The DOI matches its Crossref record; 20 of the 20 references it cites were found in a registry or an index.
Requirements for building information modeling based lean production management systems for construction
Open accessOverview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Deming, W. E. (1982) · Medical Entomology and Zoology · Cited by 7,297
Eastman, C., Teicholz, P. M., Sacks, R., & Liston, K. (2008) · Cited by 2,892
Self-citationTHE LAST PLANNER SYSTEM OF PRODUCTION CONTROL
Ballard, H. G. (2000) · University of Birmingham Institutional Research Archive (University of Birmingham) · Cited by 2,057
An exploration towards a production theory and its application to construction
Koskela, L. (2000) · Aaltodoc (Aalto University) · Cited by 1,796
Liker, J. Κ. (2003) · Cited by 1,134
A Language/Action Perspective on the Design of Cooperative Work
Winograd, T. (1987) · Human–Computer Interaction · doi:10.1207/s15327051hci0301_2 · Cited by 476
Parade Game: Impact of Work Flow Variability on Trade Performance
Tommelein, I. D., Riley, D. R., & Howell, G. A. (1999) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1999)125:5(304 · Cited by 317
Visualization of Work Flow to Support Lean Construction
Sacks, R., Treckmann, M., & Rozenfeld, O. (2009) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000102 · Cited by 226
Self-citationAssessing research issues in Automated Project Performance Control (APPC)
Navon, R., & Sacks, R. (2007) · Automation in Construction · doi:10.1016/j.autcon.2006.08.001 · Cited by 225
Self-citationLEAPCON: Simulation of Lean Construction of High-Rise Apartment Buildings
Sacks, R., Esquenazi, A., & Goldin, M. (2007) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2007)133:7(529 · Cited by 124
Self-citationWorkPlan: Constraint-Based Database for Work Package Scheduling
Choo, H. J., Tommelein, I. D., Ballard, G., & Zabelle, T. R. (1999) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(1999)125:3(151 · Cited by 121
An economic game theory model of subcontractor resource allocation behaviour
Sacks, R., & Harel, M. (2006) · Construction Management and Economics · doi:10.1080/01446190600631856 · Cited by 99
Self-citationVisual systems : harnessing the power of the visual workplace
Galsworth, G. D. (1997) · Medical Entomology and Zoology · Cited by 93
Understanding construction supply chains: an alternative interpretation
Vrijhoef, R., Koskela, L., & Howell, G. A. (2001) · University of Salford Institutional Repository (University of Salford) · Cited by 69
Production System Loading–Cycle Time Relationship in Residential Construction
Bashford, H. H., Walsh, K. D., & Sawhney, A. (2004) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:1(15 · Cited by 48
Visual representation of construction management data
Russell, A. D., Chiu, C.-Y., & Korde, T. (2009) · Automation in Construction · doi:10.1016/j.autcon.2009.05.006 · Cited by 46
A novel solution for construction on-site communication – the information booth
Hewage, K., & Ruwanpura, J. Y. (2009) · Canadian Journal of Civil Engineering · doi:10.1139/l09-026 · Cited by 42
ASSISTANCE TO BUILDING CONSTRUCTION COORDINATION – TOWARDS A MULTI-VIEW COOPERATIVE PLATFORM
Kubicki, S., Bignon, J.-C., Halin, G., & Humbert, P. (2006) · HAL · Cited by 36
Linking Production-Level Workflow With Materials Supply
Arbulu, R., Koerckel, A., & España, F. (2005) · Cited by 23
FEASIBILITY STUDY OF FIELD FORCE AUTOMATION IN THE SWEDISH CONSTRUCTION SECTOR
Olofsson, T., & Emborg, M. (2004) · KTH Publication Database DiVA (KTH Royal Institute of Technology) · Cited by 22
Cited by
Application Areas and Data Requirements for BIM-Enabled Facilities Management
Becerik-Gerber, B., Jazizadeh, F., Li, N., & Calis, G. (2012) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000433 · Cited by 915
Interaction of Lean and Building Information Modeling in Construction
Sacks, R., Koskela, L., Dave, B. A., & Owen, R. (2010) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000203 · Cited by 689
Self-citationBuilding Information Modeling (BIM) for green buildings: A critical review and future directions
Lu, Y., Wu, Z., Chang, R., & Li, Y. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.08.024 · Cited by 555
Applying lean thinking in construction and performance improvement
Aziz, R. F., & Hafez, S. M. (2013) · Alexandria Engineering Journal · doi:10.1016/j.aej.2013.04.008 · Cited by 513
A scientometric review of global BIM research: Analysis and visualization
Zhao, X. (2017) · Automation in Construction · doi:10.1016/j.autcon.2017.04.002 · Cited by 434
Metadata
- Authors
- Sacks, R., Radosavljevic, M., & Barak, R.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2010-08
- Volume
- 19
- Issue
- 5
- Pages
- 641-655
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W2105917825
- Cited by
- 345
- References
- 20
- FWCI
- 34.12
- Type
- journal article
- Language
- en
- Open access
- bronze
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.