Cited by 140Recycled Aggregate Concrete PerformanceMunicipal Solid Waste ManagementSustainable Supply Chain Management

Construction and Demolition Waste Recycling Plants Revisited: Management Issues

Open access
Ulubeyli, Serdar, Kazaz, Aynur, Arslan, Volkan·2017·Procedia Engineering

Abstract

Today, recycling of construction and demolition waste (C&DW) by plants is a reasonable alternative to the existing unsustainable disposal methods such as landfilling and fly tipping. Therefore, this study aims to report current management issues of these plants in the literature. As a result, it was seen that these management issues investigated in past researches can be classified under four main groups such as economics, environment, location, and administration. Their pros and cons were also revealed in a covering manner. As these issues have not been addressed together up to date and each one of them has been investigated separately, the present study is the first attempt to give a full picture of management issues of the recycling plants. Thus, it can fill the gap in the literature. As a research implication, this study may help researchers who will investigate C&DW recycling plants from different perspectives. In terms of the practical implication, it may attract attention of industrial practitioners and entrepreneurs in public authorities and the private sector to benefit from such wastes through plants. Finally, as a social implication, better management of C&DW recycling plants can save and enhance the sustainability of the overall environment and affect society positively.

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1016/j.proeng.2017.02.139

Cites

2 of 2 references verified0 citation errors · 0 not checkable

Statistics

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

  • Reduction, reuse, and recycling of wood waste reduce virgin material consumption and GHG emissions and bring economic and social benefits.

    “Reduction, reuse, and recycling of wood waste reduce virgin material consumption and GHG emissions and bring economic and social benefits [97].”

    From Circular Economy of Construction and Demolition Wood Waste—A Theoretical Framework Approach (2022) · cites this paper as [97]

    Section 2 (page unavailable) says recycling construction and demolition waste can minimize resource consumption, improve environmental conditions, be cost-effective, and create jobs. Section 3.2 (page unavailable) reports avoided CO2-equivalent emissions from recycling. The paper includes wood among construction and demolition wastes, but does not establish these combined benefits specifically for reducing, reusing, and recycling wood waste. (LLM, conf=0.86)

    Experimental — accuracy not yet measured
  • The average recycling rate in the EU, UK, France, Spain, Germany, Australia, US, and China are 46%, 89.9%, 47.5%, 37.9%, 34%, 38-40%, 70%, and 5%, respectively.

    “The average recycling rate in the EU, UK, France, Spain, Germany, Australia, US, and China are 46%, 89.9%, 47.5%, 37.9%, 34%, 38-40%, 70%, and 5%, respectively [78,80,97,98].”

    From Circular Economy of Construction and Demolition Wood Waste—A Theoretical Framework Approach (2022) · cites this paper as [97]

    Section 2 (page unavailable) gives a 70% EU recovery target, an 86.3% reuse/recycling/recovery figure for Germany, and separate US figures for recovery and recycling of specific waste streams. The Introduction gives countries’ shares of total waste generation, not their recycling rates. Searches for the claimed country-by-country rates and distinctive percentages did not find the asserted figures in our copy. (LLM, conf=0.73)

    Experimental — accuracy not yet measured

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Cites

Flagged first, then by citations

Research works printed but not linked: 1

  1. W. Lu, V.W.Y. Tam, Construction waste management policies and their effectiveness in Hong Kong: a longitudinal review, Renew. Sust. En. Rev. 23 (2013) 214-223.

Cited by

Sorted by citations

Authors
Ulubeyli, S., Kazaz, A., & Arslan, V.
Affiliations
  • Zonguldak Bülent Ecevit University (TR)
  • Akdeniz University (TR)
Corresponding author
Ulubeyli, Serdar
Venue
Procedia Engineering
Publisher
Elsevier BV
Published
2017
Volume
172
Pages
1190-1197
ISSN
1877-7058 (ISSN-L)
OpenAlex
W2590624658
Cited by
140
References
2
Citations by year
2026: 7 · 2025: 20 · 2024: 17 · 2023: 15 · 2022: 14 · 2021: 19 · 2020: 21 · 2019: 13 · 2018: 10 · 2017: 3 · 2014: 1
FWCI
19.85
Type
conference paper
Language
en
Open access
Locations
  • Procedia Engineering (publishedVersion, cc-by-nc-nd)
  • Zonguldak Bülent Ecevit University Institutional Repository (submittedVersion, cc-by-nc-nd)
Funders
Akdeniz Üniversitesi
Topics
  • Physical Sciences › Engineering › Building and Construction › Recycled Aggregate Concrete Performance
  • Physical Sciences › Environmental Science › Waste Management and Disposal › Municipal Solid Waste Management
  • Social Sciences › Business, Management and Accounting › Strategy and Management › Sustainable Supply Chain Management
Keywords
construction and demolition waste, recycling facilities, illegal dumping, environmental impact, facility location, administrative problems, sustainability

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review