The DOI matches its Crossref record.
Construction and Demolition (C&D) Waste Management and Disposal
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
Manual labeling of C&D waste materials is labor-intensive, costly, and prone to inconsistencies, exacerbated by frequent variations in debris composition and state.
“Manual labeling of these materials is labor-intensive, costly, and prone to inconsistencies, exacerbated by frequent variations in debris composition and state (Hassan et al., 2022).”
From Self-Supervised Learning Framework for Automated Material Grouping of Demolition Waste: Advancing Sustainable Waste Management (2025) · cites this paper as Hassan et al., 2022
Citations
Cites
No references could be resolved yet.
Research works printed but not linked: 131
- Hassan SH, Aziz AH, Adlan MN, Johari I (2015) The causes of waste generated in Malaysian housing construction-sites using site observations and interviews. IJEWM 15(4):295–308 · DOI
- Elizar W, Koestalam P (2015) Civil engineering innovation for a sustainable identification and analyze of influence level on waste construction management of performance. Procedia Eng 125:46–52 · DOI
- Liu Z, Osmani M, Demian P, Baldwin A (2015) A BIM-aided construction waste minimization framework. Autom Const 59:1–23 · DOI
- Muhwezi L, Chamuriho LM, Lema NM (2012) An investigation into materials wastes on building construction projects in Kampala-Uganda. Sch J Eng 1:11–18
- Eusuf AM, Ibrahim M, Islam R (2012) The construction and demolition waste in Klang Valley, Malaysia. J Malays Inst Planner 10:99–124
- Bolviken T, Rooke J, Koskela L (2014) The wastes of production in construction – a TFV based taxonomy. In: Proceeding of 22nd annual conference of the international group for lean construction, Oslo, Norway, pp 23–27
- Formoso C, Bolviken T, Rooke J, Koskela L (2015). A conceptual framework for the prescriptive causal analysis of construction waste. In: Proceeding of 22nd annual conference of the international group for lean construction, Perth, Australia, pp 454–462
- Bossink BBAG, Brouwers HJH (1996) Construction waste: quantification and source evaluation. J Constr Eng Manag Neth 122(1):55–60 · DOI
- Badgie D, Armi M, Samah A, Manaf LA, Muda AB (2012) Assessment of municipal solid waste composition in Malaysia: management, practice, and challenges. Polish J Environ Stud Malaysia 21(3):539–547
- Kamaruddin MA, Yusoff MS, Aziz HA, Adlan MN, Zaman NQ, Mahmood NZ (2016) Assessment of municipal solid waste generation, composition and recyclable potential at selected Kelantan dumping sites, Malaysia. J Sci Res Dev 3(5):204–211
- Mukhtar EM, Williams ID, Shaw PJ, Ongondo FO (2016) A tale of two cities: the emergence of urban waste systems in a developed and a developing city. Recycling 1:254–270 · DOI
- Al-Rifai J, Amoudi O (2016) Understanding the key factors of construction waste in Jordan. Jordan J Civil Eng 10(2):244–253 · DOI
- Umar UA, Shafiq N, Malakahmad A, Khamidi DMF (2016) Impact of construction waste minimization at construction-site: case study. Technol J, 10.11113/jt.v78.8508 · DOI
- Abadir MF, Sallam EH, Bakr IM (2002) Preparation of porcelain tiles from Egyptian raw materials. Ceram Int Egypt 28(3):303–310 · DOI
- Ponnada M, Kameswari P (2015) Construction and demolition waste management—a review. Int J Adv Sci Technol India 84:19–46 · DOI
- Nagapan S, Rahman IA, Asmi A, Hameed A, Zin RM (2012) Identifying causes of construction waste – case of central region of peninsula Malaysia. Int J Integr Eng 4(2):22–28
- Lau HH, Whyte A, Law PL (2008) Composition and characteristics of construction waste generated by residential housing project. Int J Environ Res Malaysia 2(3):261–268
- Noor RNHRM, Ridzuan ARM, Endut IR, Noordin B, Shehu Z, Ghani AHA (2013) The quantification of local construction waste for the current construction waste management practices: a Case study. In: Klang Valley, IEEE business engineering and industrial applications colloquium (BEIAC), Malaysia, pp 183–188 · DOI
- Osmani M (2011) Construction Waste. In Letcher TM and Vallero DA, editors. Waste: A handbook for management, Oxford, Elsevier, 2011, p. 207–218 · DOI
- Formoso C, Soibelman L, Cesare C, Issato E (2002) Material Waste in Building Industry: Main Causes and Prevention, J Constr Eng Management 128(4):316–325 · DOI
- Skoyles ER (1976) Material wastage: a misuse of resources. Build Res Pract 4:232–243
- Poon CS, Yu ATW, Wong SW, Cheung E (2004) Management of construction waste in public housing projects in Hong Kong. Constr Manag Econ J China 22(7):675–689 · DOI
- Begum RA, Siwar C, Pereira JJ, Jaafar AH (2009) Attitude and behavioral factors in waste management in the construction industry of Malaysia. Resour Conserv Recycl Malays 53:321–328 · DOI
- Al-Hajj A, Hamani K (2011) Material waste in the UAE construction industry: main causes and minimization practices. Archit Eng Design Manag J 7(4):221–235
- Izwan MH, Abd Rahim NK (2016) Conceptual model for systematic construction waste management, MATEC Wec of Conferences 87, ENCON · DOI
- Hassan SH, Aziz AH, Hamid MSA, Musir AA (2020) IOP Conf Ser: Earth Environ Sci 616 012017 · DOI
- Agamuthu P (2008) Challenges in sustainable management of construction and demolition waste. Waste Manag Res J Int Solid Wastes Public Clean Assoc 26(6):491 · DOI
- Poon CS, Ann TW, Yu LH (2007) On-site sorting of construction and demolition waste in Hong Kong. J Resour Conserv Recycl 32:157–172 · DOI · Paper page
- Saadi NZ, Ismail Z, Alias Z (2016) A review of construction waste management and initiatives in Malaysia. J Sustain Sci Mang 11(2):101–114
- Dai J, Goodrum PM, Maloney WF (2009) Construction craft workers’ perceptions of the factors affecting their productivity. J Constr Eng Manag 135(3):217–226 · DOI
- Karim NA, Hassan S, Yunus J, Hashim M (2013) Factors influence labour productivity and the impacts on construction industry. Caspian J Appl Sci Res 2:349–354
- Hassan SH, Ahzahar N, Fauzi MA, Eman J (2012) Waste Management Issues in the Northern Region of Malaysia. Procedia – Social and Behavioral Sciences 42:175–181 · DOI
- Mahamid I (2013) Contractors perspective toward factors affecting labor productivity in building construction. Eng Constr Archit Manag J 20(5):446–460 · DOI
- Turek K, Perek-Białas J (2013) The role of employers opinions about skills and productivity of older workers: example of Poland. Empl Relat 35(6):648–664 · DOI
- De Silva N, Darmicka R, Fernando E (2014) Impact of foreign workforce on productivity in foreign-funded infrastructure projects. J Financ Manag Prop Constr 19(2):168–183 · DOI
- Wimalasena BAD (2011) A planning tool for construction waste management. PhD thesis. University of Calgary
- India, Government of India, Cntral Public Health and Environmental Engineering Organisation (CPHEEO) (2016) Municipal solid waste management manual part III: the Compendium Ministry of Urban Development. CPHEEO, New Delhi
- Blengini G, Garbarino E (2010) Resources and waste management in Turin (Italy): the role of recycled aggregates in the sustainable supply mix. J Clean Prod 18(10−11):1021–1030 · DOI
- Kumbhar S, Gupta A, Desai D (2013) Recycling and reuse of construction and demolition waste for sustainable development. OIDA Int J Sustain Dev 6(7):83–92
- Guo X, Liu H, Wu S (2019) Humic substances developed during organic waste composting: formation mechanisms, structural properties, and agronomic functions. Sci Total Environ 662:501–510 · DOI
- Vyncke J, Vrijders J (2010) Recycling of C&D waste in Belgium: state-of-the-art and opportunities for technology transfer. Second international conference on sustainable construction materials and technologies. Universita Politecnicadelle Marche, Ancona, Italy, p 11
- Burgoyne D (2003) Construction & demolition (C&D) waste diversion in California. Services SOCDOG, West Sacramento
- Earle J, Ergun D, Gorgolewski M (2014) Barriers for deconstruction and reuse/recycling of construction materials in Canada. In: Barriers for deconstruction and reuse/recycling of construction materials. CIB Publication, Ottawa, p 20
- Ulubeyli S, Kazaz A, Arslan V (2017) Construction and demolition waste recycling plants revisited: management issues. Procedia Eng 172:1190–1197 · DOI · Paper page
- Garcia-Gonzalez J, Rodriguez-Robles D, Juan-Valdes A, Moran-del Pozo JM, Guerra-Romero MI (2014) Pre-saturation technique of the recycled aggregates: solution to the water absorption drawback in the recycled concrete manufacture. Materials 7(9):6224–6236 · DOI
- Kumar R (2017) Influence of recycled coarse aggregate derived from construction and demolition waste (CDW) on abrasion resistance of pavement concrete. Constr Build Mater 142:248–255 · DOI
- Vegas I, Broos K, Nielsen P, Lambertz O, Lisbona A (2015) Upgrading the quality of mixed recycled aggregates from construction and demolition waste by using near-infrared sorting technology. Constr Build Mater 75:121–128 · DOI
- Stefanidou M, Anastasiou E, Filikas KG (2014) Recycled sand in lime-based mortars. Waste Manag 34(12):2595–2602 · DOI
- Ulsen C, Kahn H, Hawlitschek G, Masini EA, Angulo SC, John VM (2013) Production of recycled sand from construction and demolition waste. Constr Build Mater 40:168–1173 · DOI
- Tam VWY, Kotrayothar D, Xiao JZ (2015) Long-term deformation behaviour of recycled aggregate concrete. Constr Build Mater 100:262–272 · DOI
- Arulrajah A, Ali MMY, Disfani MM, Horpibulsuk S (2014) Recycled-glass blends in pavement base/subbase applications: laboratory and field evaluation. J Mater Civ Eng 26(7):12 · DOI
- Kralj D (2009) Experimental study of recycling lightweight concrete with aggregates containing expanded glass. Process Saf Environ Prot 87(4):267–273 · DOI
- Penacho P, de Brito J, Veiga MR (2014) Physico-mechanical and performance characterization of mortars incorporating fine glass waste aggregate. Cement Concr Compos 50:47–59 · DOI
- Gualtieri AF (2013) Recycling asbestos-containing material (ACM) from construction and demolition waste (CDW). In: Handbook of recycled concrete and demolition waste. Woodhead, Oxford, pp 500–525 · DOI
- Won J, Cheng JC (2017) Identifying potential opportunities of building information modeling for construction and demolition waste management and minimization. Autom Constr 79:3–18 · DOI
- Jalali S (2007) Quantification of construction waste amount. Sixth international technical conference of waste, Viseu, Portugal
- Mah CM, Fujiwara T, Ho CS (2018) Environmental impacts of construction and demolition waste management alternatives. Chem Eng Trans 63:343–348
- Mcdonald B, Smithers M (1998) Implementing a waste management plan during the construction phase of a project: a case study. Constr Manag Econ 16:71–78 · DOI
- Yuan HP, Shen LY, Hao JL, Lu WS (2011) A model for cost–benefit analysis of construction and demolition waste management throughout the Waste Chain. Resour Conserv Recycl 55:604–612 · DOI
- Yehesis M, Hewage K, Alam M, Eskicioglu S, Eskicioglu C, Sadiq R (2013) An overview of construction and demolition waste management in Canada: a lifecycle analysis approach to sustainability. Clean Technol Environ Policy 15:81–91 · DOI · Paper page
- NEA (National Environment Agency) (2016) Waste statistics and overall recycling. National Environment Agency, Singapore
- Lee CIS, Noor ZZ, Yusuf RO, Mohd Ali MR, Taib SM, Ho CS (2017) Development of sis on solid waste management through selection: a review. Chem Eng Trans 56:535–540
- Wang JY, Touran A, Christoforou C, Fadlalla H (2004) A systems analysis tool for construction and demolition wastes management. Waste Manag 24:989–997 · DOI
- Udawatta N, Zuo J, Chiveralls K, Zillante G (2015) Attitudinal and behavioural approaches to improving waste management on construction projects in Australia: benefits and limitations. Int J Constr Manag 15(2):137–147
- Guerrero LA, Maas G, Hogland W (2013) Solid waste management challenges for cities in developing countries. Waste Manag 33(1):220–232 · DOI · Paper page
- Umar U, Shafiq N, Malakahmad A, Nuruddin M, Salihi I (2016) Ranking of principal causes of construction waste for Malaysian residential project. Civil, offshore and environmental engineering, pp 163–167 · DOI
- Kartam N, Al-Mutairi N, Al-Ghusain I, Al-Humoud J (2004) Environmental management of construction and demolition waste in Kuwait. Waste Manag J 24(10):1049–1059 · DOI
- Hussein A, Samin R, Idris M (2016) An analysis of, willingness and effective factors on waste minimization in construction industry: Iraq. J Adv Nat Appl Sci 12:77–83
- Zainu ZA, Syukri WM, Songip AR (2015) Present and future innovations in solid waste management in Malaysia. International conference on waste management, ecology and biological sciences (WMEBS'15), Kuala Lumpur, pp 13–14
- Sin JT, Chen GK, Em AS (2017) Acceptance of the application of sustainable concept in Malaysia’s waste management infrastructure-landfill. MATEC web of conferences, 05012 · DOI
- Ewjik VE, Stegemann AJ (2016) Limitations of the waste hierarchy for achieving absolute reductions in material throughput. J Clean Prod 132:122–128 · DOI · Paper page
- Ismail JN, Ismail Z (2014) Sustainable construction waste management strategic implementation model. Wseas Trans Environ Dev 10:48–59
- Sa’adi N, Ismail Z (2015) Government initiatives pertaining to construction waste minimization in Malaysia. Int J Energy Environ 9:231–242
- Mallak KS, Ishak BM, Mohamed FA (2014) Waste minimization benefits and obstacle for solid industrial wastes in Malaysia. IOSR J Environ Sci Toxicol Food Technol 8(2):43–52 · DOI
- Ajayi S (2016) Design, procurement and construction strategies for minimizing waste in construction projects. University of The West of England, Bristol, pp 1–306
- Kermanshahi E, Isaabadi MHZ, Harirchian E (2015) Material waste reduction between IBS and conventional construction. IOSR J Mech Civil Eng 12(3):94–97
- Azman MNA, Kamar KM, Nawi MNM (2015) Industrialized building system in reducing waste of construction industry. JSTE 2:96–103
- Lu W, Webster C, Chen K, Zhang X, Chen X (2017) Computational building information modelling for construction waste management. Moving from rhetoric to reality. Renew Sustain Energy J 68:587–595 · DOI
- Eastman C, Teicholz P, Sacks R, Liston K (2011) BIM handbook: A guide to building information modeling for owners, designers, engineers, contractors, and facility managers. Wiley, Hoboken
- Bylund C, Magnusson A (2011) Model based cost estimations: an international comparison. Lund University Faculty of Engineering, LTH, Lund
- Guerra BC, Bakchan A, Leite F, Faust KM (2019) BIM-based automated construction waste estimation algorithms: the case of concrete and drywall waste streams. Waste Manag 87:825–832 · DOI
- Cheng JCP, Ma LYH (2013) A BIM-based system for demolition and renovation waste estimation and planning. Waste Manag 33(6):1539–1551 · DOI
- Cho YS, Lee S, Bae JS (2014) Reinforcement placement in a concrete slab object using structural building information modeling. Comput Aided Civil Infrastruct Eng 29(1):47–59 · DOI
- Xue F, Lu W, Chen K (2018) Automatic generation of semantically rich as-built building information models using 2D images: a derivative-free optimization approach. Comput Aided Civil Infrastruct Eng 33(11):926–942 · DOI
- Ruiz L, Ram X, Domingo S (2019) The circular economy in the construction and demolition waste sector – a review and an integrative model approach. J Clean Prod 248:119238 · DOI
- Mahpour A (2018) Prioritizing barriers to adopt circular economy in construction and demolition waste management. Resour Conserv Recycl 134:216–227 · DOI
- Akinade OO, Oyedele LO, Munir K, Bilal M, Ajayi S, Owolabi HA, Alaka HA, Bello SA (2016) Evaluation criteria for construction waste management tools: towards a holistic BIM framework. Int J Sustain Build Technol Urban Dev 7(1):3–21 · DOI
- Banihashemi S, Tabadkani A, Hosseini MR (2018) Integration of parametric design into modular coordination: a construction waste reduction workflow. Autom Constr 88:1–12 · DOI
- Won J, Cheng JCP, Lee G (2016) Quantification of construction waste prevented by BIM-based design validation: case studies in South Korea. Waste Manag 49:170–180 · DOI
- Shirowzhana S, Sepasgozara SM, Edwardsb DJ, Li H, Wang C (2020) BIM compatibility and its differentiation with interoperability challenges as an innovation factor. Autom Constr 112:0926
- Xu J, Shi Y, Xie Y, Zhao S (2019) A BIM-based construction and demolition waste information management system for greenhouse gas quantification and reduction. J Clean Prod 229:308–324 · DOI
- Li CZ, Zhong RY, Xue XF, Chen G, Huang K, Shen GG (2017) Integrating RFID and BIM technologies for mitigating risks and improving schedule performance of prefabricated house construction. J Clean Prod 165:1048–1062 · DOI
- Pratt MJ (2004) Extension of ISO 10303, the STEP standard, for the exchange of procedural shape models. In: Proceedings shape modeling applications. IEEE, Genova
- Wang J, Wu H, Duan H, Zillante G, Zuo J, Yuan H (2018) Combining life cycle assessment and building information modelling to account for carbon emission of building demolition waste: a case study. J Clean Prod 172:3154–3166 · DOI
- Shi Y, Xu J (2021) BIM-based information system for econo-enviro-friendly end-of-life disposal of construction and demolition waste. Autom Constr 125:103–611 · DOI
- Zou P, Hardy R, Yang R (2016) Barrier to building and construction waste reduction, reuse and recycling: a case study of the Australian capital region. In: Building today-saving tomorrow: sustainability in construction and deconstruction conference proceedings. Unitec Institute of Technology, Auckland, pp 27–35
- Act 673 (2007) Solid Waste and Public Cleansing Management Act (2007). Ministry of Housing and Local Government, Putrajaya
- Jain P, Powell J, Tolaymat T (2015) Methodology to estimate the quantity, composition, and management of construction and demolition debris in the United States. U.S. Environmental Protection Agency, Washington, DC
- Ajayi SO, Oyedele LO, Akinade OO, Bilal M, Owolabi HA, Alaka HA, Kadiri KO (2016) Reducing waste to landfill: a need for cultural change in the UK construction industry. J Build Eng 5:185–193 · DOI
- Zheng L, Wu H, Zhang H, Duan H, Wang J, Jiang W, Dong B, Liu G, Zuo J, Song Q (2017) Characterizing the generation and flow of construction and demolition waste in China. Constr Build Mater 136:405–413 · DOI · Paper page
- Poon CS, Yu ATW, Ng LH (2001) On-site sorting of construction and demolition waste in Hong Kong. Resour Conserv Recycl 32:157–172 · DOI · Paper page
- Bernardo M, Gomes MC, Brito JD (2016) Demolition waste generation for development of a regional management chain model. Waste Manag J 49:156–169 · DOI
- Roussat N, Mehu J, Abdelghafour M, Brula P (2008) Leaching behaviour of hazardous demolition waste. Waste Manag J 28(11):2032–2040 · DOI
- Arslan H, Coşgun N, Salgin B (2012) Construction and demolition waste management in Turkey. In: Marmolejo LF (ed) Waste management – an integrated vision. IntechOpen, Rijeka, pp 313–332
- Pappu A, Saxena M, Asolekar SR (2007) Solid wastes generation in India and their recycling potential in building materials. Build Environ 42:2311–2320 · DOI
- Talyan V, Dahiya RP, Sreekrishnan TR (2008) State of municipal solid waste management in Delhi, the capital of India. Waste Manag 28:1276–1287 · DOI
- Mydin MO, Khor JC, Sani NM (2014) Approaches to construction waste management in Malaysia. MATEC Web Conf 17:01014 · DOI
- Soutsos M, Fulton MC (2016) Recycling of demolition waste in Merseyside. Proc Inst Civ Eng Constr Mater 169(2):54–66 · DOI
- Lu WS, Yuan HP (2010) Exploring critical success factors for waste management in construction projects of China. Resour Conserv Recycl 55(2):201–208 · DOI
- Esa MR, Halog A, Rigamonti L (2017) Strategies for minimizing construction and demolition wastes in Malaysia. Resour Conserv Recycl 120:219–229 · DOI
- Davenport TH (1992) Process innovation: reengineering work through information technology. Harvard Business School Press, Boston. isbn 0 87584 366 2
- Succar B, Sher W, Williams A (2012) Measuring BIM performance: five metrics. Archit Eng Des Manag 8(2):120–142
- Naughton J (1994) What is ‘technology’? In: Banks F (ed) Teaching technology. The Open University, London
- DETR (Department of the Environment, Transport and the Regions) (2000) Building a better quality of life – a strategy for more sustainable construction. DETR, London
- Bell N (1998) Waste minimization and resource recovery. In: The environmental design guide, Gen 21, vol 2. Royal Australian Institute of Architects, Canberra
- Esin T, Cosgun N (2007) A study conducted to reduce construction waste generation in Turkey. Build Envrion 42:1667–1674 · DOI
- Begum RA, Siwar C, Pereira JJ, Jaafar AH (2006) Factors and values of willingness to pay for improved construction waste management – a perspective of Malaysian contractors. J Waste Manag 27:1902–1906 · DOI
- Ghisellini P, Ripa M, Ulgiati S (2018) Exploring environmental and economic costs and benefits of a circular economy approach to the construction and demolition sector. A literature review. J Clean Prod 178:618–643 · DOI · Paper page
- Tam VW, Tam CM (2006) A review on the viable technology for construction waste recycling. Resour Conserv Recycl 47(3):209–221 · DOI
- Marinkovic S, Radonjanin V, Malesev M, Ignjatovic I (2010) Comparative environmental assessment of natural and recycled aggregate concrete. Waste Manag 30(11):2255–2264 · DOI
- Ye G, Yuan H, Shen L, Wang H (2012) Simulating effects of management measures on the improvement of the environmental performance of construction waste management. Resour Conserv Recycl 62:56–63 · DOI
- Shen L, Tam VW, Tam C, Drew D (2004) Mapping approach for examining waste management on construction-sites. J Constr Eng Manag 130(4):472–481 · DOI
- Iacoboaea C, Luca O, Aldea M, Sercaianu M (2010) Main issues related to the construction and demolition waste management in Romania. WIT Trans Ecol Environ 129:533–544 · DOI
- Iacoboaea C, Luca O Petrescu F (2009) Construction and demolition waste management in Romania. Proceedings of the 24th international conference on solid waste technology and management, The Journal of Solid Waste Technology and Management, Widener University, Philadelphia, USA, pp 1260–1270
- Gunalaan V (2015) Study on the demolition waste management in Malaysia construction industry. Int J Sci Eng Technol 4(3):131–135
- Asif H, Majid MA (2013) Utilization of demolished concrete waste for new construction. Int J Civil Environ Eng 7(1):37–42
- Ma M, Tam VWY, Le KN, Li W (2020) Challenges in current construction and demolition waste recycling: a China study. Waste Manag 118:610 · DOI
- Nagapan S, Ismail AR, Ade A (2011) A review of construction waste cause factors. Proceedings of the Asian conference of real estate: sustainable growth managing challenges (ACRE), Johor, Malaysia
- Department of Environment and Climate Change (DECC) (2008) Cracking down on illegal dumping: handbook for local government. DECC, Sydney, pp 7–15
- Yunpeng H (2011) Minimization management of construction waste. IEEE international symposium of water resource and environmental protection (ISWREP), China, pp 2769–2772 · DOI
- MHLG (2006) The national solid waste management policy. Ministry of Housing and Local Government, Putrajaya
Cited by
Sorted by citations
Alshami, A., & Choi, J. (2025) · CIB Conferences · doi:10.7771/3067-4883.2103
Metadata
- Authors
- Hassan, S. H., Aziz, H. A., Johari, I., & Hung, Y.-T.
- Affiliations
- Universiti Teknologi MARA (MY)
- Universiti Sains Malaysia (MY)
- Cleveland State University (US)
- Corresponding author
- Hassan, Siti Hafizan
- Venue
- Handbook of Environmental Engineering
- Publisher
- Springer International Publishing
- Published
- 2022
- Pages
- 165-216
- ISSN
- 2512-1359 (ISSN-L)
- 2512-1472
- OpenAlex
- W4226019988
- Cited by
- 16
- References
- 0
- Citations by year
- 2026: 4 · 2025: 5 · 2024: 4 · 2023: 2 · 2022: 1
- FWCI
- 11.60
- Type
- book chapter
- Language
- en
- Open access
- closed
- Locations
- Handbook of environmental engineering (publishedVersion)
- EngagedScholarship @ Cleveland State University (Cleveland State University) (submittedVersion)
- Topics
- Physical Sciences › Engineering › Building and Construction › Recycled Aggregate Concrete Performance
- Physical Sciences › Environmental Science › Waste Management and Disposal › Municipal Solid Waste Management
- Physical Sciences › Engineering › Building and Construction › Construction Management and Sustainability
- Keywords
- construction and demolition waste, waste management, waste disposal, waste minimization, waste hierarchy, waste generation causes, waste characteristics, waste management regulation, employee efficiency, Malaysia
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review