Multi-objective optimization for improved project management: Current status and future directions
The DOI matches its Crossref record; 126 of the 126 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Mirjalili, S. (2015) · Advances in Engineering Software · doi:10.1016/j.advengsoft.2015.01.010 · Cited by 3,233
Pan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103517 · Cited by 1,336
Self-citationTechnology developments in structural health monitoring of large-scale bridges
Ko, J. M., & Ni, Y. Q. (2005) · Engineering Structures · doi:10.1016/j.engstruct.2005.02.021 · Cited by 1,010
Review: Multi-objective optimization methods and application in energy saving
Cui, Y., Geng, Z., Zhu, Q., & Han, Y. (2017) · Energy · doi:10.1016/j.energy.2017.02.174 · Cited by 685
2016 49th Hawaii International Conference on System Sciences (HICSS)
(2016) · doi:10.1109/hicss38599.2016 · Cited by 623
Davila Delgado, J. M., Oyedele, L., Ajayi, A., Akanbi, L., Akinade, O., Bilal, M., & Owolabi, H. (2019) · Journal of Building Engineering · doi:10.1016/j.jobe.2019.100868 · Cited by 607
A genetic algorithm approach for multi-objective optimization of supply chain networks
Altiparmak, F., Gen, M., Lin, L., & Paksoy, T. (2006) · Computers & Industrial Engineering · doi:10.1016/j.cie.2006.07.011 · Cited by 596
Ilbahar, E., Karaşan, A., Cebi, S., & Kahraman, C. (2018) · Safety Science · doi:10.1016/j.ssci.2017.10.025 · Cited by 573
Asadi, E., Silva, M. G. D., Antunes, C. H., Dias, L., & Glicksman, L. (2014) · Energy and Buildings · doi:10.1016/j.enbuild.2014.06.009 · Cited by 523
Multi-objective optimization for building retrofit strategies: A model and an application
Asadi, E., da Silva, M. G., Antunes, C. H., & Dias, L. C. (2011) · Energy and Buildings · doi:10.1016/j.enbuild.2011.10.016 · Cited by 483
Cited by
Integrating BIM and AI for Smart Construction Management: Current Status and Future Directions
Pan, Y., & Zhang, L. (2023) · Archives of Computational Methods in Engineering · doi:10.1007/s11831-022-09830-8 · Cited by 441
Self-citationGPT models in construction industry: Opportunities, limitations, and a use case validation
Saka, A., Taiwo, R., Saka, N., Salami, B. A., Ajayi, S., Akande, K., & Kazemi, H. (2024) · Developments in the Built Environment · doi:10.1016/j.dibe.2023.100300 · Cited by 202
Metadata
- Authors
- Guo, K., & Zhang, L.
- Venue
- Automation in Construction
- Publisher
- Elsevier BV
- Published
- 2022-07
- Volume
- 139
- Pages
- 104256
- ISSN
- 0926-5805 (ISSN-L)
- OpenAlex
- W4229043305
- Cited by
- 164
- References
- 126
- FWCI
- 22.31
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Multi-objective optimization for improved project management: Current status and future directions. https://app.cochat.ai/papers/10.1016/j.autcon.2022.104256
- The paper
- Guo, K., & Zhang, L. (2022). Multi-objective optimization for improved project management: Current status and future directions. Automation in Construction. https://doi.org/10.1016/j.autcon.2022.104256
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.