The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.
Predicting construction cost overruns using text mining, numerical data and ensemble classifiers
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
The WEKA data mining software: an update
Hall, M., Frank, E., Holmes, G., Pfahringer, B., Reutemann, P., & Witten, I. H. (2009) · ACM SIGKDD Explorations Newsletter · doi:10.1145/1656274.1656278 · Cited by 17,750
Research works printed but not linked: 15
- Caldas, 2003, Automating hierarchical document classification for construction management information systems, Autom. Constr., 12, 395, 10.1016/S0926-5805(03)00004-9 · DOI · Paper page
- Soibelman, 2002, Data preparation process for construction knowledge generation through knowledge discovery in databases, J. Comput. Civil Eng., 16, 39, 10.1061/(ASCE)0887-3801(2002)16:1(39) · doi:10.1061/(asce)0887-3801(2002)16:1(39 · Paper page
- Soibelman, 2008, Management and analysis of unstructured construction data types, Adv. Eng. Inform., 22, 15, 10.1016/j.aei.2007.08.011 · doi:10.1016/j.aei.2007.08.011
- Son, 2012, Hybrid principal component analysis and support vector machine model for predicting the cost performance of commercial building projects using pre-project planning variables, Autom. Constr., 27, 60, 10.1016/j.autcon.2012.05.013 · DOI
- Gkritska, 2008, Estimating cost discrepancies in highway contracts: multistep econometric approach, J. Constr. Eng., 134, 953, 10.1061/(ASCE)0733-9364(2008)134:12(953) · doi:10.1061/(asce)0733-9364(2008)134:12(953
- Trost, 2003, Predicting accuracy of early cost estimates using factor analysis and multivariate regression, J. Constr. Eng., 129, 198, 10.1061/(ASCE)0733-9364(2003)129:2(198) · doi:10.1061/(asce)0733-9364(2003)129:2(198
- Nassar, 2005, Evaluating cost overruns of asphalt paving project using statistical process control methods, J. Constr. Eng., 131, 1173, 10.1061/(ASCE)0733-9364(2005)131:11(1173) · doi:10.1061/(asce)0733-9364(2005)131:11(1173
- Petroutsatou, 2011, Early cost estimating of road tunnel construction using neural networks, J. Constr. Eng., 138, 679, 10.1061/(ASCE)CO.1943-7862.0000479 · doi:10.1061/(asce)co.1943-7862.0000479
- Williams, 2005, Bidding ratios to predict highway project costs, Eng. Constr. Archit. Manag., 12, 38, 10.1108/09699980510576880 · doi:10.1108/09699980510576880
- Wilmot, 2003, Estimating future highway construction costs, J. Constr. Eng., 129, 272, 10.1061/(ASCE)0733-9364(2003)129:3(272) · doi:10.1061/(asce)0733-9364(2003)129:3(272
- Gaines, 1995, 1995, Induction of ripple-down rules applied to modeling large databases, J. Intell. Inf. Syst., 5, 211, 10.1007/BF00962234 · DOI · Paper page
- Ivanciuc, 2007, Applications of support vector machines in chemistry, Rev. Comput. Chem., 2007, 291, 10.1002/9780470116449.ch6 · DOI · Paper page
- Polikar, 2006, Ensemble based systems in decision making, IEEE Circuits Syst. Mag., 6, 21, 10.1109/MCAS.2006.1688199 · DOI · Paper page
- Saha, 2012, A comparative study on feature reduction approaches in Hindi and Bengali named entity recognition, Knowl. Based Syst., 27, 322, 10.1016/j.knosys.2011.09.015 · DOI
- Shane, 2009, Construction project cost escalation factors, J. Manag. Eng., 25, 221, 10.1061/(ASCE)0742-597X(2009)25:4(221) · doi:10.1061/(asce)0742-597x(2009)25:4(221 · Paper page
Cited by
Construction site accident analysis using text mining and natural language processing techniques
Zhang, F., Fleyeh, H., Wang, X., & Lu, M. (2019) · Automation in Construction · doi:10.1016/j.autcon.2018.12.016 · Cited by 380
Safety leading indicators for construction sites: A machine learning approach
Poh, C. Q. X., Ubeynarayana, C. U., & Goh, Y. M. (2018) · Automation in Construction · doi:10.1016/j.autcon.2018.03.022 · Cited by 290
Construction accident narrative classification: An evaluation of text mining techniques
Goh, Y. M., & Ubeynarayana, C. U. (2017) · Accident Analysis & Prevention · doi:10.1016/j.aap.2017.08.026 · Cited by 273
Patterns and trends in Building Information Modeling (BIM) research: A Latent Semantic Analysis
Yalcinkaya, M., & Singh, V. (2015) · Automation in Construction · doi:10.1016/j.autcon.2015.07.012 · Cited by 272
Ghimire, P., Kim, K., & Acharya, M. (2024) · Buildings · doi:10.3390/buildings14010220 · Cited by 175
Metadata
- Authors
- Williams, T. P., & Gong, J.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2014-07
- Volume
- 43
- Pages
- 23-29
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W1975633953
- Cited by
- 164
- References
- 1
- FWCI
- 9.45
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.elsevier.com/tdm/userlicense/1.0/ (tdm)
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Predicting construction cost overruns using text mining, numerical data and ensemble classifiers. https://app.cochat.ai/papers/10.1016/j.autcon.2014.02.014
- The paper
- Williams, T. P., & Gong, J. (2014). Predicting construction cost overruns using text mining, numerical data and ensemble classifiers. Automation in Construction. https://doi.org/10.1016/j.autcon.2014.02.014
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.