A GREY COMBINED COMPROMISE SOLUTION (COCOSO-G) METHOD FOR SUPPLIER SELECTION IN CONSTRUCTION MANAGEMENT

Open access
Yazdani, Morteza, Wen, Zhi, Liao, Huchang, Banaitis, Audrius, Turskis, Zenonas · 2019 · JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT

Abstract

This study investigates an extended version of the combined compromise solution method with grey numbers, named CoCoSo-G for short, to measure the performance of suppliers in a construction company in Madrid. Seven criteria from a relevant previous study are the basis for assessing the performance of suppliers, while ten suppliers are composing our decision matrix. To initiate the decision-making process, we invite experts to aid us in the qualitative evaluation of the suppliers using grey interval values. Two weighting methods, including the DEMATEL (Decision Making Trial and Evaluation Laboratory) and BWM (best worst method) are used to achieve the importance of supplier criteria in a combined manner. The DEMATEL method is used to realise the best and worst criteria, and the BWM is used to sort the criteria according to a linear programming formulation. The CoCoSo-G method used to release the score of each supplier and rank them. We compare the results obtained by the CoCoSo-G with those obtained by the Complex Proportional Assessment method. It is evident that offering grey values for supplier qualification, using the combined weighting tool and proposing the new CoCoSo-G approach facilitate the evaluation process while indicating trustable outcomes.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.3846/jcem.2019.11309

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 199

Metadata

Authors
Yazdani, M., Wen, Z., Liao, H., Banaitis, A., & Turskis, Z.
Venue
JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
Published
2019-11-22
Volume
25
Issue
8
Pages
858-874
ISSN
  • 1392-3730 (ISSN-L)
  • 1822-3605
OpenAlex
W2989830957
Cited by
199
References
0
FWCI
17.89
Type
journal article
Language
en
Open access
gold

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: A GREY COMBINED COMPROMISE SOLUTION (COCOSO-G) METHOD FOR SUPPLIER SELECTION IN CONSTRUCTION MANAGEMENT. https://app.cochat.ai/papers/10.3846/jcem.2019.11309
The paper
Yazdani, M., Wen, Z., Liao, H., Banaitis, A., & Turskis, Z. (2019). A GREY COMBINED COMPROMISE SOLUTION (COCOSO-G) METHOD FOR SUPPLIER SELECTION IN CONSTRUCTION MANAGEMENT. JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT. https://doi.org/10.3846/jcem.2019.11309

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.