Prediction and optimization of life-cycle costs in early design

Bogenstätter, Ulrich·2000·Building Research & Information

Abstract

Operation costs over the life-cycle of a building are a multiple of the initial construction costs. Decisions in the programming stage (briefing) and design process influence life-cycle costs in terms of space, the quantity of structural elements, technical/mechanical service equipment and the choice of materials. The way that the economic and ecological goals are set will influence the efficiency and effectiveness through an appropriate design. To realize the requirements of sustainable building in daily administrative practice, characteristic values for specific building tasks are needed which are determined through the analysis of completed buildings. The resulting target values enable architects and engineers to get a clear and consistent definition of project goals at the programming stage. An interdisciplinary team is needed to manage and guarantee these target values during the whole design process and at the beginning of the utilization phase. Les coûts d'exploitation générés tout au long de la durée de vie d'un bâtiment sont un multiple des coûts de construction initiaux. Les décisions prises à l'étape de programmation (briefing) et lors du processus de conception influent sur les coûts du cycle de vie en termes d'espace, de quantité d'éléments structurels, d'équipements d'entretien technique/mécanique et de choix des matériaux. La définition des objectifs économiques et écologiques, dans le cadre d'une conception appropriée, influe sur le rendement et l'efficacité. Afin de satisfaire aux exigences de construction durable dans la pratique administrative quotidienne, il est nécessaire de déterminer des valeurs caractéristiques pour des tâches de construction spécifiques grâce à l'analyse de l'ensemble des bâtiments. Les valeurs ciblées résultantes permettent aux architectes et aux ingénieurs d'obtenir une définition claire et cohérent des objectifs du projet, dès la phase de programmation. Une équipe interdisciplinaire est requise pour gérer et garantir le respect de ces valeurs ciblées tout au long du processus de conception et au début de la phase d'utilisation.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1080/096132100418528

Cites

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cited by

See all 202

Metadata

Authors
Bogenstätter, U.
Venue
Building Research & Information
Published
2000-09
Volume
28
Issue
5-6
Pages
376-386
ISSN
  • 0961-3218 (ISSN-L)
  • 1466-4321
OpenAlex
W2064465852
Cited by
202
References
0
FWCI
3.18
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Prediction and optimization of life-cycle costs in early design. https://app.cochat.ai/papers/10.1080/096132100418528
The paper
Bogenstätter, U. (2000). Prediction and optimization of life-cycle costs in early design. Building Research & Information. https://doi.org/10.1080/096132100418528

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.