Cited by 116BIM and Construction IntegrationRobot Manipulation and LearningInnovations in Concrete and Construction Materials

BIM-based task-level planning for robotic brick assembly through image-based 3D modeling

Ding, Lieyun, Jiang, Weiguang, Zhou, Ying, Zhou, Cheng, Liu, Sheng·2020·Advanced Engineering Informatics

Integrity signals

Registry

Crossref · 10.1016/j.aei.2019.100993

Cites

2 of 2 references verified0 citation errors · 0 not checkable

Statistics

Recomputing p-values needs the paper’s full text.

Claims the paper makes

We couldn’t retrieve this paper’s full text, so its claims and self-check weren’t run. The registry and citation checks still apply.

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

  • In the process of experimental verification, task-level planning can maintain the same accuracy as that of the traditional method but saves time when facing more complex tasks.

    “In the process of experimental verification, task-level planning can maintain the same accuracy as that of the traditional method but saves time when facing more complex tasks.”
  • BIM and image-based modelling are used to calibrate robot pose for the unification of the robot coordinate system, construction area, and assembly task.

    “BIM and image-based modelling are used to calibrate robot pose for the unification of the robot coordinate system, construction area, and assembly task”
  • A simple conversion process is presented to convert the 3D placement point coordinates of each brick into the robotic control instructions.

    “a simple conversion process is presented to convert the 3D placement point coordinates of each brick into the robotic control instructions.”
  • A general IFC model for robotic assembly contains all the information needed for task-level planning.

    “A general IFC model for robotic assembly contains all the information needed for task-level planning”

Cites

Flagged first, then by citations

Cited by

Sorted by citations

Authors
Ding, L., Jiang, W., Zhou, Y., Zhou, C., & Liu, S.
Affiliations
Huazhong University of Science and Technology (CN)
Corresponding author
Zhou, Cheng
Venue
Advanced Engineering Informatics
Publisher
Elsevier BV
Published
2020-01
Volume
43
Pages
100993
ISSN
1474-0346 (ISSN-L)
OpenAlex
W2983455829
Cited by
116
References
2
Citations by year
2026: 11 · 2025: 24 · 2024: 22 · 2023: 23 · 2022: 19 · 2021: 15 · 2020: 2
FWCI
5.79
Type
journal article
Language
en
Open access
closed
Locations
Advanced Engineering Informatics (publishedVersion)
Funders
National Natural Science Foundation of China
Topics
  • Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
  • Physical Sciences › Engineering › Control and Systems Engineering › Robot Manipulation and Learning
  • Physical Sciences › Engineering › Building and Construction › Innovations in Concrete and Construction Materials
Keywords
building information model, image-based 3D modeling, construction robotics, modular structure

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review