Should we build more large dams? The actual costs of hydropower megaproject development
Open accessThe DOI matches its Crossref record; 42 of the 42 references it cites were found in a registry or an index.
Abstract
A brisk building boom of hydropower mega-dams is underway from China to Brazil. Whether benefits of new dams will outweigh costs remains unresolved despite contentious debates. We investigate this question with the "outside view" or "reference class forecasting" based on literature on decision-making under uncertainty in psychology. We find overwhelming evidence that budgets are systematically biased below actual costs of large hydropower dams - excluding inflation, substantial debt servicing, environmental, and social costs. Using the largest and most reliable reference data of its kind and multilevel statistical techniques applied to large dams for the first time, we were successful in fitting parsimonious models to predict cost and schedule overruns. The outside view suggests that in most countries large hydropower dams will be too costly in absolute terms and take too long to build to deliver a positive risk-adjusted return unless suitable risk management measures outlined in this paper can be affordably provided. Policymakers, particularly in developing countries, are advised to prefer agile energy alternatives that can be built over shorter time horizons to energy megaprojects.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Prospect Theory: An Analysis of Decision under Risk
Kahneman, D., & Tversky, A. (1979) · Econometrica · doi:10.2307/1914185 · Cited by 48,524
Prospect theory: An analysis of decision under risk
Kahneman, D., & Tversky, A. (1988) · Decision, Probability and Utility · doi:10.1017/cbo9780511609220.014 · Cited by 32,474
Tversky, A., & Kahneman, D. (1974) · Science · doi:10.1126/science.185.4157.1124 · Cited by 28,810
Judgment under Uncertainty: Heuristics and Biases
Tversky, A., & Kahneman, D. (1975) · Utility, Probability, and Human Decision Making · doi:10.1007/978-94-010-1834-0_8 · Cited by 22,650
(2011) · Cited by 14,317
Data Analysis Using Regression and Multilevel/Hierarchical Models
Gelman, A., & Hill, J. (2006) · doi:10.1017/cbo9780511790942 · Cited by 13,597
Random-Effects Models for Longitudinal Data
Laird, N. M., & Ware, J. H. (1982) · Biometrics · doi:10.2307/2529876 · Cited by 8,923 · cited 1×
“orate within-country correlation. The models were fitted using the “lme” procedure in the “nlme” package in R software. This function fits a linear mixed-effects model in the formulation described in Laird and Ware (1982) but allowing for nested random effects. The withingroup errors are allowed to be correlated and/o…”
Method(2006) · Technometrics · doi:10.1198/tech.2006.s417 · Cited by 4,950
Heuristics and Biases: The Psychology of Intuitive Judgment
Bottom, W. P., Gilovich, T., Griffin, D., & Kahneman, D. (2004) · The Academy of Management Review · doi:10.2307/20159081 · Cited by 3,536
Fragmentation and Flow Regulation of the World's Large River Systems
Nilsson, C., Reidy, C. A., Dynesius, M., & Revenga, C. (2005) · Science · doi:10.1126/science.1107887 · Cited by 3,509 · cited 2×
“Beyond the financial calculus, large dams have profound environmental (McCully, 2001; Scudder, 2005; Stone, 2011), ecological (Nilsson et al., 2005; Ziv et al., 2012), and social (Bakker, 1999; Duflo and Pande, 2007; Richter et al.”
Background
Cited by
A global boom in hydropower dam construction
Zarfl, C., Lumsdon, A. E., Berlekamp, J., Tydecks, L., & Tockner, K. (2015) · Aquatic Sciences · doi:10.1007/s00027-014-0377-0 · Cited by 2,181
“Estimated investments total about 2 trillion US$ for all future hydropower dams currently under construction or planned, assuming average construction costs of large dams at 2.8 million US$ per MW (Ansar et al. 2014).”
BackgroundMethodInfluentialBalancing hydropower and biodiversity in the Amazon, Congo, and Mekong
Winemiller, K. O., McIntyre, P. B., Castello, L., Fluet-Chouinard, E., Giarrizzo, T., Nam, S., Baird, I. G., Darwall, W., Lujan, N. K., Harrison, I., et al. (2016) · Science · doi:10.1126/science.aac7082 · Cited by 1,569
Anthropogenic stresses on the world’s big rivers
Best, J. (2019) · Nature Geoscience · doi:10.1038/s41561-018-0262-x · Cited by 1,315
River dam impacts on biogeochemical cycling
Maavara, T., Chen, Q., Van Meter, K., Brown, L. E., Zhang, J., Ni, J., & Zarfl, C. (2020) · Nature Reviews Earth & Environment · doi:10.1038/s43017-019-0019-0 · Cited by 839
Damming the rivers of the Amazon basin
Latrubesse, E. M., Arima, E. Y., Dunne, T., Park, E., Baker, V. R., d’Horta, F. M., Wight, C., Wittmann, F., Zuanon, J., Baker, P. A., et al. (2017) · Nature · doi:10.1038/nature22333 · Cited by 838
Self-citationKirchherr, J., & Charles, K. (2018) · PLOS ONE · doi:10.1371/journal.pone.0201710 · Cited by 748
Sustainable hydropower in the 21st century
Moran, E. F., Lopez, M. C., Moore, N., Müller, N., & Hyndman, D. W. (2018) · Proceedings of the National Academy of Sciences · doi:10.1073/pnas.1809426115 · Cited by 693
Kuriqi, A., Pinheiro, A. N., Sordo-Ward, A., Bejarano, M. D., & Garrote, L. (2021) · Renewable and Sustainable Energy Reviews · doi:10.1016/j.rser.2021.110833 · Cited by 555
Sustainable water management under future uncertainty with eco-engineering decision scaling
Poff, N. L., Brown, C. M., Grantham, T. E., Matthews, J. H., Palmer, M. A., Spence, C. M., Wilby, R. L., Haasnoot, M., Mendoza, G. F., Dominique, K. C., et al. (2016) · Nature Climate Change · doi:10.1038/nclimate2765 · Cited by 520
Water shortages worsened by reservoir effects
Di Baldassarre, G., Wanders, N., AghaKouchak, A., Kuil, L., Rangecroft, S., Veldkamp, T. I. E., Garcia, M., van Oel, P. R., Breinl, K., & Van Loon, A. F. (2018) · Nature Sustainability · doi:10.1038/s41893-018-0159-0 · Cited by 504
Global proliferation of small hydropower plants – science and policy
Couto, T. B., & Olden, J. D. (2018) · Frontiers in Ecology and the Environment · doi:10.1002/fee.1746 · Cited by 398
Hydropower and the future of Amazonian biodiversity
Lees, A. C., Peres, C. A., Fearnside, P. M., Schneider, M., & Zuanon, J. A. S. (2016) · Biodiversity and Conservation · doi:10.1007/s10531-016-1072-3 · Cited by 372
“However, the pattern for dam construction in Brazil and throughout the world is one of massive cost overruns and systematic delays in project completion, as shown by a recent world-wide review of hundreds of dams (Ansar et al. 2014).”
BackgroundDoes infrastructure investment lead to economic growth or economic fragility? Evidence from China
Ansar, A., Flyvbjerg, B., Budzier, A., & Lunn, D. (2016) · Oxford Review of Economic Policy · doi:10.1093/oxrep/grw022 · Cited by 351
Self-citationMac Kinnon, M. A., Brouwer, J., & Samuelsen, S. (2018) · Progress in Energy and Combustion Science · doi:10.1016/j.pecs.2017.10.002 · Cited by 310
Changes in short term river flow regulation and hydropeaking in Nordic rivers
Ashraf, F. B., Haghighi, A. T., Riml, J., Alfredsen, K., Koskela, J. J., Kløve, B., & Marttila, H. (2018) · Scientific Reports · doi:10.1038/s41598-018-35406-3 · Cited by 276
Fearnside, P. M. (2016) · World Development · doi:10.1016/j.worlddev.2015.08.015 · Cited by 274
Economic, Socio-Political and Environmental Risks of Road Development in the Tropics
Alamgir, M., Campbell, M. J., Sloan, S., Goosem, M., Clements, G. R., Mahmoud, M. I., & Laurance, W. F. (2017) · Current Biology · doi:10.1016/j.cub.2017.08.067 · Cited by 269
Denicol, J., Davies, A., & Krystallis, I. (2020) · Project Management Journal · doi:10.1177/8756972819896113 · Cited by 266
Giuliani, M., Castelletti, A., Pianosi, F., Mason, E., & Reed, P. M. (2016) · Journal of Water Resources Planning and Management · doi:10.1061/(asce)wr.1943-5452.0000570 · Cited by 257
Path dependence in energy systems and economic development
Fouquet, R. (2016) · Nature Energy · doi:10.1038/nenergy.2016.98 · Cited by 248
Widespread Forest Vertebrate Extinctions Induced by a Mega Hydroelectric Dam in Lowland Amazonia
Benchimol, M., & Peres, C. A. (2015) · PLOS ONE · doi:10.1371/journal.pone.0129818 · Cited by 212
“From China to Brazil, hydroelectric dams have been built at an unprecedented scale to supply burgeoning energy demands [6].”
BackgroundTop Ten Behavioral Biases in Project Management: An Overview
Flyvbjerg, B. (2021) · Project Management Journal · doi:10.1177/87569728211049046 · Cited by 203
Self-citationBeyond the concrete: Accounting for ecosystem services from free-flowing rivers
A. Auerbach, D., B. Deisenroth, D., McShane, R. R., McCluney, K. E., & LeRoy Poff, N. (2014) · Ecosystem Services · doi:10.1016/j.ecoser.2014.07.005 · Cited by 114
“Amidst the growing number of major river restoration projects and the resurgent interest in large dam construction, a pressing need has arisen for research to adequately quantify the costs for decommissioning and ecosystem rehabilitation (Bernhardt and Palmer 2011; Ansar et al., 2014).”
BackgroundQUANTITATIVE RISK ASSESSMENT OF MEGA REAL ESTATE PROJECTS: A MONTE CARLO SIMULATION APPROACH
Chief Executive Officer (CEO), G. H. L. (. G., & Jahid, M. S. R. (2022) · Journal of Sustainable Development and Policy · doi:10.63125/nh269421 · Cited by 3
Metadata
- Authors
- Ansar, A., Flyvbjerg, B., Budzier, A., & Lunn, D.
- Venue
- Energy Policy
- Publisher
- Elsevier BV
- Published
- 2014-06
- Volume
- 69
- Pages
- 43-56
- ISSN
- 2331-8422 (ISSN-L)
- 0301-4215
- OpenAlex
- W3123521572
- Cited by
- 733
- References
- 42
- Type
- posted content
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.