Grid-aware Scheduling and Control of Electric Vehicle Charging Stations for Dispatching Active Distribution Networks. Part-I: Day-ahead and Numerical Validation
Open accessAbstract
This paper proposes a grid-aware scheduling and control framework for Electric Vehicle Charging Stations (EVCSs) for dispatching the operation of an active power distribution network. The framework consists of two stages. In the first stage, we determine an optimal day-ahead power schedule at the grid connection point (GCP), referred to as the dispatch plan. Then, in the second stage, a real-time model predictive control is proposed to track the day-ahead dispatch plan using flexibility from EVCSs. The dispatch plan accounts for the uncertainties of vehicles connected to the EVCS along with other uncontrollable power injections, by day-ahead predicted scenarios. We propose using a Gaussian-Mixture-Model (GMM) for the forecasting of EVCS demand using the historical dataset on arrival, departure times, EV battery capacity, State-of-Charge (SoC) targets, etc. The framework ensures that the grid is operated within its voltage and branches power-flow operational bounds, modeled by a linearized optimal power-flow model, maintaining the tractability of the problem formulation. The scheme is numerically and experimentally validated on a real-life distribution network at the EPFL connected to two EVCSs, two batteries, three photovoltaic plants, and multiple heterogeneous loads. The day-ahead and real-time stages are described in Part-I and Part-II papers respectively.
AI snapshot
Written from the paper’s full text.
TL;DR
This paper proposes a two-stage grid-aware framework for dispatching active distribution networks by using EV charging station flexibility alongside BESS, with Part-I covering the day-ahead scheduling stage and numerical validation. It shows that including EVCS flexibility substantially improves tracking of a day-ahead dispatch plan while preserving EV charging targets.
Key findings
- On Day-1, adding BESS+EVCS control reduced UEE−, UEE+, MAE, and MPP by 77%, 95%, 96%, and 77%, respectively, compared with no control.
- On Day-2, the same metrics were reduced by 75%, 90%, 92%, and 71%, respectively.
- The conclusion reports that EVCS flexibility reduced net aggregated energy error by 75–95%, maximum power error by 92–96%, and maximum power at the GCP by 71–77%.
- EV charging sessions were not significantly affected: the difference between SOC target and SOC at departure had a similar distribution with and without control, and BESS+EVCS control gave the best tracking-error spread.
Methods
- The day-ahead stage computes a 24-hour active-power dispatch plan at the grid connection point with 5-minute resolution, using scenario-based stochastic optimization and a linearized optimal power flow model for voltage, branch-current, transformer, and power-factor constraints.
- EVCS demand is forecast with parametric Gaussian Mixture Models using historical features such as charging sessions, arrival/departure times, initial/target SOCs, battery capacities, and power limits; PV uses a physics-based model with SoDa GHI and temperature forecasts, and uncontrollable demand uses a multivariate-Gaussian scenario method.
- Numerical validation is performed on a real EPFL distribution network with two EVCSs, two BESSs, three PV plants, and heterogeneous loads; the paper reports day-ahead dispatch results for a cloudy working day and a clear-sky weekend day.
Limitations
- The paper states that Part-I presents only the day-ahead stage and its numerical validation; the real-time stage and full experimental validation are deferred to Part-II.
- The paper states that V2G action is excluded, EVCS reactive power is uncontrollable and null, and the grid model uses a single-phase equivalent assuming a transposed and balanced configuration.
- The paper states that the iterative LOPF correction achieves a local optimum; it also notes that the day-ahead optimization is linear and solved with a linprog solver.
Model-written summary. Check it against the paper before relying on it.
Integrity signals
Registry
Cites
Statistics
Claims the paper makes
0 of 27 cited sources checked · 0 supported · 0 flagged
- Findingown data
In the numerical experiments, the net aggregated energy error was reduced by 75-95%.
“In the numerical experiments, it was seen that the net aggregated energy error was reduced by 75-95 %, the maximum power error was reduced by 92-96 %, and the maximum power seen at the GCP was reduced by 71-77 %.”
Quote in the paperSubstantial claim- The authors state this as an assumption: The reactive power from EVCS is uncontrollable and null.
- The authors state this as an assumption: The reactive power from PV plants is zero in the day-ahead stage.
- The authors state this as an assumption: The BESS losses are modeled by virtual resistance by adding an extra line as done for EVCS.
- Findingreasoning
For day-1, the UEE obtained with BESS+EVCS control performs best concerning the spread of the tracking error during the day.
“Fig. 7 shows that the UEE obtained with the BESS+EVCS control performs the best concerning the spread of the tracking error during the day.”
Quote in the paperSubstantial claim- The authors state this as an assumption: The reactive power from EVCS is uncontrollable and null.
- The authors state this as an assumption: The reactive power from PV plants is zero in the day-ahead stage.
- The authors state this as an assumption: The BESS losses are modeled by virtual resistance by adding an extra line as done for EVCS.
- Findingown data
In the numerical experiments, the maximum power seen at the GCP was reduced by 71-77%.
“In the numerical experiments, it was seen that the net aggregated energy error was reduced by 75-95 %, the maximum power error was reduced by 92-96 %, and the maximum power seen at the GCP was reduced by 71-77 %.”
Quote in the paperSubstantial claim- The authors state this as an assumption: The reactive power from EVCS is uncontrollable and null.
- The authors state this as an assumption: The reactive power from PV plants is zero in the day-ahead stage.
- The authors state this as an assumption: The BESS losses are modeled by virtual resistance by adding an extra line as done for EVCS.
- Findingown data
The realizations of aggregated load and PV are within the day-ahead forecasts.
“It shows that the realizations are within the day-ahead forecasts, so they can be reliably used for day-ahead dispatching.”
Quote in the paperSubstantial claim - Findingown data
In the numerical experiments, the maximum power error was reduced by 92-96%.
“In the numerical experiments, it was seen that the net aggregated energy error was reduced by 75-95 %, the maximum power error was reduced by 92-96 %, and the maximum power seen at the GCP was reduced by 71-77 %.”
Quote in the paperSubstantial claim- The authors state this as an assumption: The reactive power from EVCS is uncontrollable and null.
- The authors state this as an assumption: The reactive power from PV plants is zero in the day-ahead stage.
- The authors state this as an assumption: The BESS losses are modeled by virtual resistance by adding an extra line as done for EVCS.
- Findingown data
On day-2, the dispatch plan is tracked well in all scenarios due to active power regulation provided by the batteries and EVCSs.
“However, the dispatch plan is tracked well in all the scenarios as shown in Fig. 10b, thanks to the active power regulation provided by the batteries and EVCSs in Figs.10d, 10c and 12(a-d), respectively.”
Quote in the paperSubstantial claim- The authors state this as an assumption: The reactive power from EVCS is uncontrollable and null.
- The authors state this as an assumption: The reactive power from PV plants is zero in the day-ahead stage.
- The authors state this as an assumption: The BESS losses are modeled by virtual resistance by adding an extra line as done for EVCS.
- Findingown data
On day-2, UEE for BESS+EVCS control is much smaller than BESS-only control in reducing the dispatch tracking error.
“As shown in Fig. 11, UEE for the case of BESS+EVCS control is much smaller than BESS-only control in reducing the dispatch tracking error.”
Quote in the paperSubstantial claim- The authors state this as an assumption: The reactive power from EVCS is uncontrollable and null.
- The authors state this as an assumption: The reactive power from PV plants is zero in the day-ahead stage.
- The authors state this as an assumption: The BESS losses are modeled by virtual resistance by adding an extra line as done for EVCS.
- Findingown data
The day-ahead stage determined an optimal day-ahead power schedule (dispatch plan) that is capable of being tracked by using the flexibility offered by controllable resources.
“The day-ahead stage shown in Part-I of the paper determined an optimal day-ahead power schedule (referred to as a dispatch plan), that is capable of being tracked by using the flexibility offered by controllable resources.”
Quote in the paperSubstantial claim- The authors state this as an assumption: The reactive power from EVCS is uncontrollable and null.
- The authors state this as an assumption: The reactive power from PV plants is zero in the day-ahead stage.
- The authors state this as an assumption: The BESS losses are modeled by virtual resistance by adding an extra line as done for EVCS.
- Findingown data
EV charging sessions are not significantly affected by using EVCS services for dispatching, as the difference between SOC target and SOC departed has similar distribution with and without control.
“It shows that the difference between the SOC target and SOC departed has similar distribution with and without control, which concludes that EV charging sessions are not significantly affected by using EVCS services for dispatching.”
Quote in the paperSubstantial claim- The authors state this as an assumption: The reactive power from EVCS is uncontrollable and null.
- Findingreasoning
The scheme reduces the BESS power and energy capacities required for dispatching the network compared to when EVCS is considered uncontrollable.
“We show that such a scheme reduces the BESS power and energy capacities required for dispatching the network compared to when EVCS is considered uncontrollable.”
Quote in the paperSubstantial claim - Findingown data
On day-2, EV users' SOC is met similarly with and without control.
“The boxplots shown in Figs.12(a-d) confirm that the EV users' SOC is met similarly with and without control.”
Quote in the paperNot a substantial claim- The authors state this as an assumption: The reactive power from EVCS is uncontrollable and null.
- Findingown data
In numerical experiments on a real-life ADN, the flexibility offered by EVCS helps to achieve dispatching, i.e., tracking the day-ahead dispatch plan under stochastic scenarios is feasible.
“In our numerical experiments on a real-life ADN, we show that the flexibility offered by EVCS helps to achieve dispatching (i.e., tracking the day-ahead dispatch plan under any stochastic scenarios is feasible).”
Quote in the paperSubstantial claim- The authors state this as an assumption: The reactive power from EVCS is uncontrollable and null.
- The authors state this as an assumption: The reactive power from PV plants is zero in the day-ahead stage.
- The authors state this as an assumption: The BESS losses are modeled by virtual resistance by adding an extra line as done for EVCS.
- Premisecitation
EVCSs are already causing operational challenges such as violation of the local grid constraints on the nodal voltages and branch currents.
“This will lead to increased stochastic power demand, especially at the power distribution level where most Electric Vehicle Charging Stations (EVCSs) are hosted and are already causing several operational challenges such as violation of the local grid constraints on the nodal voltages and branch currents [3]- [5]”
Quote in the paperSubstantial claim0 of 3 sources checked- cites [3]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites [4]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites [5]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Interpretationnone given
The dispatch plan accounts for the uncertainties of vehicles connected to the EVCS along with other uncontrollable power injections, by day-ahead predicted scenarios.
“The dispatch plan accounts for the uncertainties of vehicles connected to the EVCS along with other uncontrollable power injections, by day-ahead predicted scenarios.”
Quote in the paperSubstantial claim - Interpretationnone given
The LOPF formulation is generic and can be applied to meshed or radial systems.
“This linear formulation is generic as it can be applied to meshed or radial systems.”
Quote in the paperNot a substantial claim - Interpretationreasoning
An optimal DP allows the ADN operator to locally compensate for the uncertainty of the stochastic nodal injections at the GCP by employing the available flexibility from the controllable resources.
“An optimal DP allows the ADN operator (e.g., the DSO) to locally compensate for the uncertainty of the stochastic nodal injections at the GCP by employing the available flexibility from the controllable resources.”
Quote in the paperSubstantial claim - Premisecitation
The PFSCs are computed using the method in [33] by solving a system of linear equations that admits a single solution, as proven in [34], as a function of the grid's admittance matrix and the knowledge of the system state.
“The PFSCs in (5) are computed using the method in [33] by solving a system of linear equations (that admits a single solution, as proven in [34]) as a function of the grid's admittance matrix and the knowledge of the system state.”
Quote in the paperSubstantial claim0 of 2 sources checked- cites [33]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites [34]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Interpretationnone given
A parametric multivariate GMM-based forecasting model is proposed for EVCS demand.
“Compared to previous works [23]- [25], a parametric multivariate GMM-based forecasting model is proposed for EVCS demand.”
Quote in the paperSubstantial claim0 of 3 sources checked- cites [23]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites [24]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites [25]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Premisecitation
GMMs have been shown to adequately model multi-variate stochastic trends.
“We model the EVs user behavior by GMMs, as it has been shown to adequately model multi-variate stochastic trends [27].”
Quote in the paperSubstantial claim0 of 1 sources checked- cites [27]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Premisecitation
The LOPF model allows obtaining a linear formulation for the operational constraints of the ADN without compromising the accuracy.
“Such a model allows obtaining a linear formulation for the operational constraints of the ADN (i.e., nodal voltages are respected within their statutory limits and current and power flows are within the cable ampacity and transformer capacity limits, respectively) without compromising the accuracy as shown in [26].”
Quote in the paperSubstantial claim0 of 1 sources checked- cites [26]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Interpretationreasoning
As a result, the DSO will have fewer potential risks of the operation and financial costs related to real-time balancing or reserve activation needs.
“As a result, the DSO will have fewer potential risks of the operation and financial costs related to real-time balancing or reserve activation needs [8].”
Quote in the paperSubstantial claim0 of 1 sources checked- cites [8]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- Interpretationown data
The day-ahead forecasts can be reliably used for day-ahead dispatching.
“It shows that the realizations are within the day-ahead forecasts, so they can be reliably used for day-ahead dispatching.”
Quote in the paperSubstantial claim - Interpretationreasoning
The iterative correction of PFSCs until convergence yields a local optimum of the OPF.
“This way of solving the OPF results in achieving a local optimum.”
Quote in the paperSubstantial claim - Premisereasoning
Most of the above works rely on non-parametric approaches which are dependent on recent historical data.
“Most of the above works rely on non-parametric approaches which are dependent on recent historical data.”
Quote in the paperSubstantial claim0 of 3 sources checked- cites [23]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites [24]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites [25]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- May combine two claims. 12
- Classified as probably not a substantial claim. 9
- The quote only partly states this claim. 1
May combine two claims.
Findingown dataFor day-2, with BESS+EVCS control, UEE-, UEE+, MAE, and MPP were reduced by 75%, 90%, 92%, and 71% respectively compared to without control.
“Specifically, UEE-, UEE+, MAE and MPP reduced by 75 %, 90 %, 92 %, and 71 % respectively.”
Quote in the paperSubstantial claim- The authors state this as an assumption: The reactive power from EVCS is uncontrollable and null.
- The authors state this as an assumption: The reactive power from PV plants is zero in the day-ahead stage.
- The authors state this as an assumption: The BESS losses are modeled by virtual resistance by adding an extra line as done for EVCS.
Probably not a substantial claim: may not pass S3 (load-bearing).
Findingown dataOn day-2, large PV generation resulted in power exports, especially in the middle of the day.
“As can be seen, the day corresponds to large PV generation (Fig. 13) resulting in power exports, especially in the middle of the day.”
Quote in the paperNot a substantial claimMay combine two claims.
Findingown dataThe flexibility offered by EVCS reduces the peak power and overall power variation seen at the GCP.
“It also reduces the peak power and overall power variation seen at the GCP.”
Quote in the paperSubstantial claim- The authors state this as an assumption: The reactive power from EVCS is uncontrollable and null.
- The authors state this as an assumption: The reactive power from PV plants is zero in the day-ahead stage.
- The authors state this as an assumption: The BESS losses are modeled by virtual resistance by adding an extra line as done for EVCS.
May combine two claims. The quote only partly states this claim.
Findingown dataIn day-1, all scenario profiles at the GCP merge into a single profile, the optimized dispatch plan, due to power regulation by BESS1/BESS2 and curtailment on EV charging in EVCS1/EVCS2.
“Comparing Fig. 6a and 6b, it can be observed that all the scenario profiles at the GCP merge into a single profile, which is the optimized dispatch plan.”
Quote in the paperSubstantial claim- The authors state this as an assumption: The reactive power from EVCS is uncontrollable and null.
- The authors state this as an assumption: The reactive power from PV plants is zero in the day-ahead stage.
- The authors state this as an assumption: The BESS losses are modeled by virtual resistance by adding an extra line as done for EVCS.
May combine two claims.
Findingown dataIn day-1, the SOC of BESS1 and BESS2 remained within the imposed SOC limits.
“Fig. 6c (lower panel) shows the SOC of two BESS, and it can be observed that they are within the imposed SOC limits.”
Quote in the paperNot a substantial claim- The authors state this as an assumption: The BESS losses are modeled by virtual resistance by adding an extra line as done for EVCS.
May combine two claims.
Findingown dataFor day-1, with BESS+EVCS control, UEE-, UEE+, MAE, and MPP were reduced by 77%, 95%, 96%, and 77% respectively compared to without control.
“Specifically, UEE-, UEE+, MAE and MPP reduced by 77 %, 95 %, 96 %, and 77 % respectively.”
Quote in the paperSubstantial claim- The authors state this as an assumption: The reactive power from EVCS is uncontrollable and null.
- The authors state this as an assumption: The reactive power from PV plants is zero in the day-ahead stage.
- The authors state this as an assumption: The BESS losses are modeled by virtual resistance by adding an extra line as done for EVCS.
Probably not a substantial claim: may not pass S3 (load-bearing).
Study design and conductcitationThe GMM model is cross-validated using K-fold cross-validation to avoid over-fitting.
“Each time, the model is cross-validated using the so-called K-fold cross-validation scheme [28] to avoid over-fitting.”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites [28]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
May combine two claims.
Study design and conductnone givenThe presented schemes are numerically and experimentally validated on a real-scale distribution system interfacing multiple EVCSs, demonstrating the real-life implementability of the proposed framework.
“The presented schemes are numerically and experimentally validated on a real-scale distribution system interfacing multiple EVCSs, demonstrating the reallife implement-ability of the proposed framework.”
Quote in the paperNot a substantial claimProbably not a substantial claim: may not pass S3 (load-bearing), S4 (based). May combine two claims.
Interpretationnone givenThe parametric nature of the forecasting tool is easy to train with any new historical data, and for learning the conditional probability distributions with respect to different variables.
“The parametric nature of the forecasting tool is easy to train with any new historical data, and for learning the conditional probability distributions with respect to different variables.”
Quote in the paperNot a substantial claimMay combine two claims.
PremisecitationPrevious dispatching schemes [13], [14] consider EVCS demand as uncontrollable and are likely to fail in the absence of large battery energy storage systems (BESSs).
“However, the above dispatching schemes [13], [14] consider EVCS demand as uncontrollable and are likely to fail in the absence of large battery energy storage systems (BESSs).”
Quote in the paperSubstantial claim0 of 2 sources checked- cites [13]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites [14]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Classified as probably not a substantial claim.
Interpretationnone givenThe RT-MPC utilizes flexible resources (EVCS and BESS) in real-time to compensate for power mismatches at the ADN's GCP between the optimal day-ahead DP and actual realization during the day of operation.
“The RT-MPC utilizes flexible resources (EVCS and BESS) in real-time to compensate for power mismatches at the ADN's GCP between the optimal day-ahead DP and actual realization during the day of operation.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
Study design and conductnone givenIn this work, the possibility of V2G action is excluded in line with the experimental setup.
“In this work, we exclude the possibility of V2G action in line with the experimental setup.”
Quote in the paperNot a substantial claimClassified as probably not a substantial claim. May combine two claims.
Interpretationnone givenThe day-ahead optimization problem is linear and can be efficiently solved by a linprog solver.
“It can be noted that the day-ahead OP is linear and can be efficiently solved by a linprog solver.”
Quote in the paperSubstantial claimProbably not a substantial claim: may not pass S3 (load-bearing).
PremisecitationDSOs might get penalized for unreliable balancing and dispatching of their networks.
“where the DSOs might get penalized for unreliable balancing and dispatching of their networks [9].”
Quote in the paperNot a substantial claim0 of 1 sources checked- cites [9]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
May combine two claims.
Interpretationown dataThe day-ahead and intraday formulations account for and demonstrate advantages in using the power and energy flexibility from the EVCSs.
“Compared to [13], [14], the day-ahead and intraday formulations account for and demonstrate advantages in using the power and energy flexibility from the EVCSs.”
Quote in the paperSubstantial claim0 of 2 sources checked- cites [13]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites [14]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Probably not a substantial claim: may not pass S3 (load-bearing).
PremisecitationEVCSs increase reserve requirements of transmission systems.
“as well as increasing reserve requirements of transmission systems [6], [7].”
Quote in the paperNot a substantial claim0 of 2 sources checked- cites [6]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites [7]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
Probably not a substantial claim: may not pass S3 (load-bearing).
PremisecitationDSOs may have to bear financial responsibility concerning power imbalances.
“distribution system operators (DSOs) may have to bear financial responsibility concerning power imbalances [8]- [10]”
Quote in the paperNot a substantial claim0 of 3 sources checked- cites [8]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites [9]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites [10]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
May combine two claims.
Interpretationnone givenThe framework ensures that the grid is operated within its voltage and branches power-flow operational bounds, modeled by a linearized optimal power-flow model, maintaining the tractability of the problem formulation.
“The framework ensures that the grid is operated within its voltage and branches power-flow operational bounds, modeled by a linearized optimal power-flow model, maintaining the tractability of the problem formulation.”
Quote in the paperSubstantial claimMay combine two claims.
InterpretationcitationModeling converter losses by adding virtual resistances in the power-flow equations allows the formulation to be linear and avoids extra variables for battery charge and discharge powers.
“This approximation allows the formulation to be linear and avoids the use of extra variables for battery charge and discharge powers.”
Quote in the paperSubstantial claim0 of 2 sources checked- cites [14]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
- cites [36]
Couldn’t be matched to a paper in Crossref, so it can’t be checked.
The authors state this as an assumption.
The stochastic processes for EVCS, demand, and PV are independent.
“Assuming that the stochastic processes for EVCS, demand and PV are independent, we can account for all the possible uncertainties by considering all the combinations of scenarios, i.e., N sc = N ev × N load × N pv makes the scenario set Ω = {1, . . ., N sc }).”
The authors state this as an assumption.
The grid configuration is transposed and balanced.
“We use a single-phase equivalent of the power-flow equations as we assume to have a transposed and balanced grid configuration, although the same can be easily extended to three-phase as shown in [21].”
The authors state this as an assumption.
The reactive power from EVCS is uncontrollable and null.
“In our control, the reactive power from the EVCS is uncontrollable and null (i.e., q evcs t,l,i,ω = 0, ∀t, l, i, ω).”
The authors state this as an assumption.
The reactive power from PV plants is zero in the day-ahead stage.
“The reactive power from PV plants are considered to be zero in the dayahead stage.”
The authors state this as an assumption.
The BESS losses are modeled by virtual resistance by adding an extra line as done for EVCS.
“The BESS losses are also modeled by virtual resistance by adding an extra line as done for EVCS.”
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
Each contradiction between two passages listed here was confirmed by an independent check.
EVCS1 and EVCS2 charging levels are reversed
MinorThe validation text calls EVCS1 level-2 and EVCS2 level-3, reversing the levels assigned to those stations earlier in the same section and in Table III.
“EVCS1 and EVCS2 are level-2 and commercial level-3 EVCSs, respectively.”
“The transformer-A connects a level-3 fast charging station (EVCS1) and an uncontrollable demand (ELLA).The transformer-B connects a microgrid interfaced with several distributed energy resources (three PV plants -PV1, PV2, and PV3, one controllable level-2 EV charging station -EVCS2, and one battery -BESS2)”
BESS sampling time conflicts with day-ahead resolution
MinorThe day-ahead dispatch plan has a five-minute time resolution, but its BESS state-of-charge constraint defines the sampling time as 30 seconds.
“where ∆t is the sampling time (30 sec), SoC bess /SoC bess are the minimum/maximum SoC bounds, and E bess, max represent the energy capacity.”
“an optimal schedule of the active power profile at the GCP with a time resolution of 5 minutes.”
Figure 10 caption assigns Day-2 results to day 1
MinorThe Day-2 results section identifies Fig. 10 as showing that day's dispatch computation, but the figure caption calls it day 1.
“2) Day-2 (dispatching): It corresponds to a non-working day (weekend) leading to low demand and characterized by a large PV generation as it's a clear-sky day.The results for the dispatch computation are shown in Fig. 10, 11, 12, 13.”
“Fig. 10.(a-d) Dispatch plan computation for day 1 (01-Mar.-2022).”
Cites
Irizarry, R. (2019) · Introduction to Data Science · doi:10.1201/9780429341830-29 · Cited by 2,547 · cited 1×
“Each time, the model is cross-validated using the so-called K -fold cross-validation scheme [28] to avoid over-fitting.”
MethodReynolds, D. A. (2009) · Encyclopedia of Biometrics · doi:10.1007/978-0-387-73003-5_196 · Cited by 2,062 · cited 1× · see citing works
“We model the EVs user behavior by GMMs, as it has been shown to adequately model multi-variate stochastic trends [27].”
MethodRefaeilzadeh, P., Tang, L., & Liu, H. (2009) · Encyclopedia of Database Systems · doi:10.1007/978-0-387-39940-9_565 · Cited by 1,892 · see citing works
Pvlib Python: a Python Package for Modeling Solar Energy Systems
Holmgren, W., Hansen, C. W., & Mikofski, M. (2018) · Journal of Open Source Software · doi:10.21105/joss.00884 · Cited by 1,042 · cited 1×
“Finally, to obtain the PV production, a physics-based model tool-chain [30], [31] is applied to the GHI and air temperature ( θ ) using the PV plant configuration (i.e., the tilt, azimuth angles, and the PV-plant’s nominal capacity).”
MethodRadial distribution load flow using conic programming
Jabr, R. (2006) · IEEE Transactions on Power Systems · doi:10.1109/tpwrs.2006.879234 · Cited by 742 · cited 1× · see citing works
“The grid constraints are accounted for by a linearized optimal power flow (LOPF) model from [13] which is generic enough to be applied to either meshed or radial grid configurations compared to OPF relaxations such as [32].”
MethodKolmogorov–Smirnov Test: Overview
Berger, V., & Zhou, Y.-Y. (2014) · Wiley StatsRef: Statistics Reference Online · doi:10.1002/9781118445112.stat06558 · Cited by 448 · cited 1× · see citing works
“Finally, the dominant model is determined based on (i) the smallest E , and (ii) those passing the two-sample Kolmogorov-Smirnow test [29] of critical value below 5% significance level.”
MethodAmini, M., Kargarian, A., & Karabasoglu, O. (2016) · Electric Power Systems Research · doi:10.1016/j.epsr.2016.06.003 · Cited by 394 · cited 2× · see citing works
“The work in [23] used an autoregressive integrated moving average (ARIMA) method for demand forecasting.”
MethodElectric vehicle charging demand forecasting model based on big data technologies
Arias, M. B., & Bae, S. (2016) · Applied Energy · doi:10.1016/j.apenergy.2016.08.080 · Cited by 347 · cited 2× · see citing works
“The work in [25] devised a method based on historical traffic distribution data and weather data, where they were clustered based on different traffic patterns and a relational analysis was used to find influential variables.”
MethodGerard, H., Puente, E. R., & Six, D. (2017) · Utilities Policy · doi:10.1016/j.jup.2017.09.011 · Cited by 304 · cited 1× · see citing works
“In this respect, distribution system operators (DSOs) may have to bear financial responsibility concerning power imbalances [8]–[10], where the DSOs might get penalized for unreliable balancing and dispatching of their networks [9].”
BackgroundA Real-Time Charging Scheme for Demand Response in Electric Vehicle Parking Station
Yao, L., Lim, W. H., & Tsai, T. S. (2016) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2016.2582749 · Cited by 303 · cited 1× · see citing works
“The second is to minimize EV battery wearing by avoiding large deviations of EV injections ( p evcs t,l,i,ω for plug l ∈ L i , node i ∈ N ev and scenario ω ∈ Ω at timestep t ∈ T ) between subsequent time-steps [35].”
BackgroundGonzalez Venegas, F., Petit, M., & Perez, Y. (2021) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2021.111060 · Cited by 244 · see citing works
Dong, X., Mu, Y., Xu, X., Jia, H., Wu, J., Yu, X., & Qi, Y. (2018) · Applied Energy · doi:10.1016/j.apenergy.2018.05.042 · Cited by 176 · cited 1× · see citing works
“In [18], [22], a voltage control scheme using EVCS flexibility is developed.”
MethodSossan, F., Namor, E., Cherkaoui, R., et al. (2016) · IEEE Transactions on Sustainable Energy · doi:10.1109/tste.2016.2600103 · Cited by 147 · cited 2×
“10, 11, 12, 13.”
BackgroundSelf-citationCharging Demand Forecasting Model for Electric Vehicles Based on Online Ride-Hailing Trip Data
Xing, Q., Chen, Z., Zhang, Z., Huang, X., Leng, Z., Sun, K., Chen, Y., & Wang, H. (2019) · IEEE Access · doi:10.1109/access.2019.2940597 · Cited by 138 · cited 1× · see citing works
“The work in [24] utilized online ride-haling data to extract the distributions, which were then used to sample the demand.”
MethodDistributed Control of PEV Charging Based on Energy Demand Forecast
Kisacikoglu, M. C., Erden, F., & Erdoğan, N. (2017) · IEEE Transactions on Industrial Informatics · doi:10.1109/tii.2017.2705075 · Cited by 132 · cited 1× · see citing works
“The work in [20] proposes distributed control of EV stations for leveling the EVCS load.”
BackgroundCoordinated Energy Management of Prosumers in a Distribution System Considering Network Congestion
Hu, J., Wu, J., Ai, X., & Liu, N. (2020) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2020.3010260 · Cited by 121 · cited 1× · see citing works
“The work in [19] proposed coordinated management of EV consumers for congestion management in distribution networks.”
BackgroundMPC-Based Decentralized Voltage Control in Power Distribution Systems With EV and PV Coordination
Wang, L., Dubey, A., Gebremedhin, A., et al. (2022) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2022.3156115 · Cited by 106 · cited 1× · see citing works
“In [18], [22], a voltage control scheme using EVCS flexibility is developed.”
MethodDistribution grid services and flexibility provision by electric vehicles: A review of options
Knezović, K., Marinelli, M., Codani, P., & Pérez, Y. (2015) · International Universities Power Engineering Conference (UPEC) · doi:10.1109/upec.2015.7339931 · Cited by 84 · cited 1× · see citing works
“Existing works [16]–[21] have proposed the use of EVCSs as a source of flexibility to tackle DSO operational problems as well as provide ancillary support to TSOs.”
BackgroundDispatching Stochastic Heterogeneous Resources Accounting for Grid and Battery Losses
Stai, E., Reyes-Chamorro, L., Sossan, F., Boudec, J. L., & Paolone, M. (2017) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2017.2715162 · Cited by 60 · cited 1× · see citing works
“The EVCS constraints consist of limit on the EV SOC evcs t evolution (initialized with starting EV SOC from the day-ahead scenarios), expressed as Here, we model the converter losses (excluding the EV losses) by adding virtual resistances in the power-flow equations as proposed in [14], [36].”
MethodSelf-citationGupta, R., Sossan, F., & Paolone, M. (2020) · IEEE transactions on energy conversion · doi:10.1109/tec.2020.3015271 · Cited by 56 · cited 5× · see citing works
“10, 11, 12, 13.”
BackgroundMethodInfluentialSelf-citationBozorg, M., Sossan, F., Boudec, J. L., & Paolone, M. (2018) · Electric Power Systems Research · doi:10.1016/j.epsr.2018.06.017 · Cited by 30 · cited 2× · see citing works
“In the existing literature, this issue has been tackled by proposing local grid-aware dispatchability [11]–[14].”
BackgroundSelf-citationGrid-aware distributed control of electric vehicle charging stations in active distribution grids
Fahmy, S., Gupta, R., & Paolone, M. (2020) · doi:10.1016/j.epsr.2020.106697 · Cited by 27 · cited 3×
“We use a single-phase equivalent of the power-flow equations as we assume to have a transposed and balanced grid configuration, although the same can be easily extended to three-phase as shown in [21].”
BackgroundMethodSelf-citationSossan, F., Scolari, E., Gupta, R., et al. (2019) · Journal of Renewable and Sustainable Energy · doi:10.1063/1.5109076 · Cited by 23 · cited 1×
“Finally, to obtain the PV production, a physics-based model tool-chain [30], [31] is applied to the GHI and air temperature ( θ ) using the PV plant configuration (i.e., the tilt, azimuth angles, and the PV-plant’s nominal capacity).”
MethodSelf-citationGupta, R., Fahmy, S., & Paolone, M. (2022) · Electric power systems research · doi:10.1016/j.epsr.2022.108555 · Cited by 21 · cited 1×
“The works in [13]–[15] have extended this work by incorporating the grid constraint in a low voltage distribution grid and considering various controllable resources such as a curtailable PV plant.”
BackgroundSelf-citationLavrijssen, S., Marhold, A., & Trías, A. (2016) · doi:10.2139/ssrn.2874720 · Cited by 15 · cited 2×
“In this respect, distribution system operators (DSOs) may have to bear financial responsibility concerning power imbalances [8]–[10], where the DSOs might get penalized for unreliable balancing and dispatching of their networks [9].”
BackgroundKim, S., Pollitt, M., Jin, Y., et al. (2017) · doi:10.17863/cam.15493 · Cited by 12 · cited 1×
“In this respect, distribution system operators (DSOs) may have to bear financial responsibility concerning power imbalances [8]–[10], where the DSOs might get penalized for unreliable balancing and dispatching of their networks [9].”
BackgroundGupta, R., Zecchino, A., Yi, J., et al. (2023) · IEEE Power & Energy Society General Meeting · doi:10.1109/pesgm52003.2023.10253115 · Cited by 9 · cited 5×
“2) Integration of EVCS flexibility: Compared to [13], [14], the day-ahead and intraday formulations account for and demonstrate advantages in using the power and energy flexibility from the EVCSs.”
BackgroundMethodInfluentialSelf-citationGupta, R., Zecchino, A., Yi, J.-H., et al. (2022) · IEEE Open Access Journal of Power and Energy · doi:10.1109/oajpe.2022.3216072
Self-citationChristakou, K., LeBoudec, J.-Y., Paolone, M., et al. (2013) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2012.2221751
Self-citation
Flagged first, then by citations
5 of the 34 references couldn’t be matched to a known paper.
Research works printed but not linked: 3
- Power Quality Application Guide, "Voltage disturbances," Standard EN, vol. 50160, 2004.
- IEEE Std 1159-2009, "Ieee recommended practice for monitoring elec- tric power quality," (Revision of IEEE Std 1159-1995), Tech. Rep., June 2009.
- AEMO, "Review of the black system south australia report -system event of 28 september 2016," Tech. Rep., 2017.
Cited by
Sorted by citations
Gupta, R., Fahmy, S., Chevron, M., Vasapollo, R., Figini, E., & Paolone, M. (2025) · IEEE Transactions on Smart Grid · doi:10.1109/tsg.2025.3526477 · Cited by 28 · see citing works
“The metrics for comparison are detailed in [62].”
Self-citation
- Authors
- Gupta, R. K., Fahmy, S., Chevron, M., Vasapollo, R., Figini, E., & Paolone, M.
- Venue
- arXiv
- Publisher
- arXiv
- Published
- 2024
- ISSN
- 2331-8422 (ISSN-L)
- arXiv
- 2404.12863
- OpenAlex
- W4395022542
- Cited by
- 1
- References
- 34
- Citations by year
- 2025: 1
- Type
- posted content
- Language
- en
- Open access
- green
- arxiv.org
- Licence
- Locations
- arXiv (Cornell University) (submittedVersion, cc-by-nc-nd)
- arXiv (Cornell University)
- Funders
- European Commission (HORIZON2020, 775970, 646039)
- Topics
- Physical Sciences › Engineering › Electrical and Electronic Engineering › Electric Vehicles and Infrastructure
- Physical Sciences › Engineering › Electrical and Electronic Engineering › Optimal Power Flow Distribution
- Physical Sciences › Engineering › Electrical and Electronic Engineering › Smart Grid Energy Management
- Keywords
- electric vehicle charging stations, active distribution networks, day-ahead scheduling, model predictive control, EV charging demand forecasting, Gaussian mixture model, grid connection point, photovoltaic power plants
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Claims read by deepseek-v4.1-flash under definition version 3 (extract-v3) on 2026-10-28.
Classified by jev-1.13-20260917 (gold-guideline-v0.2) on 2026-10-28.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review