Building information modelling (BIM): now and beyond
Open accessThe DOI matches its Crossref record; 7 of the 7 references it cites were found in a registry or an index.
Abstract
Building Information Modeling (BIM), also called n-D Modeling or Virtual Prototyping Technology, is a revolutionary development that is quickly reshaping the Architecture-Engineering-Construction (AEC) industry. BIM is both a technology and a process. The technology component of BIM helps project stakeholders to visualize what is to be built in a simulated environment to identify any potential design, construction or operational issues. The process component enables close collaboration and encourages integration of the roles of all stakeholders on a project. The paper presents an overview of BIM with focus on its core concepts, applications in the project life cycle and benefits for project stakeholders with the help of case studies. The paper also elaborates risks and barriers to BIM implementation and future trends.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Eastman, C., Teicholz, P. M., Sacks, R., & Liston, K. (2008) · Cited by 2,892
Building Information Modeling (BIM): Trends, Benefits, Risks, and Challenges for the AEC Industry
Azhar, S. (2011) · Leadership and Management in Engineering · doi:10.1061/(asce)lm.1943-5630.0000127 · Cited by 2,192
Self-citationBuilding information modeling for sustainable design and LEED® rating analysis
Azhar, S., Carlton, W. A., Olsen, D., & Ahmad, I. (2011) · Automation in Construction · doi:10.1016/j.autcon.2010.09.019 · Cited by 607
Self-citationKymmell, W. (2007) · Cited by 501
Leung, H. Y. (2008) · Cited by 406
BIM Experiences and Expectations: The Constructors' Perspective
Ku, K., & Taiebat, M. (2011) · International Journal of Construction Education and Research · doi:10.1080/15578771.2010.544155 · Cited by 205
Isikdag, U., Underwood, J., & Aouad, G. (2008) · Advanced Engineering Informatics · doi:10.1016/j.aei.2008.06.001 · Cited by 197
Cited by
Abioye, S. O., Oyedele, L. O., Akanbi, L., Ajayi, A., Davila Delgado, J. M., Bilal, M., Akinade, O. O., & Ahmed, A. (2021) · Journal of Building Engineering · doi:10.1016/j.jobe.2021.103299 · Cited by 1,015
“BIM is the current state-of-art in the construction industry, which is used to enhance reliability of cost and time estimates in the construction industry [75,108].”
BackgroundBIM implementation throughout the UK construction project lifecycle: An analysis
Eadie, R., Browne, M., Odeyinka, H., McKeown, C., & McNiff, S. (2013) · Automation in Construction · doi:10.1016/j.autcon.2013.09.001 · Cited by 749
Digital Twin as a Service (DTaaS) in Industry 4.0: An Architecture Reference Model
Aheleroff, S., Xu, X., Zhong, R. Y., & Lu, Y. (2021) · Advanced Engineering Informatics · doi:10.1016/j.aei.2020.101225 · Cited by 658
Digital Twin: Vision, Benefits, Boundaries, and Creation for Buildings
Khajavi, S. H., Motlagh, N. H., Jaribion, A., Werner, L. C., & Holmstrom, J. (2019) · IEEE Access · doi:10.1109/access.2019.2946515 · Cited by 597
Building Information Modeling (BIM) for green buildings: A critical review and future directions
Lu, Y., Wu, Z., Chang, R., & Li, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.024 · Cited by 555
Review of construction and demolition waste management in China and USA
Aslam, M. S., Huang, B., & Cui, L. (2020) · Journal of Environmental Management · doi:10.1016/j.jenvman.2020.110445 · Cited by 534
A scientometric review of global BIM research: Analysis and visualization
Zhao, X. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.04.002 · Cited by 434
Chan, D. W. M., Olawumi, T. O., & Ho, A. M. L. (2019) · Journal of Building Engineering · doi:10.1016/j.jobe.2019.100764 · Cited by 342
Shahzad, M., Shafiq, M. T., Douglas, D., & Kassem, M. (2022) · Buildings · doi:10.3390/buildings12020120 · Cited by 325
Digitisation in facilities management: A literature review and future research directions
Wong, J. K. W., Ge, J., & He, S. X. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.04.006 · Cited by 307
Urban Digital Twin Challenges: A Systematic Review and Perspectives for Sustainable Smart Cities
Weil, C., Bibri, S. E., Longchamp, R., Golay, F., & Alahi, A. (2023) · Sustainable Cities and Society · doi:10.1016/j.scs.2023.104862 · Cited by 299
Cloud-to-BIM-to-FEM: Structural simulation with accurate historic BIM from laser scans
Barazzetti, L., Banfi, F., Brumana, R., Gusmeroli, G., Previtali, M., & Schiantarelli, G. (2015) · Simulation Modelling Practice and Theory · doi:10.1016/j.simpat.2015.06.004 · Cited by 276
Integrated project delivery with blockchain: An automated financial system
Elghaish, F., Abrishami, S., & Hosseini, M. R. (2020) · Automation in Construction · doi:10.1016/j.autcon.2020.103182 · Cited by 268
Hosseini, M. R., Banihashemi, S., Chileshe, N., Namzadi, M. O., Udaeja, C., Rameezdeen, R., & McCuen, T. (2016) · Construction Economics and Building · doi:10.5130/ajceb.v16i3.5159 · Cited by 195
CoSMoS: A BIM and wireless sensor based integrated solution for worker safety in confined spaces
Riaz, Z., Arslan, M., Kiani, A. K., & Azhar, S. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.05.010 · Cited by 181
Self-citationArtificial intelligence based methods for retrofit projects: A review of applications and impacts
Bocaneala, N., Mayouf, M., Vakaj, E., & Shelbourn, M. (2025) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-024-10159-7 · Cited by 23
“…[18, 19] are a few of the identified subdomains [20], value-driven services like scheduling and estimation [20, 21], supply chain management [22–25] and the incorporation of 4D and 5D BIM to enable better planning at an early design stage [26], health and safety [27–30] and AI-driven…”
IT PROJECT RISK MANAGEMENT: AN ANALYTICAL REVIEW OF RESEARCH
Yasinetskyi, O., & Fesenko, T. (2025) · Bulletin of NTU "KhPI". Series: Strategic management, portfolio, program and project management · doi:10.20998/2413-3000.2025.10.6 · Cited by 3
Metadata
- Authors
- Azhar, S., Khalfan, M., & Maqsood, T.
- Venue
- Construction Economics and Building
- Published
- 2015-10-15
- Volume
- 12
- Issue
- 4
- Pages
- 15-28
- ISSN
- 2204-9029 (ISSN-L)
- OpenAlex
- W2128978665
- Cited by
- 671
- References
- 7
- FWCI
- 51.96
- Type
- journal article
- Language
- en
- Open access
- diamond
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.