Optimal two‐ and three‐stage production schedules with setup times included
The DOI matches its Crossref record.
Abstract
Each of a collection of items are to be produced on two machines (or stages). Each machine can handle only one item at a time and each item must be processed through machine one and then through machine two. The setup time plus work time for each item for each machine is known. A simple decision rule is obtained in this paper for the optimal scheduling of the production so that the total elapsed time is a minimum. A three‐machine problem is also discussed and solved for a restricted case.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
Graham, R. L., Lawler, E. L., Lenstra, J. K., & Kan, A. H. G. R. (1979) · Annals of Discrete Mathematics · doi:10.1016/s0167-5060(08)70356-x · Cited by 5,854
Complexity of Machine Scheduling Problems
Lenstra, J. K., Rinnooy Kan, A. H. G., & Brucker, P. (1977) · Annals of Discrete Mathematics · doi:10.1016/s0167-5060(08)70743-x · Cited by 2,197
Various optimizers for single‐stage production
Smith, W. E. (1956) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800030106 · Cited by 1,831
The theory of dynamic programming
Bellman, R. (1954) · Bulletin of the American Mathematical Society · doi:10.1090/s0002-9904-1954-09848-8 · Cited by 1,459
A multi-objective genetic local search algorithm and its application to flowshop scheduling
Ishibuchi, H., & Murata, T. (1998) · IEEE Transactions on Systems, Man and Cybernetics, Part C (Applications and Reviews) · doi:10.1109/5326.704576 · Cited by 1,019
Scheduling with batching: A review
Potts, C. N., & Kovalyov, M. Y. (2000) · European Journal of Operational Research · doi:10.1016/s0377-2217(99)00153-8 · Cited by 913
Discrete-Variable Extremum Problems
Dantzig, G. B. (1957) · Operations Research · doi:10.1287/opre.5.2.266 · Cited by 910
Parallel Sequencing and Assembly Line Problems
Hu, T. C. (1961) · Operations Research · doi:10.1287/opre.9.6.841 · Cited by 898
A Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
Hall, N. G., & Sriskandarajah, C. (1996) · Operations Research · doi:10.1287/opre.44.3.510 · Cited by 842
Deterministic job-shop scheduling: Past, present and future
Jain, A. S., & Meeran, S. (1999) · European Journal of Operational Research · doi:10.1016/s0377-2217(98)00113-1 · Cited by 782
Chapter 9 Sequencing and scheduling: Algorithms and complexity
Lawler, E. L., Lenstra, J. K., Rinnooy Kan, A. H. G., & Shmoys, D. B. (1993) · Handbooks in Operations Research and Management Science · doi:10.1016/s0927-0507(05)80189-6 · Cited by 761
A mayfly optimization algorithm
Zervoudakis, K., & Tsafarakis, S. (2020) · Computers & Industrial Engineering · doi:10.1016/j.cie.2020.106559 · Cited by 692
Simulated annealing for permutation flow-shop scheduling
Osman, I., & Potts, C. (1989) · Omega · doi:10.1016/0305-0483(89)90059-5 · Cited by 614
A comprehensive review and evaluation of permutation flowshop heuristics
Ruiz, R., & Maroto, C. (2005) · European Journal of Operational Research · doi:10.1016/j.ejor.2004.04.017 · Cited by 579
Review of job shop scheduling research and its new perspectives under Industry 4.0
Zhang, J., Ding, G., Zou, Y., Qin, S., & Fu, J. (2019) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-017-1350-2 · Cited by 558
Tasgetiren, M. F., Liang, Y.-C., Sevkli, M., & Gencyilmaz, G. (2007) · European Journal of Operational Research · doi:10.1016/j.ejor.2005.12.024 · Cited by 557
The job shop scheduling problem: Conventional and new solution techniques
Błażewicz, J., Domschke, W., & Pesch, E. (1996) · European Journal of Operational Research · doi:10.1016/0377-2217(95)00362-2 · Cited by 536
An Effective PSO-Based Memetic Algorithm for Flow Shop Scheduling
Liu, B., Wang, L., & Jin, Y.-H. (2007) · IEEE Transactions on Systems, Man and Cybernetics, Part B (Cybernetics) · doi:10.1109/tsmcb.2006.883272 · Cited by 480
Houssein, E. H., Gad, A. G., Wazery, Y. M., & Suganthan, P. N. (2021) · Swarm and Evolutionary Computation · doi:10.1016/j.swevo.2021.100841 · Cited by 355
Flowshop-scheduling problems with makespan criterion: a review
Reza Hejazi *, S., & Saghafian, S. (2005) · International Journal of Production Research · doi:10.1080/0020754050056417 · Cited by 342
Ogbu, F. A., & Smith, D. K. (1990) · Computers & Operations Research · doi:10.1016/0305-0548(90)90001-n · Cited by 310
The Schedule-Sequencing Problem
Bowman, E. H. (1959) · Operations Research · doi:10.1287/opre.7.5.621 · Cited by 292
Green scheduling of a two-machine flowshop: Trade-off between makespan and energy consumption
Mansouri, S. A., Aktas, E., & Besikci, U. (2016) · European Journal of Operational Research · doi:10.1016/j.ejor.2015.08.064 · Cited by 289
Edge Intelligence: Empowering Intelligence to the Edge of Network
Xu, D., Li, T., Li, Y., Su, X., Tarkoma, S., Jiang, T., Crowcroft, J., & Hui, P. (2021) · Proceedings of the IEEE · doi:10.1109/jproc.2021.3119950 · Cited by 272
Komaki, G. M., & Kayvanfar, V. (2015) · Journal of Computational Science · doi:10.1016/j.jocs.2015.03.011 · Cited by 267
Abdel-Basset, M., Manogaran, G., El-Shahat, D., & Mirjalili, S. (2018) · Future Generation Computer Systems · doi:10.1016/j.future.2018.03.020 · Cited by 262
RetractedMetaheuristic Scheduling for Cloud: A Survey
Tsai, C.-W., & Rodrigues, J. J. P. C. (2014) · IEEE Systems Journal · doi:10.1109/jsyst.2013.2256731 · Cited by 246
“It is generally believed that modern scheduling approaches can be dated back to Johnson’s study [6].”
BackgroundLAVEA: latency-aware video analytics on edge computing platform
Yi, S., Hao, Z., Zhang, Q., Zhang, Q., Shi, W., & Li, Q. (2017) · Proceedings of the Second ACM/IEEE Symposium on Edge Computing · doi:10.1145/3132211.3134459 · Cited by 244
“We study our scheduling problem using the ow job shop model and apply the Johnson’s rule [19].”
MethodRapid Modeling and Discovery of Priority Dispatching Rules: An Autonomous Learning Approach
Geiger, C. D., Uzsoy, R., & Aytuğ, H. (2006) · Journal of Scheduling · doi:10.1007/s10951-006-5591-8 · Cited by 217
“Previous research on GP indicates its applicability to many different real-world applications, where the problem domain can be interpreted as a program discovery problem (Koza, 1992). Genetic programming uses the optimization techniques of genetic algorithms to evolve computer programs, mimicking human programmers con…”
Neural Networks in Civil Engineering. II: Systems and Application
Flood, I., & Kartam, N. (1994) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(1994)8:2(149 · Cited by 186
Gong, G., Deng, Q., Gong, X., Liu, W., & Ren, Q. (2018) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2017.10.188 · Cited by 171
Ant colony optimization for multi-objective flow shop scheduling problem
Yagmahan, B., & Yenisey, M. M. (2008) · Computers & Industrial Engineering · doi:10.1016/j.cie.2007.08.003 · Cited by 160
“Some of them are ACS by Gambardella and Dorigo (1996), Ant-Q by Gambardella and Dorigo (1995), MMAS by Stützle and Hoos (1996, 1997) and rank based ant system by Bullnheimer, Hartl, and Strauss (1999).”
BackgroundMethodXiao, Y., Zhang, S., Yang, P., You, M., & Huang, J. (2019) · Reliability Engineering & System Safety · doi:10.1016/j.ress.2019.03.016 · Cited by 46
Kim, T. Y. (2020) · Computers & Industrial Engineering · doi:10.1016/j.cie.2018.12.011 · Cited by 32
Metadata
- Authors
- Johnson, S. M.
- Venue
- Naval Research Logistics Quarterly
- Publisher
- Wiley
- Published
- 1954-03
- Volume
- 1
- Issue
- 1
- Pages
- 61-68
- ISSN
- 0028-1441 (ISSN-L)
- 1931-9193
- OpenAlex
- W2024085737
- Cited by
- 3,252
- References
- 0
- FWCI
- 91.75
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.