The DOI matches its Crossref record; 27 of the 27 references it cites were found in a registry or an index.
Intelligent building research: a review
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Application of the AHP in project management
Al-Harbi, K. M. A.-S. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(99)00038-1 · Cited by 1,125
Life cycle costing—Theory, information acquisition and application
Woodward, D. G. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00089-0 · Cited by 587
Gluch, P., & Baumann, H. (2004) · Building and Environment · doi:10.1016/j.buildenv.2003.10.008 · Cited by 552
R&D project selection using the analytic network process
Meade, L. M., & Presley, A. R. (2002) · IEEE Transactions on Engineering Management · doi:10.1109/17.985748 · Cited by 528
Meade, L. M., & Sarkis, J. (1999) · International Journal of Production Research · doi:10.1080/002075499191751 · Cited by 518
Model-based optimal control of VAV air-conditioning system using genetic algorithm
Wang, S., & Jin, X. (2000) · Building and Environment · doi:10.1016/s0360-1323(99)00032-3 · Cited by 282
Self-citationRemer, D. S., & Nieto, A. P. (1995) · International Journal of Production Economics · doi:10.1016/0925-5273(95)00104-2 · Cited by 218
Prediction and optimization of life-cycle costs in early design
Bogenstätter, U. (2000) · Building Research & Information · doi:10.1080/096132100418528 · Cited by 202
The value of management flexibility—a real option approach to investment evaluation
Yeo, K. T., & Qiu, F. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00025-x · Cited by 202
Ho, S. P., & Liu, L. Y. (2002) · Construction Management and Economics · doi:10.1080/01446190110110533 · Cited by 158
An intelligent and responsive architecture
Kroner, W. M. (1997) · Automation in Construction · doi:10.1016/s0926-5805(97)00017-4 · Cited by 114
BACnetTM: a standard communication infrastructure for intelligent buildings
Bushby, S. T. (1997) · Automation in Construction · doi:10.1016/s0926-5805(97)00029-0 · Cited by 108
Remer, D. S., & Nieto, A. P. (1995) · International Journal of Production Economics · doi:10.1016/0925-5273(95)00105-0 · Cited by 95
Decision support to the application of intelligent building technologies
Yang, J., & Peng, H. (2001) · Renewable Energy · doi:10.1016/s0960-1481(00)00085-9 · Cited by 90
A procedure for multi-criteria selection of building assemblies
Nassar, K., Thabet, W. Y., & Beliveau, Y. J. (2003) · Automation in Construction · doi:10.1016/s0926-5805(03)00007-4 · Cited by 85
Estimating the life expectancies of building components in life‐cycle costing calculations
Ashworth, A. (1996) · International Journal of Building Pathology and Adaptation · doi:10.1108/02630809610122730 · Cited by 80
Aye, L., Bamford, N., Charters, B., & Robinson, J. (2000) · Construction Management and Economics · doi:10.1080/014461900446885 · Cited by 76
Intelligent office building performance evaluation
Preiser, W., & Schramm, U. (2002) · Facilities · doi:10.1108/02632770210435198 · Cited by 74
Evaluating intelligent buildings according to level of service systems integration
Arkin, H., & Paciuk, M. (1997) · Automation in Construction · doi:10.1016/s0926-5805(97)00025-3 · Cited by 67
Feedback, feedforward and control: post-occupancy evaluation to the rescue
Preiser, W. (2001) · Building Research & Information · doi:10.1080/09613210110072692 · Cited by 48
Hallikainen, P., Kivijärvi, H., & Nurmimäki, K. (2003) · Hawaii International Conference on System Sciences (HICSS) · doi:10.1109/hicss.2002.994346 · Cited by 41
Cost-benefit analysis of energy scenarios for the Mexican power sector
Islas, J., Manzini, F., & Martı́nez, M. (2003) · Energy · doi:10.1016/s0360-5442(03)00048-3 · Cited by 37
Disposal Costs for Environmentally Regulated Facilities: LCC Approach
Abraham, D. M., & Dickinson, R. J. (1998) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1998)124:2(146 · Cited by 35
Is IP everywhere the way ahead for building automation?
Finch, E. F. (2001) · Facilities · doi:10.1108/02632770110403365 · Cited by 27
Intelligent building systems in Hong Kong offices
Cho, M. C. T., & Fellows, R. F. (2000) · Facilities · doi:10.1108/02632770010328072 · Cited by 19
High-technology buildings and the information economy
Gann, D. (1990) · Habitat International · doi:10.1016/0197-3975(90)90047-5 · Cited by 7
Remote building control using the Internet
Finch, E. F. (1998) · Facilities · doi:10.1108/02632779810235672 · Cited by 6
Cited by
Experimental analysis of model predictive control for an energy efficient building heating system
Široký, J., Oldewurtel, F., Cigler, J., & Prívara, S. (2011) · Applied Energy · doi:10.1016/j.apenergy.2011.03.009 · Cited by 753
Energy intelligent buildings based on user activity: A survey
Nguyen, T. A., & Aiello, M. (2013) · Energy and Buildings · doi:10.1016/j.enbuild.2012.09.005 · Cited by 714
Optimal sizing of renewable hybrids energy systems: A review of methodologies
Luna-Rubio, R., Trejo-Perea, M., Vargas-Vázquez, D., & Ríos-Moreno, G. J. (2012) · Solar Energy · doi:10.1016/j.solener.2011.10.016 · Cited by 560
Smart homes and their users: a systematic analysis and key challenges
Wilson, C., Hargreaves, T., & Hauxwell-Baldwin, R. (2015) · Personal and Ubiquitous Computing · doi:10.1007/s00779-014-0813-0 · Cited by 519
Communication systems for building automation and control
Kastner, W., Neugschwandtner, G., Soucek, S., & Newman, H. M. (2005) · Proceedings of the IEEE · doi:10.1109/jproc.2005.849726 · Cited by 479
Metadata
- Authors
- Wong, J. K. W., Li, H., & Wang, S. W.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2005-01
- Volume
- 14
- Issue
- 1
- Pages
- 143-159
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W1511410009
- Cited by
- 408
- References
- 27
- FWCI
- 25.58
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.