Prediction of Risk Delay in Construction Projects Using a Hybrid Artificial Intelligence Model
Open accessAbstract
Project delays are the major problems tackled by the construction sector owing to the associated complexity and uncertainty in the construction activities. Artificial Intelligence (AI) models have evidenced their capacity to solve dynamic, uncertain and complex tasks. The aim of this current study is to develop a hybrid artificial intelligence model called integrative Random Forest classifier with Genetic Algorithm optimization (RF-GA) for delay problem prediction. At first, related sources and factors of delay problems are identified. A questionnaire is adopted to quantify the impact of delay sources on project performance. The developed hybrid model is trained using the collected data of the previous construction projects. The proposed RF-GA is validated against the classical version of an RF model using statistical performance measure indices. The achieved results of the developed hybrid RF-GA model revealed a good resultant performance in terms of accuracy, kappa and classification error. Based on the measured accuracy, kappa and classification error, RF-GA attained 91.67%, 87% and 8.33%, respectively. Overall, the proposed methodology indicated a robust and reliable technique for project delay prediction that is contributing to the construction project management monitoring and sustainability.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Machine learning algorithms for construction projects delay risk prediction
Gondia, A., Siam, A., El-Dakhakhni, W., & Nassar, A. H. (2020) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0001736 · Cited by 327
Cited by
Opportunities and Adoption Challenges of AI in the Construction Industry: A PRISMA Review
Regona, M., Yigitcanlar, T., Xia, B., & Li, R. Y. M. (2022) · Journal of Open Innovation: Technology, Market, and Complexity · doi:10.3390/joitmc8010045 · Cited by 543
Regona, M., Yigitcanlar, T., Hon, C., & Teo, M. (2024) · Sustainable Cities and Society · doi:10.1016/j.scs.2024.105499 · Cited by 254
Ghimire, P., Kim, K., & Acharya, M. (2024) · Buildings · doi:10.3390/buildings14010220 · Cited by 175
Applied artificial intelligence for predicting construction projects delay
Egwim, C. N., Alaka, H., Toriola-Coker, L. O., Balogun, H., & Sunmola, F. (2021) · Machine Learning with Applications · doi:10.1016/j.mlwa.2021.100166 · Cited by 125
Manzoor, B., Othman, I., Durdyev, S., Ismail, S., & Wahab, M. (2021) · Applied System Innovation · doi:10.3390/asi4030052 · Cited by 118
Metadata
- Authors
- Yaseen, Z. M., Ali, Z. H., Salih, S. Q., & Al-Ansari, N.
- Venue
- Sustainability
- Publisher
- MDPI AG
- Published
- 2020-02-18
- Volume
- 12
- Issue
- 4
- Pages
- 1514
- ISSN
- 2071-1050 (ISSN-L)
- OpenAlex
- W3008084213
- Cited by
- 194
- References
- 1
- FWCI
- 13.86
- Type
- journal article
- Language
- en
- Open access
- gold
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Prediction of Risk Delay in Construction Projects Using a Hybrid Artificial Intelligence Model. https://app.cochat.ai/papers/10.3390/su12041514
- The paper
- Yaseen, Z. M., Ali, Z. H., Salih, S. Q., & Al-Ansari, N. (2020). Prediction of Risk Delay in Construction Projects Using a Hybrid Artificial Intelligence Model. Sustainability. https://doi.org/10.3390/su12041514
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.