Extreme Gradient Boosting-Based Machine Learning Approach for Green Building Cost Prediction
Open accessThe DOI matches its Crossref record; 36 of the 36 references it cites were found in a registry or an index.
Abstract
Accurate building construction cost prediction is critical, especially for sustainable projects (i.e., green buildings). Green building construction contracts are relatively new to the construction industry, where stakeholders have limited experience in contract cost estimation. Unlike conventional building construction, green buildings are designed to utilize new technologies to reduce their operations’ environmental and societal impacts. Consequently, green buildings’ construction bidding and awarding processes have become more complicated due to difficulties forecasting the initial construction costs and setting integrated selection criteria for the winning bidders. Thus, robust green building cost prediction modeling is essential to provide stakeholders with an initial construction cost benchmark to enhance decision-making. The current study presents machine learning-based algorithms, including extreme gradient boosting (XGBOOST), deep neural network (DNN), and random forest (RF), to predict green building costs. The proposed models are designed to consider the influence of soft and hard cost-related attributes. Evaluation metrics (i.e., MAE, MSE, MAPE, and R2) are applied to evaluate and compare the developed algorithms’ accuracy. XGBOOST provided the highest accuracy of 0.96 compared to 0.91 for the DNN, followed by RF with an accuracy of 0.87. The proposed machine learning models can be utilized as a decision support tool for construction project managers and practitioners to advance automation as a coherent field of research within the green construction industry.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
XGBoost: A Scalable Tree Boosting System
Chen, T., & Guestrin, C. (2016) · Proceedings of the 22nd ACM SIGKDD International Conference on Knowledge Discovery and Data Mining · doi:10.1145/2939672.2939785 · Cited by 54,569
Classification and Regression by randomForest
Liaw, A. I., & Wiener, M. C. (2007) · Cited by 18,594
Applying multi-objective genetic algorithms in green building design optimization
Wang, W., Zmeureanu, R., & Rivard, H. (2005) · Building and Environment · doi:10.1016/j.buildenv.2004.11.017 · Cited by 726
Barriers and drivers for sustainable building
Häkkinen, T., & Belloni, K. (2011) · Building Research & Information · doi:10.1080/09613218.2011.561948 · Cited by 693
Vieira, S., Pinaya, W. H. L., & Mechelli, A. (2017) · Neuroscience & Biobehavioral Reviews · doi:10.1016/j.neubiorev.2017.01.002 · Cited by 656
Shehadeh, A., Alshboul, O., Al Mamlook, R. E., & Hamedat, O. (2021) · Automation in Construction · doi:10.1016/j.autcon.2021.103827 · Cited by 413
Self-citationA strategic framework for sustainable construction in developing countries
Du Plessis, C. (2007) · Construction Management and Economics · doi:10.1080/01446190600601313 · Cited by 333
Green property development practice in China: Costs and barriers
Zhang, X., Platten, A., & Shen, L. (2011) · Building and Environment · doi:10.1016/j.buildenv.2011.04.031 · Cited by 307
Lean Processes for Sustainable Project Delivery
Lapinski, A. R., Horman, M. J., & Riley, D. R. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:10(1083 · Cited by 268
Random forest for ordinal responses: Prediction and variable selection
Janitza, S., Tutz, G., & Boulesteix, A.-L. (2016) · Computational Statistics & Data Analysis · doi:10.1016/j.csda.2015.10.005 · Cited by 231
Research works printed but not linked: 27
- Fan, K., Chan, E.H.W., and Chau, C.K. (2018). Costs and Benefits of Implementing Green Building Economic Incentives: Case Study of a Gross Floor Area Concession Scheme in Hong Kong. Sustainability, 10. · doi:10.3390/su10082814
- Alhazmi, 2000, Project Procurement System Selection Model, J. Constr. Eng. Manag., 126, 176, 10.1061/(ASCE)0733-9364(2000)126:3(176) · doi:10.1061/(asce)0733-9364(2000)126:3(176
- Ioannou, 1993, Average-Bid Method—Competitive Bidding Strategy, J. Constr. Eng. Manag., 119, 131, 10.1061/(ASCE)0733-9364(1993)119:1(131) · doi:10.1061/(asce)0733-9364(1993)119:1(131
- Drew, 2006, Testing Vickery’s Revenue Equivalence Theory in Construction Auctions, J. Constr. Eng. Manag., 132, 425, 10.1061/(ASCE)0733-9364(2006)132:4(425) · doi:10.1061/(asce)0733-9364(2006)132:4(425
- Alshboul, 2022, Governmental Investment Impacts on the Construction Sector Considering the Liquidity Trap, J. Manag. Eng., 38, 04021099, 10.1061/(ASCE)ME.1943-5479.0001003 · doi:10.1061/(asce)me.1943-5479.0001003
- Molenaar, 2003, Engineering the Procurement Phase to Achieve Best Value, Leadersh. Manag. Eng., 3, 137, 10.1061/(ASCE)1532-6748(2003)3:3(137) · doi:10.1061/(asce)1532-6748(2003)3:3(137
- Holt, 1994, Factors influencing U.K. construction clients’ choice of contractor, Build. Environ., 29, 241, 10.1016/0360-1323(94)90074-4 · doi:10.1016/0360-1323(94)90074-4
- Williams, 2003, Predicting final cost for competitively bid construction projects using regression models, Int. J. Proj. Manag., 21, 593, 10.1016/S0263-7863(03)00004-8 · doi:10.1016/s0263-7863(03)00004-8
- Gunduz, 2009, Damage to Treasury: Abnormally Low Tenders in Public Construction Works, J. Leg. Aff. Disput. Resolut. Eng. Constr., 1, 130, 10.1061/(ASCE)1943-4162(2009)1:3(130) · doi:10.1061/(asce)1943-4162(2009)1:3(130
- David, 2006, Bidding in sealed-bid and English multi-attribute auctions, Decis. Support Syst., 42, 527, 10.1016/j.dss.2005.02.007 · doi:10.1016/j.dss.2005.02.007
- Karakaya, 2011, An interactive approach for multi-attribute auctions, Decis. Support Syst., 51, 299, 10.1016/j.dss.2010.11.023 · doi:10.1016/j.dss.2010.11.023
- Chang, 2015, An Investigation of the Average Bid Mechanism for Procurement Auctions, Manag. Sci., 61, 1237, 10.1287/mnsc.2013.1893 · doi:10.1287/mnsc.2013.1893
- Liu, 2000, Multiple criteria models for evaluation of competitive bids, IMA J. Manag. Math., 11, 151
- Skitmore, 2002, Identifying non-competitive bids in construction contract auctions, Omega, 30, 443, 10.1016/S0305-0483(02)00057-9 · doi:10.1016/s0305-0483(02)00057-9
- Skitmore, 2016, Scoring Rules and Competitive Behavior in Best-Value Construction Auctions, J. Constr. Eng. Manag., 142, 04016035, 10.1061/(ASCE)CO.1943-7862.0001144 · doi:10.1061/(asce)co.1943-7862.0001144
- Riley, 2003, Procurement of sustainable construction services in the United States: The contractor’s role in green buildings, Ind. Environ., 26, 66
- Korkmaz, S., Swarup, L., Horman, M., Riley, D., Molenaar, K.R., Sobin, N., and Gransberg, D.D. (2009). Influence of Project Delivery Methods on Achieving Sustainable High Performance Buildings: Report on Case Studies Draft for Panel Review, Charles Pankow Foundation. Available online: https://www.researchgate.net/publication/327976578_Influence_of_Project_Delivery_Methods_on_Achieving_Sustainable_High_Performance_Buildings_Report_on_Case_Studies_Draft_for_Panel_Review.
- Riley, D., Sanvido, V., Horman, M., McLaughlin, M., and Kerr, D. (2005, January 5–7). Lean and Green: The Role of Design-Build Mechanical Competencies in the Design and Construction of Green Buildings. Proceedings of the Construction Research Congress 2005, San Diego, CA, USA. · doi:10.1061/40754(183)23
- Korkmaz, 2010, Piloting Evaluation Metrics for Sustainable High-Performance Building Project Delivery, J. Constr. Eng. Manag., 136, 877, 10.1061/(ASCE)CO.1943-7862.0000195 · doi:10.1061/(asce)co.1943-7862.0000195
- Abdelrahman, 2008, Best-Value Model Based on Project Specific Characteristics, J. Constr. Eng. Manag., 134, 179, 10.1061/(ASCE)0733-9364(2008)134:3(179) · doi:10.1061/(asce)0733-9364(2008)134:3(179
- Czarnigowska, 2019, Contractor’s bid pricing strategy: A model with correlation among competitors’ prices, Open Eng., 9, 159, 10.1515/eng-2019-0021 · doi:10.1515/eng-2019-0021
- Kubba, S. (2012). Handbook of Green Building Design and Construction: LEED, BREEAM, and Green Globes, Butterworth-Heinemann. · doi:10.1016/b978-0-12-385128-4.00003-2
- Zahirah, 2013, Soft Cost Elements That Affect Developers Decision to Build Green, J. Civ. Environ. Eng., 7, 768
- Azizi, 2015, Identification of Soft Cost Elements in Green Projects: Exploring Experts’ Experience, Procedia—Soc. Behav. Sci., 170, 18, 10.1016/j.sbspro.2015.01.009 · doi:10.1016/j.sbspro.2015.01.009
- Goodfellow, I., Bengio, Y., and Courville, A. (2016). Deep Learning, MIT Press.
- Shehadeh, 2022, Selection of heavy machinery for earthwork activities: A multi-objective optimization approach using a genetic algorithm, Alex. Eng. J., 61, 7555, 10.1016/j.aej.2022.01.010 · doi:10.1016/j.aej.2022.01.010
- Shehadeh, A., Alshboul, O., and Hamedat, O. (2021). A Gaussian mixture model evaluation of construction companies’ business acceptance capabilities in performing construction and maintenance activities during COVID-19 pandemic. Int. J. Manag. Sci. Eng. Manag., 1–11. · doi:10.1080/17509653.2021.1991851
Cited by
AI-Driven Process Mining for ESG Risk Assessment in Sustainable Management
Censi, R., Campana, P., Bellini, F., Schettino, F., & De Pucchio, C. (2025) · Buildings · doi:10.3390/buildings15234260 · Cited by 7
Metadata
- Authors
- Alshboul, O., Shehadeh, A., Almasabha, G., & Almuflih, A. S.
- Venue
- Sustainability
- Publisher
- MDPI AG
- Published
- 2022-05-29
- Volume
- 14
- Issue
- 11
- Pages
- 6651
- ISSN
- 2071-1050 (ISSN-L)
- OpenAlex
- W4281696066
- Cited by
- 169
- References
- 36
- FWCI
- 19.25
- Type
- journal article
- Language
- en
- Open access
- gold
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.