An Overview
Schomacker, T., & Tropmann-Frick, M. (2021) · Entropy · doi:10.3390/e23111422 · Cited by 29 · cited 2×
“Within the field of NLP, research has been focused on developing Large Language representation Models (LLM) that expand the applicability of NLP to more detailed human language understanding tasks such as translation, text classification, and holding conversations [11,12].”
BackgroundMethodVisual Data and Predictive Analytics for Proactive Project Controls on Construction Sites
Lin, J. J., & Golparvar‐Fard, M. (2018) · Lecture notes in computer science · doi:10.1007/978-3-319-91635-4_21 · Cited by 28
A Chatbot System for Construction Daily Report Information Management
Cho, J., & Lee, G. (2019) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2019/0058 · Cited by 23 · cited 1×
“Improving communication on construction sites: NLP-powered chatbots and virtual assistants can be used to improve communication on construction sites by providing a quick and convenient way for project stakeholders to access information and ask questions about the project [4].”
BackgroundGraph-Based Automated Construction Scheduling without the Use of BIM
Hong, Y., Xie, H. S., Agapaki, E., & Brilakis, I. K. (2022) · Journal of Construction Engineering and Management · doi:10.1061/jcemd4.coeng-12687 · Cited by 22 · cited 2×
“Therefore, the BIM-based automatic generation of schedules requires manual intervention to be practical [25,26].”
BackgroundMethodAutomated Construction Contract Summarization Using Natural Language Processing and Deep Learning
Xue, X., Hou, Y., & Zhang, J. (2022) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2022/0063 · Cited by 19 · cited 2×
“Some examples include the work by Xue et al. [2] that used NLP techniques to summarize construction contracts.”
BackgroundMethodDeveloping AI Based Scheme for Project Planning by Expert Merging Revit and Primavera Software
Aljebory, K. M., & QaisIssam, M. (2019) · International Multi-Conference on Systems, Signals & Devices (SSD) · doi:10.1109/ssd.2019.8893274 · Cited by 18 · cited 1×
“Researchers improved the process of manual schedule development by automating task dependency and sequencing using pre-set rules, patterns or pre-set knowledge learned from historic cases[18,19].”
MethodNatural Language Processing and Information Systems
(2022) · Lecture notes in computer science · doi:10.1007/978-3-031-08473-7 · Cited by 14
Advanced Computing Strategies for Engineering
(2018) · Lecture notes in computer science · doi:10.1007/978-3-319-91638-5 · Cited by 14
Natural Language Processing for Information and Project Management
Giuda, G. M. D., Locatelli, M., Schievano, M., et al. (2019) · Research for development · doi:10.1007/978-3-030-33570-0_9 · Cited by 14 · cited 1×
“(2) Analyzing construction site data: NLP can be used to analyze construction site data, such as progress reports, safety inspections, and quality control reports, and extract insights that can help improve project efficiency and mitigate risks [3].”
BackgroundA corpus database for cybersecurity topic modeling in the construction industry
Yao, D., & de Soto, B. G. (2023) · International Symposium on Automation and Robotics in Construction (ISARC) · doi:10.22260/isarc2023/0072 · Cited by 11 · cited 1×
“Yao and Garcia de Soto [16] used a BERT model classification for semantic screening trained on construction-specific documentation to investigate main topics related to construction cybersecurity.”
Method
Research works printed but not linked: 1
- 18. Y. Jung, A. Fouad, M. Golparver-Fard, A systematic review on the requirements on BIM maturity and formal representation of sequencing knowledge for automated construction scheduling, in: Proceedings of the 38th International Conference of CIB, Luxembourg, 2021: pp. 429-436. https://itc.scix.net/paper/w78-2021-paper-043 (accessed January 13, 2023).
Cited by
Summary of ChatGPT-Related Research and Perspective Towards the Future of Large Language Models
Liu, Y., Han, T., Ma, S., Zhang, J., Yang, Y., Tian, J., He, H., Li, A., He, M., Liu, Z., et al. (2023) · arXiv · doi:10.48550/arxiv.2304.01852 · Cited by 1,172
ChatGPT and Open-AI Models: A Preliminary Review
Roumeliotis, K. I., & Tselikas, N. D. (2023) · Future Internet · doi:10.3390/fi15060192 · Cited by 706
“Prieto et al. demonstrated how ChatGPT could generate a construction schedule for a simple construction project [72].”
BackgroundMethodSummary of ChatGPT-Related research and perspective towards the future of large language models
Liu, Y., Han, T., Ma, S., Zhang, J., Yang, Y., Tian, J., He, H., Li, A., He, M., Liu, Z., et al. (2023) · Meta-Radiology · doi:10.1016/j.metrad.2023.100017 · Cited by 855
“Prieto et al. [77] evaluated the use of ChatGPT in developing an automated construction schedule based on natural language prompts.”
BackgroundOne Small Step for Generative AI, One Giant Leap for AGI: A Complete Survey on ChatGPT in AIGC Era
Zhang, C., Zhang, C., Li, C., Qiao, Y., Zheng, S., Dam, S. K., Zhang, M., Kim, J. U., Kim, S. T., Park, G., et al. (2023) · arXiv (Cornell University) · doi:10.13140/rg.2.2.24789.70883 · Cited by 91
Tsai, M.-L., Ong, C. W., & Chen, C.-L. (2023) · Education for Chemical Engineers · doi:10.1016/j.ece.2023.05.001 · Cited by 197
Metadata
- Authors
- Prieto, S. A., Mengiste, E. T., & García de Soto, B.
- Affiliations
- New York University Abu Dhabi (AE)
- S.M.A.R.T. Construction Research Group, Division of Engineering, New York University Abu Dhabi (NYUAD), Experimental Research Building, Saadiyat Island, Abu Dhabi P.O. Box 129188, United Arab Emirates
- Corresponding author
- Prieto, Samuel A.
- Venue
- Buildings
- Publisher
- MDPI AG
- Published
- 2023-03-24
- Volume
- 13
- Issue
- 4
- Pages
- 857
- ISSN
- 2075-5309 (ISSN-L)
- OpenAlex
- W4360847209
- Semantic Scholar
- 58b98ccd256f1ebe8551faa6798cfbfc80c490a5
- Cited by
- 229
- References
- 24
- Citations by year
- 2026: 50 · 2025: 71 · 2024: 72 · 2023: 36
- FWCI
- 27.50
- Type
- journal article
- Language
- en
- Open access
- gold
- doi.org
- Licence
- Locations
- Buildings (publishedVersion, cc-by)
- arXiv (Cornell University) (submittedVersion, cc-by-nc-nd)
- DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion, cc-by-sa)
- arXiv (Cornell University)
- Funders
- New York University Abu Dhabi (G1104, CG001)
- York University
- Tamkeen (CG001, G1104)
- Topics
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Physical Sciences › Computer Science › Artificial Intelligence › Artificial Intelligence Applications
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Keywords
- ChatGPT, large language models, construction scheduling, schedule generation, user evaluation, interaction experience, output quality
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.