Machine Learning Algorithms for Construction Projects Delay Risk Prediction

Gondia, Ahmed, Siam, Ahmad, El-Dakhakhni, Wael, Nassar, Ayman H. · 2020 · Journal of Construction Engineering and Management

The DOI matches its Crossref record; 62 of the 62 references it cites were found in a registry or an index.

Abstract

Projects delays are among the most pressing challenges faced by the construction sector attributed to the sector’s complexity and its inherent delay risk sources’ interdependence. Machine learning offers an ideal set of techniques capable of tackling such complex systems; however, adopting such techniques within the construction sector remains at an early stage. The goal of this study was to identify and develop machine learning models in order to facilitate accurate project delay risk analysis and prediction using objective data sources. As such, relevant delay risk sources and factors were first identified, and a multivariate data set of previous projects’ time performance and delay-inducing risk sources was then compiled. Subsequently, the complexity and interdependence of the system was uncovered through an exploratory data analysis. Accordingly, two suitable machine learning models, utilizing decision tree and naïve Bayesian classification algorithms, were identified and trained using the data set for predicting project delay extents. Finally, the predictive performances of both models were evaluated through cross validation tests, and the models were further compared using machine-learning-relevant performance indices. The evaluation results indicated that the naïve Bayesian model provides a better predictive performance for the data set examined. Ultimately, the work presented herein harnesses the power of machine learning to facilitate evidence-based decision making, while inherent risk factors are active, interdependent, and dynamic, thus empowering proactive project risk management strategies.

Overview

Integrity signals

Registry

Crossref · 10.1061/(asce)co.1943-7862.0001736

Cites

62 of 62 references verified0 citation errors · 0 not checkable

Statistics

Recomputing p-values needs the paper’s full text.

Verification

Claims the paper makes

This paper’s full text isn’t openly available, so its claims and self-check weren’t run. The registry and citation checks still apply.

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

Citations

Cites

Show all 62 references

Research works printed but not linked: 3

  1. Ismail I., 2014, Expert opinion on risk level for factors affecting time and cost overrun along the project lifecycle in Malaysian construction projects, Int. J. Constr. Technol. Manage., 1, 10
  2. Ng A. Y., 2002, Advances in neural information processing systems, 841
  3. R Core Team, 2013, A language and environment for statistical computing

Cited by

See all 374

Metadata

Authors
Gondia, A., Siam, A., El-Dakhakhni, W., & Nassar, A. H.
Affiliations
  • McMaster University (CA)
  • German University in Cairo (EG)
Corresponding author
Gondia, Ahmed
Venue
Journal of Construction Engineering and Management
Published
2020-01
Volume
146
Issue
1
ISSN
  • 0733-9364 (ISSN-L)
  • 1943-7862
OpenAlex
W2982358567
Cited by
327
References
61
Citations by year
2026: 52 · 2025: 72 · 2024: 58 · 2023: 50 · 2022: 54 · 2021: 28 · 2020: 13
FWCI
16.94
Type
journal article
Language
en
Open access
closed
Locations
Journal of Construction Engineering and Management (publishedVersion)
Topics
  • Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
  • Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
  • Social Sciences › Economics, Econometrics and Finance › Finance › Capital Investment and Risk Analysis
Keywords
construction delays, decision tree, naive Bayesian classification, project time performance, project risk management

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Machine Learning Algorithms for Construction Projects Delay Risk Prediction. https://app.cochat.ai/papers/10.1061/(asce)co.1943-7862.0001736
The paper
Gondia, A., Siam, A., El-Dakhakhni, W., & Nassar, A. H. (2020). Machine Learning Algorithms for Construction Projects Delay Risk Prediction. Journal of Construction Engineering and Management. https://doi.org/10.1061/(asce)co.1943-7862.0001736

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.