Forecasting intermittent demand in manufacturing: a comparative evaluation of Croston's method
The DOI matches its Crossref record; 4 of the 4 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Production and inventory management
Hax, A. C., & Cândea, D. (1983) · Medical Entomology and Zoology · Cited by 1,884
Forecasting and Stock Control for Intermittent Demands
Croston, J. D. (1972) · Journal of the Operational Research Society · doi:10.1057/jors.1972.50 · Cited by 753
Decision systems for inventory management and production planning
Valqui Vidal, R. (1986) · European Journal of Operational Research · doi:10.1016/0377-2217(86)90310-3 · Cited by 700
Operations Research in Inventory Management: A Review and Critique
Silver, E. A. (1981) · Operations Research · doi:10.1287/opre.29.4.628 · Cited by 388
Cited by
25 years of time series forecasting
De Gooijer, J. G., & Hyndman, R. J. (2006) · International Journal of Forecasting · doi:10.1016/j.ijforecast.2006.01.001 · Cited by 1,587
Exponential smoothing: The state of the art—Part II
Gardner, E. S. (2006) · International Journal of Forecasting · doi:10.1016/j.ijforecast.2006.03.005 · Cited by 948
The accuracy of intermittent demand estimates
Syntetos, A. A., & Boylan, J. E. (2005) · International Journal of Forecasting · doi:10.1016/j.ijforecast.2004.10.001 · Cited by 489
On the categorization of demand patterns
Syntetos, A. A., Boylan, J. E., & Croston, J. D. (2005) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2601841 · Cited by 425
A new approach to forecasting intermittent demand for service parts inventories
Willemain, T. R., Smart, C. N., & Schwarz, H. F. (2004) · International Journal of Forecasting · doi:10.1016/s0169-2070(03)00013-x · Cited by 394
Self-citationOn the bias of intermittent demand estimates
Syntetos, A. A., & Boylan, J. E. (2001) · International Journal of Production Economics · doi:10.1016/s0925-5273(00)00143-2 · Cited by 362
Supply chain forecasting: Theory, practice, their gap and the future
Syntetos, A. A., Babai, Z., Boylan, J. E., Kolassa, S., & Nikolopoulos, K. (2016) · European Journal of Operational Research · doi:10.1016/j.ejor.2015.11.010 · Cited by 328
Forecasting and operational research: a review
Fildes, R., Nikolopoulos, K., Crone, S. F., & Syntetos, A. A. (2008) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2602597 · Cited by 287
“Despite the theoretical superiority of Croston’s method, only modest benefits have been recorded in the literature when it was compared with simpler forecasting techniques (Willemain et al, 1994).”
BackgroundA machine learning framework for customer purchase prediction in the non-contractual setting
Martínez, A., Schmuck, C., Pereverzyev, S., Pirker, C., & Haltmeier, M. (2020) · European Journal of Operational Research · doi:10.1016/j.ejor.2018.04.034 · Cited by 264
Intermittent demand: Linking forecasting to inventory obsolescence
Teunter, R. H., Syntetos, A. A., & Zied Babai, M. (2011) · European Journal of Operational Research · doi:10.1016/j.ejor.2011.05.018 · Cited by 252
Bacchetti, A., & Saccani, N. (2012) · Omega · doi:10.1016/j.omega.2011.06.008 · Cited by 248
“In the time series stream, most comparative studies supported the superiority of Croston’s method and its variants over traditional time series methods (see for instance, [78]).”
MethodGhobbar, A. A., & Friend, C. H. (2003) · Computers & Operations Research · doi:10.1016/s0305-0548(02)00125-9 · Cited by 235
“The single exponential smoothing and the Croston methods are the most frequently used methods for forecasting low and intermittent demands [5,7].”
MethodResultIntermittent demand forecasts with neural networks
Kourentzes, N. (2013) · International Journal of Production Economics · doi:10.1016/j.ijpe.2013.01.009 · Cited by 230
“However, Willemain et al. (1994) questioned this assumption of independence.”
BackgroundMethodInfluentialForecasting for the ordering and stock-holding of spare parts
Eaves, A. H. C., & Kingsman, B. G. (2004) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2601697 · Cited by 214
Kilimci, Z. H., Akyuz, A. O., Uysal, M., Akyokus, S., Uysal, M. O., Atak Bulbul, B., & Ekmis, M. A. (2019) · Complexity · doi:10.1155/2019/9067367 · Cited by 196
“Its superior performance over the single exponential smoothing (SES) method has been demonstrated byWillemain [10].”
BackgroundMethodSDMSim: A manufacturing service supply–demand matching simulator under cloud environment
Tao, F., Cheng, J., Cheng, Y., Gu, S., Zheng, T., & Yang, H. (2017) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/j.rcim.2016.07.001 · Cited by 192
Improving forecasting by estimating time series structural components across multiple frequencies
Kourentzes, N., Petropoulos, F., & Trapero, J. R. (2014) · International Journal of Forecasting · doi:10.1016/j.ijforecast.2013.09.006 · Cited by 182
“Willemain et al. (1994) were the first to examine the impacts of temporal aggregation in the context of intermittent demand empirically.”
BackgroundUnconstraining methods for revenue management systems under small demand
Kourentzes, N., Li, D., & Strauss, A. K. (2019) · Journal of Revenue and Pricing Management · doi:10.1057/s41272-017-0117-x · Cited by 9
“Exponential smoothing methods and variants are widely used due to their simplicity and effectiveness in the face of small data samples (for examples, see: Willemain et al., 1994; Babai et al., 2012; Bacchetti and Saccani, 2012).”
Method
Metadata
- Authors
- Willemain, T. R., Smart, C. N., Shockor, J. H., & DeSautels, P. A.
- Venue
- International Journal of Forecasting
- Publisher
- Elsevier BV
- Published
- 1994-12
- Volume
- 10
- Issue
- 4
- Pages
- 529-538
- ISSN
- 0169-2070 (ISSN-L)
- OpenAlex
- W2095220782
- Cited by
- 237
- References
- 4
- FWCI
- 1.30
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.