CoChat

Urban imaginaries: funding mega infrastructure projects in Lagos, Nigeria

Open access
Adama, Onyanta · 2018 · GeoJournal

The DOI matches its Crossref record; 65 of the 71 references it cites were found in a registry or an index; 7 of the 50 sources its claims cite were checked for support.

Abstract

Using the Lagos Megacity Project, the paper examined the challenges facing the funding of mega infrastructure projects.

Overview

CoChat Summary

TL;DR

The paper uses the Lagos Megacity Project (LMCP) to examine how mega infrastructure projects are funded, showing that an alliance of federal, Lagos, and Ogun state governments unraveled amid disputes over fiscal and political responsibilities. It argues that opposition politics, a politicized Federation Account, and a preference for elite projects such as Eko Atlantic City reinforced socio-spatial exclusion.

Key findings

  • The LMCP funding alliance was to be shared by Lagos State (40%), Ogun State (30%), and the federal government (30%), but disputes over chairmanship, board membership, and financing led to federal withdrawal, losing the expected 30% federal contribution.
  • Lagos State’s relatively high Internally Generated Revenue—61.06% in 2008 and 63.60% in 2012—reduced its dependence on federal allocations and gave it more political leverage, helping sustain opposition politics.
  • Infrastructure financing needs in Lagos were estimated at USD50 billion over ten years; historically government bore 80% of infrastructure financing, multilateral/bilateral agencies 12%, and private institutions only 8%.
  • Eko Atlantic City was to be financed entirely through private investment, with South Energyx given a 78-year concession; by November 2013 about five million square metres had been reclaimed, and plot prices ranged from USD1250/m² for landlocked plots to USD2500/m² for waterfront plots, in a city where 70.24% were described as poor.

Methods

  • Qualitative case study of the LMCP, with particular attention to capital mobilization, alliances/networks, resource allocation, and what gets prioritized.
  • Data include interviews with state and local government officials, a site visit to Eko Atlantic City in November 2013, and secondary/documentary sources such as government reports, news articles, and academic literature.
  • Analysis adopts a governmentality approach, emphasizing scale, historical and national political processes, and the tensions between federal, state, and local tiers of government.

Limitations

  • The paper does not state a formal limitations section.
  • Evident from the text: the account relies heavily on interviews with state and local government officials and on secondary sources, with no systematic sampling or quantitative analysis described.
  • Evident from the text: the findings are closely tied to the LMCP and Lagos’s specific political context, and the paper does not discuss generalizability to other cities or projects.

Model-written summary. Check it against the paper before relying on it.

Integrity signals

Registry

Crossref · 10.1007/s10708-016-9761-8

Cites

65 of 65 references verified0 citation errors · 0 not checkable

Statistics

Nothing to recompute.

Verification

Claims the paper makes

7 Valid · 7 Not valid · 37 Not checked · 87 Own results and interpretations

44 more claims

Create a free account to see all 138 claims and to verify the 5 references still open.

See all claims — free account
  • Probably not a substantial claim. 66
  • It may state two separate claims as one. 44

Create a free account to see these claims.

Citations

Cites

Show all 65 references

Research works printed but not linked: 8

  1. Chikulo, B. C. (1998). Decentralization and the role of the state in the future. In I. Mandaza (Ed.), Governance and human development in Southern Africa. Harare: SAPES Books.
  2. Elaigwu, J. I. (2007). Federalism, governance and security. Paper presented at the conference Evangelische Akademie Loccum, 15–17 June 2007 in Berlin.
  3. Foucault, M. (1980). Two lectures. In C. Gordon (Ed.) Power/knowledge: Selected interviews and other writings 1972–1977 (trans: Gordon, C., Marshall, L., Mepham, J., & Soper, K.) (pp. 78–108). New York, NY: Pantheon.
  4. George, C. K. (2009). The challenges of urbanisation in Nigerian Urban Centres: The Lagos Mega-City Situation—a town planner’s perspective. Lagos: Spectroplan Konsult Ltd.
  5. Graham, S. (2011). Disruptions. In M. Gandy (Ed.), Urban constellations. Berlin: Jovis Verlag GmbH.
  6. Debt Management Office. (2014). Revenue, expenditure and debt profile, a sustainable fiscal trend. Lagos: Lagos State Ministry of Finance.
  7. National Bureau of Statistics. (2009). Nigeria—Harmonised Nigeria Living Standard Survey 2009, First Round. Abuja: National Bureau of Statistics/Federal Government of Nigeria.
  8. Omezi, G. (2014). Lagos: City of concrete. In M. Gandy (Ed.), Urban constellations. Berlin: Jovis Verlag GmbH.

Cited by

See all 73

Metadata

Authors
Adama, O.
Affiliations
Stockholm University (SE)
Corresponding author
Adama, Onyanta
Venue
GeoJournal
Published
2017-01-31
Volume
83
Issue
2
Pages
257-274
ISSN
  • 0343-2521 (ISSN-L)
  • 1572-9893
OpenAlex
W2584031056
Cited by
73
References
71
Citations by year
2026: 4 · 2025: 10 · 2024: 10 · 2023: 12 · 2022: 9 · 2021: 8 · 2020: 11 · 2019: 6 · 2018: 2 · 2017: 1
FWCI
19.18
Type
journal article
Language
en
Open access
Locations
GeoJournal (publishedVersion, cc-by)
Funders
Swedish International Development Cooperation Agency (SWE-2011-195)
Topics
  • Social Sciences › Urban Studies › Urban Planning and Governance
  • Social Sciences › Business, Management and Accounting › Strategy and Management › Public-Private Partnership Projects
  • Social Sciences › Political Science and International Relations › Water Governance and Infrastructure
Keywords
megaprojects, infrastructure financing, public-private partnerships, intergovernmental relations, federal-state relations, political economy of infrastructure, socio-spatial exclusion, neoliberalism, modernism, urban imaginary, Lagos

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

The claim verdicts this report counts are experimental: their accuracy is not yet measured.

A language model drew the claims from the paper on 2026-10-10, under version 3 of the claim definition (model deepseek-v4.1-flash, prompt extract-v3).

A second model labelled each claim on 2026-10-10 (model jev-1.13-20260917, definition revision gold-guideline-v0.2).

Cited sources are checked with a language model’s help (qwen3.8-omni-flash).

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Urban imaginaries: funding mega infrastructure projects in Lagos, Nigeria. https://app.cochat.ai/papers/10.1007/s10708-016-9761-8
The paper
Adama, O. (2018). Urban imaginaries: funding mega infrastructure projects in Lagos, Nigeria. GeoJournal. https://doi.org/10.1007/s10708-016-9761-8

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.