The DOI matches its Crossref record.
Automated project performance control of construction projects
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Construction with digital twin information systems
Sacks, R., Brilakis, I., Pikas, E., Xie, H. S., & Girolami, M. (2020) · Data-Centric Engineering · doi:10.1017/dce.2020.16 · Cited by 609
“Navon (2005) proposed a system termed “ APPC ” (Navon, 2005; Navon and Sacks, 2007), as shown in Figure 1.”
MethodAwolusi, I., Marks, E., & Hallowell, M. (2018) · Automation in Construction · doi:10.1016/j.autcon.2017.10.010 · Cited by 496
Construction safety and digital design: A review
Zhou, W., Whyte, J., & Sacks, R. (2012) · Automation in Construction · doi:10.1016/j.autcon.2011.07.005 · Cited by 303
Building Information Modelling, Artificial Intelligence and Construction Tech
Sacks, R., Girolami, M., & Brilakis, I. (2020) · Developments in the Built Environment · doi:10.1016/j.dibe.2020.100011 · Cited by 272
A new approach for project control under uncertainty. Going back to the basics
Acebes, F., Pajares, J., Galán, J. M., & López-Paredes, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.08.003 · Cited by 165
“Several authors have improved the traditional EV by enhancing its capability in evaluating and monitoring project progress (Naeni et al., 2011; Navon, 2005; Vanhoucke and Vandevoorde, 2007; Warburton, 2011).”
Background
Metadata
- Authors
- Navon, R.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2005-08
- Volume
- 14
- Issue
- 4
- Pages
- 467-476
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W2075872621
- Cited by
- 248
- References
- 0
- FWCI
- 17.05
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.