The DOI matches its Crossref record; 87 of the 87 references it cites were found in a registry or an index.
BIM-enabled facilities operation and maintenance: A review
Abstract
Abstract Building Information modeling (BIM) has the potential to advance and transform facilities Operation and Maintenance (O&M) by providing a platform for facility managers to retrieve, analyze, and process building information in a digitalized 3D environment. Currently, because of rapid developments in BIM, researchers and industry professionals need a state-of-the-art overview of BIM implementation and research in facility O&M. This paper presents a review of recent publications on the topic. It aims to evaluate and summarize the current BIM-O&M research and application developments from a facility manager's point of view, analyze research trends, and identify research gaps and promising future research directions. The scope of this research includes the academic articles, industry reports and guidelines pertaining to using BIM to improve selected facility O&M activities, including maintenance and repair, emergency management, energy management, change/relocation management, and security. The content analysis results show that research on BIM for O&M is still in its early stage and most of the current research has focused on energy management. We have identified that the interoperability in the BIM-O&M context is still a challenge and adopting the National Institute of Standards and Technology (NIST) Cyber-Physical Systems (CPS) Framework is a potential starting point to address this issue. More studies involving surveys are needed to understand the underlying O&M principles for BIM implementation – data requirements, areas of inefficiencies, the process changes. In addition, more studies on the return on investment of the innovative systems are required to justify the value of BIM-O&M applications and an improved Life Cycle Cost Analysis method is critical for such justifications.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A note on two problems in connexion with graphs
Dijkstra, E. W. (1959) · Numerische Mathematik · doi:10.1007/bf01386390 · Cited by 24,043
Eastman, C., Teicholz, P. M., Sacks, R., & Liston, K. (2008) · Cited by 2,892
Building Information Modeling (BIM) for existing buildings — Literature review and future needs
Volk, R., Stengel, J., & Schultmann, F. (2014) · Automation in Construction · doi:10.1016/j.autcon.2013.10.023 · Cited by 2,199
Tang, P., Huber, D., Akinci, B., Lipman, R., & Lytle, A. (2010) · Automation in Construction · doi:10.1016/j.autcon.2010.06.007 · Cited by 1,139
de Wilde, P. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.02.009 · Cited by 1,045
Application Areas and Data Requirements for BIM-Enabled Facilities Management
Becerik-Gerber, B., Jazizadeh, F., Li, N., & Calis, G. (2012) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000433 · Cited by 915
Xia, F., Yang, L. T., Wang, L., & Vinel, A. (2012) · International Journal of Communication Systems · doi:10.1002/dac.2417 · Cited by 846
Cognitive walkthroughs: a method for theory-based evaluation of user interfaces
Polson, P. G., Lewis, C., Rieman, J., & Wharton, C. (1992) · International Journal of Man-Machine Studies · doi:10.1016/0020-7373(92)90039-n · Cited by 797
Smart city and the applications
Su, K., Li, J., & Fu, H. (2011) · 2011 International Conference on Electronics, Communications and Control (ICECC) · doi:10.1109/icecc.2011.6066743 · Cited by 719
Enhancing environmental sustainability over building life cycles through green BIM: A review
Wong, J. K. W., & Zhou, J. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.06.003 · Cited by 671
Kelleher, J. D., Namee, B. M., & D’Arcy, A. (2015) · Cited by 626
Building Information Modeling (BIM) for green buildings: A critical review and future directions
Lu, Y., Wu, Z., Chang, R., & Li, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.024 · Cited by 555
Toward intelligent machine-to-machine communications in smart grid
Fadlullah, Z. M., Fouda, M. M., Kato, N., Takeuchi, A., Iwasaki, N., & Nozaki, Y. (2011) · IEEE Communications Magazine · doi:10.1109/mcom.2011.5741147 · Cited by 518
The building information modelling trajectory in facilities management: A review
Parn, E. A., Edwards, D. J., & Sing, M. C. P. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.12.003 · Cited by 435
A scientometric review of global BIM research: Analysis and visualization
Zhao, X. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.04.002 · Cited by 434
BIM and Construction Management: Proven Tools, Methods, and Workflows
Hardin, B. (2009) · Cited by 423
Building operation and energy performance: Monitoring, analysis and optimisation toolkit
Costa, A., Keane, M. M., Torrens, J. I., & Corry, E. (2013) · Applied Energy · doi:10.1016/j.apenergy.2011.10.037 · Cited by 394
Shen, W., Hao, Q., Mak, H., Neelamkavil, J., Xie, H., Dickinson, J., Thomas, R., Pardasani, A., & Xue, H. (2010) · Advanced Engineering Informatics · doi:10.1016/j.aei.2009.09.001 · Cited by 380
A knowledge-based BIM system for building maintenance
Motawa, I., & Almarshad, A. (2013) · Automation in Construction · doi:10.1016/j.autcon.2012.09.008 · Cited by 379
A mixed review of the adoption of Building Information Modelling (BIM) for sustainability
Chong, H.-Y., Lee, C.-Y., & Wang, X. (2017) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2016.09.222 · Cited by 371
Mapping the managerial areas of Building Information Modeling (BIM) using scientometric analysis
He, Q., Wang, G., Luo, L., Shi, Q., Xie, J., & Meng, X. (2017) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.08.001 · Cited by 351
BIM in facilities management applications: a case study of a large university complex
Kassem, M., Kelly, G., Dawood, N. N., Serginson, M., & Lockley, S. (2015) · Built Environment Project and Asset Management · doi:10.1108/bepam-02-2014-0011 · Cited by 339
BIM for infrastructure: An overall review and constructor perspective
Bradley, A., Li, H., Lark, R., & Dunn, S. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.08.019 · Cited by 324
Santos, R., Costa, A. A., & Grilo, A. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.03.005 · Cited by 318
Mapping the knowledge domains of Building Information Modeling (BIM): A bibliometric approach
Li, X., Wu, P., Shen, G. Q., Wang, X., & Teng, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.09.011 · Cited by 307
Planning and developing facility management-enabled building information model (FM-enabled BIM)
Pishdad-Bozorgi, P., Gao, X., Eastman, C., & Self, A. P. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.12.004 · Cited by 300
Self-citationDesigning a BIM-based serious game for fire safety evacuation simulations
Rüppel, U., & Schatz, K. (2011) · Advanced Engineering Informatics · doi:10.1016/j.aei.2011.08.001 · Cited by 273
Patterns and trends in Building Information Modeling (BIM) research: A Latent Semantic Analysis
Yalcinkaya, M., & Singh, V. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.07.012 · Cited by 272
Motamedi, A., Hammad, A., & Asen, Y. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.03.012 · Cited by 266
Song, Y., Wang, X., Tan, Y., Wu, P., Sutrisna, M., Cheng, J. C. P., & Hampson, K. (2017) · ISPRS International Journal of Geo-Information · doi:10.3390/ijgi6120397 · Cited by 237
Gerrish, T., Ruikar, K., Cook, M., Johnson, M., Phillip, M., & Lowry, C. (2017) · Energy and Buildings · doi:10.1016/j.enbuild.2017.03.032 · Cited by 219
BIM integrated smart monitoring technique for building fire prevention and disaster relief
Cheng, M.-Y., Chiu, K.-C., Hsieh, Y.-M., Yang, I.-T., Chou, J.-S., & Wu, Y.-W. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.027 · Cited by 215
Mills, E. (2011) · Energy Efficiency · doi:10.1007/s12053-011-9116-8 · Cited by 205
A BIM centered indoor localization algorithm to support building fire emergency response operations
Li, N., Becerik-Gerber, B., Krishnamachari, B., & Soibelman, L. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.02.019 · Cited by 204
Isikdag, U., Underwood, J., & Aouad, G. (2008) · Advanced Engineering Informatics · doi:10.1016/j.aei.2008.06.001 · Cited by 197
A BIM-enabled information infrastructure for building energy Fault Detection and Diagnostics
Dong, B., O'Neill, Z., & Li, Z. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.04.007 · Cited by 186
Merging BIM and GIS using ontologies application to urban facility management in ACTIVe3D
Mignard, C., & Nicolle, C. (2014) · Computers in Industry · doi:10.1016/j.compind.2014.07.008 · Cited by 185
Building Information Modelling for analysis of energy efficient industrial buildings – A case study
Gourlis, G., & Kovacic, I. (2017) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2016.02.009 · Cited by 172
Natural markers for augmented reality-based indoor navigation and facility maintenance
Koch, C., Neges, M., König, M., & Abramovici, M. (2014) · Automation in Construction · doi:10.1016/j.autcon.2014.08.009 · Cited by 167
Augmented reality-based computational fieldwork support for equipment operations and maintenance
Lee, S., & Akin, Ö. (2011) · Automation in Construction · doi:10.1016/j.autcon.2010.11.004 · Cited by 161
Donkers, S., Ledoux, H., Zhao, J., & Stoter, J. (2015) · Transactions in GIS · doi:10.1111/tgis.12162 · Cited by 158
GhaffarianHoseini, A., Zhang, T., Nwadigo, O., GhaffarianHoseini, A., Naismith, N., Tookey, J., & Raahemifar, K. (2017) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2016.12.061 · Cited by 155
Shou, W., Wang, J., Wang, X., & Chong, H. (2014) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-014-9125-9 · Cited by 154
Oti, A. H., Kurul, E., Cheung, F. K. T., & Tah, J. H. M. (2016) · Automation in Construction · doi:10.1016/j.autcon.2016.08.043 · Cited by 132
Monitoring thermal comfort in subways using building information modeling
Marzouk, M. M., & Abdelaty, A. (2014) · Energy and Buildings · doi:10.1016/j.enbuild.2014.08.006 · Cited by 127
Yang, Z., Ghahramani, A., & Becerik-Gerber, B. (2016) · Energy · doi:10.1016/j.energy.2016.04.099 · Cited by 125
Building information modelling for facility management: are we there yet?
Edirisinghe, R. K., London, K. A., Kalutara, P., et al. (2017) · Engineering Construction & Architectural Management · doi:10.1108/ecam-06-2016-0139 · Cited by 123
Developing Mobile‐ and BIM‐Based Integrated Visual Facility Maintenance Management System
Lin, Y., & Su, Y.-C. (2013) · The Scientific World JOURNAL · doi:10.1155/2013/124249 · Cited by 120
Petri, I., Kubicki, S., Rezgui, Y., Guerriero, A., & Li, H. (2017) · Energies · doi:10.3390/en10081167 · Cited by 110
Usability evaluation of a web-based tool for supporting holistic building energy management
McGlinn, K., Yüce, B., Wicaksono, H., Howell, S., & Rezgui, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.033 · Cited by 105
Shen, W., Hao, Q., & Xue, Y. (2012) · Automation in Construction · doi:10.1016/j.autcon.2012.04.003 · Cited by 104
Mining building performance data for energy-efficient operation
Ahmed, A., Korres, N. E., Ploennigs, J., Elhadi, H., & Menzel, K. (2010) · Advanced Engineering Informatics · doi:10.1016/j.aei.2010.10.002 · Cited by 103
Model predictive HVAC control with online occupancy model
Dobbs, J. R., & Hencey, B. (2014) · Energy and Buildings · doi:10.1016/j.enbuild.2014.07.051 · Cited by 102
Activity theory-based analysis of BIM implementation in building O&M and first response
Lu, Q., Chen, L., Lee, S., & Zhao, X. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.10.017 · Cited by 97
BIM in the operations stage: bottlenecks and implications for owners
Bosch, A., Volker, L., & Koutamanis, A. (2015) · Built Environment Project and Asset Management · doi:10.1108/bepam-03-2014-0017 · Cited by 96
Irizarry, J., Gheisari, M., Williams, G., & Roper, K. O. (2014) · Facilities · doi:10.1108/f-05-2012-0034 · Cited by 94
Building Information Modelling for Smart Built Environments
Zhang, J., Seet, B., & Lie, T. T. (2015) · Buildings · doi:10.3390/buildings5010100 · Cited by 92
RFID-assisted indoor localization and the impact of interference on its performance
Papapostolou, A., & Chaouchi, H. (2010) · Journal of Network and Computer Applications · doi:10.1016/j.jnca.2010.04.009 · Cited by 78
Localization of RFID-equipped assets during the operation phase of facilities
Motamedi, A., Soltani, M. M., & Hammad, A. (2013) · Advanced Engineering Informatics · doi:10.1016/j.aei.2013.07.001 · Cited by 76
Building Information Modeling (BIM) for Facilities Management – Literature Review and Future Needs
Yalcinkaya, M., & Singh, V. (2014) · IFIP advances in information and communication technology · doi:10.1007/978-3-662-45937-9_1 · Cited by 74
Making the Digital City: The Early Shaping of Urban Internet Space
Barlow, J. (2006) · CommonKnowledge Research Repository (Pacific University Oregon) · Cited by 74
TDVRP and BIM Integrated Approach for In-Building Emergency Rescue Routing
Chen, A. Y., & Chu, C. (2015) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000522 · Cited by 74
Nongeometric Building Information Needs Assessment for Facilities Management
Mayo, G., & Issa, R. R. A. (2015) · Journal of Management in Engineering · doi:10.1061/(asce)me.1943-5479.0000414 · Cited by 73
Developing Mobile BIM/2D Barcode-Based Automated Facility Management System
Lin, Y., Su, Y.-C., & Chen, Y.-P. (2014) · The Scientific World JOURNAL · doi:10.1155/2014/374735 · Cited by 63
Making the Digital City : The Early Shaping of Urban Internet Space
Aurigi, A. (2005) · doi:10.25405/ncl.34079100 · Cited by 61
A study on data visualization of embedded sensors for building energy monitoring using BIM
Lee, D.-H., Cha, G., & Park, S. (2016) · International Journal of Precision Engineering and Manufacturing · doi:10.1007/s12541-016-0099-4 · Cited by 55
Schmidt, M., Moreno, M. V., Schülke, A., Macek, K., Mařík, K., & Pastor, A. G. (2017) · Energy and Buildings · doi:10.1016/j.enbuild.2017.05.002 · Cited by 55
Change management—A key integrative function of PM in transition economies
Voropajev, V. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00010-0 · Cited by 54
An energy-aware, agent-based maintenance-scheduling framework to improve occupant satisfaction
Cao, Y. H., Wang, T., & Song, X. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.09.002 · Cited by 53
A 6D CAD Model for the Automatic Assessment of Building Sustainability
Yung, P., & Wang, X. (2014) · International Journal of Advanced Robotic Systems · doi:10.5772/58446 · Cited by 52
Halfawy, M. R. (2009) · Automation in Construction · doi:10.1016/j.autcon.2009.11.013 · Cited by 48
Micro-climatization and real-time digitalization effects on energy efficiency based on user behavior
Habibi, S. (2017) · Building and Environment · doi:10.1016/j.buildenv.2016.12.039 · Cited by 48
Emergency Evacuation Guidance Design for Complex Building Geometries
Chu, J. C., & Yeh, C.-Y. (2011) · Journal of Infrastructure Systems · doi:10.1061/(asce)is.1943-555x.0000080 · Cited by 46
Literature review of green retrofit design for commercial buildings with BIM implication
Bu, S., Shen, Q., Anumba, C., Wong, A. K. D., & Liang, X. (2015) · Smart and Sustainable Built Environment · doi:10.1108/sasbe-08-2014-0043 · Cited by 46
Automatically Updating Maintenance Information from a BIM Database
Liu, R., & Issa, R. R. A. (2012) · ASCE International Conference on Computing in Civil Engineering (i3CE) · doi:10.1061/9780784412343.0047 · Cited by 40
Chou, C., Chiang, C.-T., Wu, P.-Y., Chu, C.-P., & Lin, C.-Y. (2016) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2016.03.008 · Cited by 38
Breaking into BIM: Performing static and dynamic security analysis with the aid of BIM
Porter, S. R., Tan, T. P. L., Tan, T., & WEST, G. A. W. (2014) · Automation in Construction · doi:10.1016/j.autcon.2013.12.002 · Cited by 36
Xue, Y., & Ergan, S. (2015) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000510 · Cited by 36
Bridging the life cycle: a case study on facility management infrastructures and uses of BIM
Miettinen, R., Kerosuo, H., Metsälä, T., et al. (2017) · Journal of Facilities Management · doi:10.1108/jfm-04-2017-0017 · Cited by 36
Leveraging BIM to Provide Automated Support for Efficient Troubleshooting of HVAC-Related Problems
Xue, Y., & Ergan, S. (2015) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)cp.1943-5487.0000492 · Cited by 35
A new paradigm for the design and management of building systems
Lawrence, T. M., Watson, R. T., Boudreau, M., Johnsen, K., Perry, J., & Ding, L. (2012) · Energy and Buildings · doi:10.1016/j.enbuild.2012.04.016 · Cited by 33
Interior models of earthquake damaged buildings for search and rescue
Bloch, T., Sacks, R., & Rabinovitch, O. (2016) · Advanced Engineering Informatics · doi:10.1016/j.aei.2015.12.001 · Cited by 32
Leveraging BIM Interoperability for UWB-Based WSN Planning
Tomasi, R., Sottile, F., Pastrone, C., et al. (2015) · IEEE Sensors Journal · doi:10.1109/jsen.2015.2451736 · Cited by 31
Wu, W. B., Li, W., Law, D., & Na, W. (2015) · Procedia Engineering · doi:10.1016/j.proeng.2015.08.481 · Cited by 30
Visualising urban energy use: the use of LiDAR and remote sensing data in urban energy planning
Dawood, N. N., Dawood, H., Rodríguez, S., & Crilly, M. (2017) · Visualization in Engineering · doi:10.1186/s40327-017-0060-3 · Cited by 29
Comparative assessment of an indoor localization framework for building emergency response
Li, N., Becerik-Gerber, B., Soibelman, L., & Krishnamachari, B. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.04.004 · Cited by 28
Serious games as a virtual training ground for relocation to a new healthcare facility
Merschbrock, C., Lassen, A. K., Tollnes, T., & Munkvold, B. E. (2016) · Facilities · doi:10.1108/f-02-2015-0008 · Cited by 22
Cited by
Integrating BIM and AI for Smart Construction Management: Current Status and Future Directions
Pan, Y., & Zhang, L. (2023) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-022-09830-8 · Cited by 441
Deng, M., Menassa, C. C., & Kamat, V. R. (2021) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2021.005 · Cited by 422
Circular Digital Built Environment: An Emerging Framework
Çetin, S., De Wolf, C., & Bocken, N. (2021) · Sustainability · doi:10.3390/su13116348 · Cited by 367
Shahzad, M., Shafiq, M. T., Douglas, D., & Kassem, M. (2022) · Buildings · doi:10.3390/buildings12020120 · Cited by 325
A Circular Built Environment in the Digital Age
(2024) · Circular Economy and Sustainability · doi:10.1007/978-3-031-39675-5 · Cited by 59
Metadata
- Authors
- Gao, X., & Pishdad-Bozorgi, P.
- Venue
- Advanced Engineering Informatics
- Publisher
- Elsevier BV
- Published
- 2019-01
- Volume
- 39
- Pages
- 227-247
- ISSN
- 1474-0346 (ISSN-L)
- OpenAlex
- W2914106858
- Cited by
- 379
- References
- 87
- FWCI
- 28.26
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.