CoChat

Computer vision-based interior construction progress monitoring: A literature review and future research directions

Ekanayake, Biyanka, Wong, Johnny Kwok-Wai, Fini, Alireza Ahmadian Fard, Smith, Peter · 2021 · Automation in Construction
Cited by 175

The DOI matches its Crossref record; 16 of the 16 references it cites were found in a registry or an index.

Abstract

Abstract Computer vision (CV)-based technologies have been used to automate construction progress monitoring. The automation attempts to maximise precision and minimise human intervention in onsite progress monitoring. Such attempts have mainly focussed on exterior construction environments while there are significantly lesser number of studies on interior construction. This imbalance impedes automation of the onsite progress monitoring as a whole. Thus, the core intent of this study is to pave the way for advancing automated indoor progress monitoring by providing a systematic survey of extant literature. Main contributions of this survey include 1) presenting a full spectrum of CV-based approaches, tools, and algorithms adopted for indoor construction progress monitoring (ICPM) 2) portraying a succinct reference to the shortcomings, technical challenges, and scope limitations of the past studies on ICPM. The study then synthesises a readily usable agenda for hybridising CV with other data-driven technologies to improve automation in ICPM.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1016/j.autcon.2021.103705

Cites

16 of 16 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Cited by

Metadata

Authors
Ekanayake, B., Wong, J. K.-W., Fini, A. A. F., & Smith, P.
Venue
Automation in Construction
Publisher
Elsevier BV
Published
2021-07
Volume
127
Pages
103705
ISSN
0926-5805 (ISSN-L)
OpenAlex
W3154038916
Cited by
175
References
16
FWCI
11.33
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.