QUANTITATIVE RISK ASSESSMENT OF MEGA REAL ESTATE PROJECTS: A MONTE CARLO SIMULATION APPROACH

Open access
Chief Executive Officer (CEO), GM Holdings Limited (Deshbandhu Group), Dhaka, Bangladesh, Jahid, MKA Shahinoor Rahman·2022·Journal of Sustainable Development and Policy

Abstract

This systematic literature review synthesizes how Monte Carlo simulation is designed, implemented, and interpreted for quantitative risk assessment in mega real estate projects. Following a PRISMA-aligned protocol, we searched Scopus, Web of Science, ASCE Library, ScienceDirect, IEEE Xplore, and Emerald Insight, complemented by Taylor & Francis Online and snowballing, screened records in two stages, and extracted standardized methodological variables. The final sample comprises 115 studies, analyzed across four decision-shaping themes: input distributions, dependence modeling, sampling discipline, and integration of cost, schedule, and finance. Most studies adopt triangular or PERT-style inputs, with lognormal alternatives common, while heavy-tailed forms remain underused despite escalation and long-lead exposures. Explicit dependence is unevenly treated, many models assume independence, whereas rank correlation, common drivers, or copulas reveal wider tails. Latin hypercube sampling dominates, quasi Monte Carlo appears in a minority, and only a subset justifies run size against precision targets. Where models link schedule to cost and propagate into cash flow and financing metrics such as debt service coverage ratio, credible bands widen and breach probabilities rise, improving alignment with lender and board thresholds. Sensitivity analysis is frequent yet mixed in rigor, with global and tail-focused measures offering clearer mitigation leverage than tornado charts, and validation by hindcasting or exceedance tests remains rare but decisive for credibility. We conclude that governance-ready practice requires tail-aware input fitting, co-movement, variance-efficient designs with accuracy goals, integrated cost, schedule, and finance modeling, and transparent sensitivity and validation protocols that yield auditable percentile contingencies and covenant risk statements for stage-gate decisions.

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.63125/nh269421

Cites

2 of 2 references verified0 citation errors · 0 not checkable

Statistics

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

  • Over 60 percent of industrial cyber intrusions exploit insecure OT protocols and unauthorized remote access services.

    “International cybersecurity incident reports indicate that over 60 percent of industrial cyber intrusions exploit insecure OT protocols and unauthorized remote access services (Jahid, 2022)”

    From ADAPTING PLC/SCADA SYSTEMS TO MITIGATE INDUSTRIAL IOT CYBERSECURITY RISKS IN GLOBAL MANUFACTURING (2024) · cites this paper as Jahid, 2022

    The Data Synthesis and Analytical Approach section discusses cost, schedule, and financing risks in real estate projects, not industrial cyber intrusions. Searches for OT protocols, unauthorized remote access, and the claimed 60-percent figure found no passage addressing the claim; the cybersecurity-related reference entry does not establish it. (LLM, conf=0.76)

    Experimental — accuracy not yet measured

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Cites

Flagged first, then by citations

Research works printed but not linked: 125

  1. Aas, K., Czado, C., Frigessi, A., & Bakken, H. (2009). Pair-copula constructions of multiple dependence. Insurance: Mathematics and Economics, 44(2), 182-198. https://doi.org/10.1016/j.insmatheco.2007.02.001 · DOI
  2. AbouRizk, S. (2010). Role of simulation in construction engineering and management. Journal of Construction Engineering and Management, 136(10), 1140-1153. https://doi.org/10.1061/(asce)co.1943-7862.0000220 · DOI
  3. Akaike, H. (1974). A new look at the statistical model identification. IEEE Transactions on Automatic Control, 19(6), 716-723. https://doi.org/10.1109/tac.1974.1100705 · DOI · Paper page
  4. Akintoye, A. S., & MacLeod, M. J. (1997). Risk analysis and management in construction. International Journal of Project Management, 15(1), 31-38. https://doi.org/10.1016/s0263-7863(96)00035-5 · DOI
  5. Anderson, T. W., & Darling, D. A. (1954). A test of goodness of fit. Journal of the American Statistical Association, 49(268), 765-769. https://doi.org/10.1080/01621459.1954.10501232 · DOI · Paper page
  6. Ansar, A., Flyvbjerg, B., Budzier, A., & Lunn, D. (2014). Should we build more large dams? The actual costs of hydropower megaproject development. Energy Policy, 69, 43-56. https://doi.org/10.1016/j.enpol.2013.10.069 · DOI
  7. Artzner, P., Delbaen, F., Eber, J.-M., & Heath, D. (1999). Coherent measures of risk. Mathematical Finance, 9(3), 203-228. https://doi.org/10.1111/1467-9965.00068 · DOI
  8. Baccarini, D. (1996). The concept of project complexity-A review. International Journal of Project Management, 14(4), 201-204. https://doi.org/10.1016/0263-7863(95)00093-3 · DOI
  9. Barañano, A., De La Peña, J. I., & Moreno, R. (2020). Valuation of real-estate losses via Monte Carlo simulation. Economic Research-Ekonomska Istraživanja, 33(1), 1867-1888. https://doi.org/10.1080/1331677x.2020.1756372 · DOI
  10. Bedford, T., & Cooke, R. M. (2002). Vines-A new graphical model for dependent random variables. Annals of Statistics, 30(4), 1031-1068. https://doi.org/10.1214/aos/1031689016 · DOI
  11. Berkowitz, J. (2001). Testing density forecasts, with applications to risk management. Journal of Business & Economic Statistics, 19(4), 465-474. https://doi.org/10.1198/07350010152596659 · DOI
  12. Bing, L., Akintoye, A., Edwards, P. J., & Hardcastle, C. (2005). The allocation of risk in PPP/PFI construction projects in the UK. International Journal of Project Management, 23(1), 25-35. https://doi.org/10.1016/j.ijproman.2004.04.006 · DOI
  13. Borgonovo, E. (2006). Measuring uncertainty importance: Investigation and comparison of alternative approaches. Risk Analysis, 26(5), 1349-1361. https://doi.org/10.1111/j.1539-6924.2006.00806.x · DOI
  14. Caflisch, R. E. (1998). Monte Carlo and quasi-Monte Carlo methods. Acta Numerica, 7, 1-49. https://doi.org/10.1017/s0962492900002804 · DOI
  15. Campolongo, F., Cariboni, J., & Saltelli, A. (2007). An effective screening design for sensitivity analysis of large models. Environmental Modelling & Software, 22(10), 1509-1518. https://doi.org/10.1016/j.envsoft.2006.10.004 · DOI
  16. Cantarelli, C. C., Flyvbjerg, B., Molin, E. J. E., & van Wee, B. (2010). Cost overruns in large-scale transportation infrastructure projects: Explanations and their theoretical embeddedness. European Journal of Transport and Infrastructure Research, 10(1). https://doi.org/10.18757/ejtir.2010.10.1.2864 · DOI
  17. Capozza, D. R., & Li, Y. (2002). Optimal land development decisions. Real Estate Economics, 30(3), 317- 339. https://doi.org/10.1111/1540-6229.00049 · DOI
  18. Chou, J.-S. (2011). Cost simulation in an item-based project involving construction engineering and management. International Journal of Project Management, 29(6), 706-717. https://doi.org/10.1016/j.ijproman.2010.07.010 · DOI
  19. Christoffersen, P. F. (1998). Evaluating interval forecasts. International Economic Review, 39(4), 841-862. https://doi.org/10.2307/2527341 · DOI
  20. Clauset, A., Shalizi, C. R., & Newman, M. E. J. (2009). Power-law distributions in empirical data. SIAM Review, 51(4), 661-703. https://doi.org/10.1137/070710111 · DOI · Paper page
  21. Coles, S., Heffernan, J., & Tawn, J. (1999). Dependence measures for extreme value analyses. Extremes, 2, 339-365. https://doi.org/10.1023/a:1009963131610 · DOI
  22. Cooke, R. M., & Goossens, L. H. J. (2008). TU Delft expert judgment data base: Methodology, results and validation. Reliability Engineering & System Safety, 93(5), 657-674. https://doi.org/10.1016/j.ress.2007.03.005 · DOI
  23. Cranley, R., & Patterson, T. N. L. (1976). Randomization of number theoretic methods for multiple integration. Mathematics of Computation, 24(109), 323-335. https://doi.org/10.1090/s0025-5718-1976- 0425837-1 · DOI
  24. Del Caño, A., & de la Cruz, M. P. (2002). Integrated methodology for project risk management. Journal of Construction Engineering and Management, 128(6), 473-485. https://doi.org/10.1061/(asce)0733- 9364(2002)128:6(473) · DOI
  25. Demarta, S., & McNeil, A. J. (2005). The t copula and related copulas. International Statistical Review, 73(1), 111-129. https://doi.org/10.1111/j.1751-5823.2005.tb00254.x · DOI
  26. Der Kiureghian, A., & Ditlevsen, O. (2009). Aleatory or epistemic? Does it matter? Structural Safety, 31(2), 105-112. https://doi.org/10.1016/j.strusafe.2008.06.020 · DOI · Paper page
  27. Diebold, F. X., Gunther, T. A., & Tay, A. S. (1998). Evaluating density forecasts with applications to financial risk management. International Economic Review, 39(4), 863-883. https://doi.org/10.2307/2527343 · DOI
  28. Diebold, F. X., & Mariano, R. S. (1995). Comparing predictive accuracy. Journal of Business & Economic Statistics, 13(3), 253-263. https://doi.org/10.1080/07350015.1995.10524599 · DOI
  29. Efron, B. (1979). Bootstrap methods: Another look at the jackknife. The Annals of Statistics, 7(1), 1-26. https://doi.org/10.1214/aos/1176344552 · DOI · Paper page
  30. Engle, R. F., & Manganelli, S. (2004). CAViaR: Conditional autoregressive value at risk by regression quantiles. Journal of Business & Economic Statistics, 22(4), 367-381. https://doi.org/10.1198/073500104000000370 · DOI
  31. Fainstein, S. S. (2008). Mega-projects in New York, London and Amsterdam. International Journal of Urban and Regional Research, 32(4), 768-785. https://doi.org/10.1111/j.1468-2427.2008.00826.x · DOI
  32. Ferson, S., & Ginzburg, L. (1996). Different methods are needed to propagate ignorance and variability. Reliability Engineering & System Safety, 54(2-3), 133-144. https://doi.org/10.1016/s0951-8320(96)00071-3 · DOI
  33. Flyvbjerg, B. (2014). What you should know about megaprojects and why: An overview. Project Management Journal, 45(2), 6-21. https://doi.org/10.1002/pmj.21409 · DOI
  34. Flyvbjerg, B., Skamris Holm, M. K., & Buhl, S. L. (2004). What causes cost overrun in transport infrastructure projects? Transport Reviews, 24(1), 3-18. https://doi.org/10.1080/0144164032000080494 · DOI
  35. Gellert, P. K., & Lynch, B. D. (2003). Mega-projects as displacements. International Social Science Journal, 55(175), 15-25. https://doi.org/10.1111/1468-2451.5501002 · DOI
  36. Genest, C., & Favre, A.-C. (2007). Everything you always wanted to know about copula modeling but were afraid to ask. Journal of Hydrologic Engineering, 12(4), 347-368. https://doi.org/10.1061/(asce)1084-0699(2007)12:4(347) · DOI
  37. Gentle, J. E. (2003). Random Number Generation and Monte Carlo Methods (2nd ed.). Springer. https://doi.org/10.1007/978-0-387-21606-0 · DOI
  38. Ghosh, S., & Jintanapakanont, J. (2004). Identifying and assessing the critical risk factors in an underground rail project in Thailand: A factor analysis approach. International Journal of Project Management, 22(8), 633-643. https://doi.org/10.1016/j.ijproman.2004.05.004 · DOI
  39. Gidado, K. I. (1996). Project complexity: The focal point of construction production planning. Construction Management and Economics, 14(3), 213-225. https://doi.org/10.1080/014461996373476 · DOI
  40. Giezen, M. (2012). Keeping it simple? A case study into the advantages and disadvantages of reducing complexity in mega project planning. International Journal of Project Management, 30(7), 781-790. https://doi.org/10.1016/j.ijproman.2012.03.001 · DOI
  41. Gimpelevich, D. (2011). Monte Carlo simulation of real estate investment risk. Journal of Property Investment & Finance, 29(2), 198-209. https://doi.org/10.1108/14635781111150319 · DOI
  42. Glasserman, P. (2003). Monte Carlo Methods in Financial Engineering. Springer. https://doi.org/10.1007/978-0-387-21617-6 · DOI
  43. Glynn, P. W., & Iglehart, D. L. (1989). Importance sampling for stochastic simulations. Management Science, 35(11), 1367-1392. https://doi.org/10.1287/mnsc.35.11.1367 · DOI
  44. Gneiting, T., & Raftery, A. E. (2007). Strictly proper scoring rules, prediction, and estimation. Journal of the American Statistical Association, 102(477), 359-378. https://doi.org/10.1198/016214506000001437 · DOI · Paper page
  45. Grenadier, S. R. (1996). The strategic exercise of options: Development cascades and overbuilding in real estate markets. The Review of Financial Studies, 9(2), 391-426. https://doi.org/10.1093/rfs/9.2.387 · DOI
  46. Helton, J. C., & Davis, F. J. (2003). Latin hypercube sampling and the propagation of uncertainty in analyses of complex systems. Reliability Engineering & System Safety, 81(1), 23-69. https://doi.org/10.1016/s0951-8320(03)00058-9 · DOI
  47. Helton, J. C., Johnson, J. D., Sallaberry, C. J., & Storlie, C. B. (2006). Survey of sampling-based methods for uncertainty and sensitivity analysis. Reliability Engineering & System Safety, 91(10-11), 1175-1209. https://doi.org/10.1016/j.ress.2005.11.017 · DOI
  48. Hickernell, F. J. (1998). A generalized discrepancy and quadrature error bounds. Mathematics of Computation, 67(221), 299-322. https://doi.org/10.1090/s0025-5718-98-01071-5 · DOI
  49. Hoeting, J. A., Madigan, D., Raftery, A. E., & Volinsky, C. T. (1999). Bayesian model averaging: A tutorial. Statistical Science, 14(4), 382-401. https://doi.org/10.1214/ss/1009212519 · DOI · Paper page
  50. Homma, T., & Saltelli, A. (1996). Importance measures in global sensitivity analysis. Reliability Engineering & System Safety, 52(1), 1-17. https://doi.org/10.1016/0951-8320(96)00002-6 · DOI
  51. Hulett, D. T. (2009). Practical Schedule Risk Analysis. Routledge. https://doi.org/10.4324/9781315601885 · DOI
  52. Iman, R. L., & Conover, W. J. (1982). A distribution-free approach to inducing rank correlation among input variables. Technometrics, 22(3), 311-334. https://doi.org/10.1080/00401706.1982.10487711 · DOI
  53. Jahid, M. K. A. S. R. (2022). Empirical Analysis of The Economic Impact Of Private Economic Zones On Regional GDP Growth: A Data-Driven Case Study Of Sirajganj Economic Zone. American Journal of Scholarly Research and Innovation, 1(02), 01-29. https://doi.org/10.63125/je9w1c40 · DOI
  54. Kahneman, D., & Tversky, A. (1979). Prospect theory: An analysis of decision under risk. Econometrica, 47(2), 263-291. https://doi.org/10.2307/1914185 · DOI · Paper page
  55. Kaplan, S., & Garrick, B. J. (1981). On the quantitative definition of risk. Risk Analysis, 1(1), 11-27. https://doi.org/10.1111/j.1539-6924.1981.tb01350.x · DOI · Paper page
  56. Ke, Y., Wang, S. Q., Chan, A. P. C., & Lam, P. T. I. (2010). Preferred risk allocation in China's public-private partnership (PPP) projects. International Journal of Project Management, 28(5), 482-492. https://doi.org/10.1016/j.ijproman.2009.08.007 · DOI
  57. Khamooshi, H., & Golafshani, H. (2014). EDM: Earned Duration Management, a new approach to schedule performance management and measurement. International Journal of Project Management, 32(6), 1019-1041. https://doi.org/10.1016/j.ijproman.2013.11.002 · DOI
  58. Kim, G., Silvapulle, M. J., & Silvapulle, P. (2007). Comparison of semiparametric and parametric methods for estimating copulas. Computational Statistics & Data Analysis, 51(6), 2836-2850. https://doi.org/10.1016/j.csda.2006.05.016 · DOI
  59. Kleijnen, J. P. C. (1997). Sensitivity analysis and related analyses: A review of some statistical techniques. European Journal of Operational Research, 99(1), 114-129. https://doi.org/10.1016/s0377- 2217(96)00354-x · DOI
  60. Koenker, R., & Bassett, G., Jr. (1978). Regression quantiles. Econometrica, 46(1), 33-50. https://doi.org/10.2307/1913643 · DOI
  61. Kucherenko, S., Tarantola, S., & Annoni, P. (2012). Estimation of total sensitivity indices from a very small sample. Computer Physics Communications, 183(4), 937-946. https://doi.org/10.1016/j.cpc.2011.12.020 · DOI
  62. Kupiec, P. H. (1995). Techniques for verifying the accuracy of risk measurement models. The Journal of Derivatives, 3(2), 73-84. https://doi.org/10.3905/jod.1995.407942 · DOI
  63. L'Ecuyer, P., & Lemieux, C. (2002). Variance reduction via lattice stratification. Management Science, 48(6), 734-753. https://doi.org/10.1287/mnsc.48.6.734 · DOI
  64. Lehrer, U., & Laidley, J. (2008). Old mega-projects, newly packaged? Waterfront redevelopment in Toronto. International Journal of Urban and Regional Research, 32(4), 786-803. https://doi.org/10.1111/j.1468-2427.2008.00830.x · DOI
  65. Li, D. X. (2000). On default correlation: A copula function approach. The Journal of Fixed Income, 9(4), 43-54. https://doi.org/10.3905/jfi.2000.319253 · DOI
  66. Loizou, P., & French, N. (2012). Monte Carlo simulations for real estate valuation. Journal of Property Investment & Finance, 30(2), 160-173. https://doi.org/10.1108/14635781211206922 · DOI
  67. Longin, F., & Solnik, B. (2001). Extreme correlation of international equity markets. The Journal of Finance, 56(2), 649-676. https://doi.org/10.1111/0022-1082.00340 · DOI
  68. Love, P. E. D., Ahiaga-Dagbui, D. D., & Irani, Z. (2016). Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation. Transportation Research Part A, 92, 184-194. https://doi.org/10.1016/j.tra.2016.06.004 · DOI
  69. Mackie, P., & Preston, J. (1998). Twenty-one sources of error and bias in transport project appraisal. Transport Policy, 5(1), 1-7. https://doi.org/10.1016/s0967-070x(98)00004-3 · DOI
  70. Mahalingam, A., & Levitt, R. E. (2007). Institutional theory as a framework for analyzing conflicts on global projects. Journal of Construction Engineering and Management, 133(7), 517-528. https://doi.org/10.1061/(asce)0733-9364(2007)133:7(517) · DOI
  71. Mak, S., & Picken, D. (2000). Using risk analysis to determine construction project contingencies. Journal of Construction Engineering and Management, 126(2), 130-136. https://doi.org/10.1061/(asce)0733- 9364(2000)126:2(130) · DOI
  72. McKay, M. D., Beckman, R. J., & Conover, W. J. (1979). A comparison of three methods for selecting values of input variables in the analysis of output from a computer code. Technometrics, 21(2), 239-245. https://doi.org/10.1080/00401706.1979.10489755 · DOI
  73. Md Arifur, R., & Sheratun Noor, J. (2022). A Systematic Literature Review of User-Centric Design In Digital Business Systems: Enhancing Accessibility, Adoption, And Organizational Impact. Review of Applied Science and Technology, 1(04), 01-25. https://doi.org/10.63125/ndjkpm77 · DOI
  74. Md Hasan, Z., & Moin Uddin, M. (2022). Evaluating Agile Business Analysis in Post-Covid Recovery A Comparative Study On Financial Resilience. American Journal of Advanced Technology and Engineering Solutions, 2(03), 01-28. https://doi.org/10.63125/6nee1m28 · DOI
  75. Md Mahamudur Rahaman, S. (2022). Electrical And Mechanical Troubleshooting in Medical And Diagnostic Device Manufacturing: A Systematic Review Of Industry Safety And Performance Protocols. American Journal of Scholarly Research and Innovation, 1(01), 295-318. https://doi.org/10.63125/d68y3590 · DOI
  76. Md Mahamudur Rahaman, S., & Rezwanul Ashraf, R. (2022). Integration of PLC And Smart Diagnostics in Predictive Maintenance of CT Tube Manufacturing Systems. International Journal of Scientific Interdisciplinary Research, 1(01), 62-96. https://doi.org/10.63125/gspb0f75 · DOI
  77. Md Nazrul Islam, K. (2022). A Systematic Review of Legal Technology Adoption In Contract Management, Data Governance, And Compliance Monitoring. American Journal of Interdisciplinary Studies, 3(01), 01-30. https://doi.org/10.63125/caangg06 · DOI
  78. Md Nur Hasan, M., Md Musfiqur, R., & Debashish, G. (2022). Strategic Decision-Making in Digital Retail Supply Chains: Harnessing AI-Driven Business Intelligence From Customer Data. Review of Applied Science and Technology, 1(03), 01-31. https://doi.org/10.63125/6a7rpy62 · DOI
  79. Md Redwanul, I., & Md. Zafor, I. (2022). Impact of Predictive Data Modeling on Business Decision- Making: A Review Of Studies Across Retail, Finance, And Logistics. American Journal of Advanced Technology and Engineering Solutions, 2(02), 33-62. https://doi.org/10.63125/8hfbkt70 · DOI
  80. Md Rezaul, K., & Md Mesbaul, H. (2022). Innovative Textile Recycling and Upcycling Technologies For Circular Fashion: Reducing Landfill Waste And Enhancing Environmental Sustainability. American Journal of Interdisciplinary Studies, 3(03), 01-35. https://doi.org/10.63125/kkmerg16 · DOI
  81. Md. Sakib Hasan, H. (2022). Quantitative Risk Assessment of Rail Infrastructure Projects Using Monte Carlo Simulation And Fuzzy Logic. American Journal of Advanced Technology and Engineering Solutions, 2(01), 55-87. https://doi.org/10.63125/h24n6z92 · DOI
  82. Md. Tarek, H. (2022). Graph Neural Network Models For Detecting Fraudulent Insurance Claims In Healthcare Systems. American Journal of Advanced Technology and Engineering Solutions, 2(01), 88- 109. https://doi.org/10.63125/r5vsmv21 · DOI
  83. Md.Kamrul, K., & Md Omar, F. (2022). Machine Learning-Enhanced Statistical Inference For Cyberattack Detection On Network Systems. American Journal of Advanced Technology and Engineering Solutions, 2(04), 65-90. https://doi.org/10.63125/sw7jzx60 · DOI
  84. Md.Kamrul, K., & Md. Tarek, H. (2022). A Poisson Regression Approach to Modeling Traffic Accident Frequency in Urban Areas. American Journal of Interdisciplinary Studies, 3(04), 117-156. https://doi.org/10.63125/wqh7pd07 · DOI
  85. Metropolis, N., & Ulam, S. (1949). The Monte Carlo method. Journal of the American Statistical Association, 44(247), 335-341. https://doi.org/10.1080/01621459.1949.10483310 · DOI · Paper page
  86. Miller, R., & Lessard, D. R. (2000). The Strategic Management of Large Engineering Projects. MIT Press. https://doi.org/10.7551/mitpress/4100.001.0001 · DOI
  87. Morris, M. D. (1991). Factorial sampling plans for preliminary computational experiments. Technometrics, 33(2), 161-174. https://doi.org/10.1080/00401706.1991.10484804 · DOI · Paper page
  88. Mubashir, I., & Abdul, R. (2022). Cost-Benefit Analysis in Pre-Construction Planning: The Assessment Of Economic Impact In Government Infrastructure Projects. American Journal of Advanced Technology and Engineering Solutions, 2(04), 91-122. https://doi.org/10.63125/kjwd5e33 · DOI
  89. Niederreiter, H. (1992). Random Number Generation and Quasi-Monte Carlo Methods. SIAM. https://doi.org/10.1137/1.9780898713470 · DOI
  90. Odeck, J. (2004). Cost overruns in road construction-What are their sizes and determinants? Transportation Research Part E, 40(1), 43-64. https://doi.org/10.1016/j.tre.2003.10.003 · DOI
  91. Olander, S., & Landin, A. (2005). Evaluation of stakeholder influence in the implementation of construction projects. International Journal of Project Management, 23(4), 321-328. https://doi.org/10.1016/j.ijproman.2005.02.002 · DOI
  92. Omar Muhammad, F., & Md.Kamrul, K. (2022). Blockchain-Enabled BI For HR And Payroll Systems: Securing Sensitive Workforce Data. American Journal of Scholarly Research and Innovation, 1(02), 30- 58. https://doi.org/10.63125/et4bhy15 · DOI
  93. Orueta, F. D., & Fainstein, S. S. (2008). The new mega-projects: Genesis and impacts. International Journal of Urban and Regional Research, 32(4), 759-767. https://doi.org/10.1111/j.1468- 2427.2008.00829.x · DOI
  94. Owen, A. B. (1997). Scrambled net variance for integrals of smooth functions. The Annals of Statistics, 25(4), 1541-1562. https://doi.org/10.1214/aos/1031594724 · DOI
  95. Owen, A. B. (2008). Latin supercube sampling for very high-dimensional simulations. ACM Transactions on Modeling and Computer Simulation, 18(3), 1-17. https://doi.org/10.1145/1462173.1462176 · DOI
  96. Paté-Cornell, M. E. (1996). Uncertainties in risk analysis: Six levels of treatment. Reliability Engineering & System Safety, 54(2-3), 95-111. https://doi.org/10.1016/s0951-8320(96)00067-1 · DOI
  97. Patton, A. J. (2006). Modelling asymmetric exchange rate dependence. International Economic Review, 47(2), 527-556. https://doi.org/10.1111/j.1468-2354.2006.00387.x · DOI
  98. Pianosi, F., Sarrazin, F., & Wagener, T. (2015). A MATLAB toolbox for global sensitivity analysis of environmental models. Environmental Modelling & Software, 70, 80-85. https://doi.org/10.1016/j.envsoft.2015.04.013 · DOI
  99. Pich, M. T., Loch, C. H., & De Meyer, A. (2002). On uncertainty, ambiguity, and complexity in project management. Management Science, 48(8), 1008-1023. https://doi.org/10.1287/mnsc.48.8.1008 · DOI
  100. Poon, S.-H., Rockinger, M., & Tawn, J. (2004). Extreme value dependence in financial markets: Diagnostics, models, and financial implications. Review of Financial Studies, 17(2), 581-610. https://doi.org/10.1093/rfs/hhg058 · DOI
  101. Reduanul, H., & Mohammad Shoeb, A. (2022). Advancing AI in Marketing Through Cross Border Integration Ethical Considerations And Policy Implications. American Journal of Scholarly Research and Innovation, 1(01), 351-379. https://doi.org/10.63125/d1xg3784 · DOI · Paper page
  102. Rockafellar, R. T., & Uryasev, S. (2002). Conditional value-at-risk for general loss distributions. Journal of Banking & Finance, 26(7), 1443-1471. https://doi.org/10.1016/s0378-4266(02)00271-6 · DOI
  103. Roy, A. D. (1952). Safety first and the holding of assets. Econometrica, 20(3), 431-449. https://doi.org/10.2307/1907413 · DOI
  104. Sabuj Kumar, S., & Zobayer, E. (2022). Comparative Analysis of Petroleum Infrastructure Projects In South Asia And The Us Using Advanced Gas Turbine Engine Technologies For Cross Integration. American Journal of Advanced Technology and Engineering Solutions, 2(04), 123-147. https://doi.org/10.63125/wr93s247 · DOI
  105. Sadia, T., & Shaiful, M. (2022). In Silico Evaluation of Phytochemicals From Mangifera Indica Against Type 2 Diabetes Targets: A Molecular Docking And Admet Study. American Journal of Interdisciplinary Studies, 3(04), 91-116. https://doi.org/10.63125/anaf6b94 · DOI
  106. Saltelli, A. (2002). Making best use of model evaluations to compute sensitivity indices. Computer Physics Communications, 145(2), 280-297. https://doi.org/10.1016/s0010-4655(02)00280-1 · DOI · Paper page
  107. Saltelli, A., & Annoni, P. (2010). How to avoid a perfunctory sensitivity analysis. Environmental Modelling & Software, 25(12), 1508-1517. https://doi.org/10.1016/j.envsoft.2009.09.015 · DOI
  108. Saltelli, A., Ratto, M., Andres, T., Campolongo, F., Cariboni, J., Gatelli, D., & Tarantola, S. (2008). Global Sensitivity Analysis: The Primer. Wiley. https://doi.org/10.1002/9780470725180 · DOI
  109. Saltelli, A., Tarantola, S., Campolongo, F., & Ratto, M. (2004). Sensitivity Analysis in Practice: A Guide to Assessing Scientific Models. Wiley. https://doi.org/10.1002/0470870958 · DOI
  110. Schwarz, G. (1978). Estimating the dimension of a model. The Annals of Statistics, 6(2), 461-464. https://doi.org/10.1214/aos/1176344136 · DOI · Paper page
  111. Shen, L. Y., Wu, G. W. C., & Ng, C. S. K. (2001). Risk assessment for construction joint ventures in China. Journal of Construction Engineering and Management, 127(1), 76-81. https://doi.org/10.1061/(asce)0733-9364(2001)127:1(76) · DOI
  112. Sheratun Noor, J., & Momena, A. (2022). Assessment Of Data-Driven Vendor Performance Evaluation in Retail Supply Chains: Analyzing Metrics, Scorecards, And Contract Management Tools. American Journal of Interdisciplinary Studies, 3(02), 36-61. https://doi.org/10.63125/0s7t1y90 · DOI
  113. Sobol', I. M. (2001). Global sensitivity indices for nonlinear mathematical models and their Monte Carlo estimates. Mathematics and Computers in Simulation, 55(1-3), 271-280. https://doi.org/10.1016/s0378- 4754(00)00270-6 · DOI · Paper page
  114. Spiegelhalter, D. J., Best, N. G., Carlin, B. P., & Van Der Linde, A. (2002). Bayesian measures of model complexity and fit. Journal of the Royal Statistical Society: Series B (Statistical Methodology), 64(4), 583- 639. https://doi.org/10.1111/1467-9868.00353 · DOI · Paper page
  115. Stein, M. (1987). Large sample properties of simulations using Latin hypercube sampling. Technometrics, 29(2), 143-151. https://doi.org/10.1080/00401706.1987.10488205 · DOI
  116. Swyngedouw, E., Moulaert, F., & Rodriguez, A. (2002). Neoliberal urbanization in Europe: Large-scale urban development projects and the new urban policy. Antipode, 34(3), 542-577. https://doi.org/10.1111/1467-8330.00254 · DOI · Paper page
  117. Tarantola, S., Gatelli, D., & Mara, T. A. (2006). Random balance designs for the estimation of first-and total-order sensitivity indices. Reliability Engineering & System Safety, 91(6), 717-727. https://doi.org/10.1016/j.ress.2005.06.003 · DOI
  118. Titman, S. (1985). Urban land prices under uncertainty. The American Economic Review, 75(3), 505-514. https://doi.org/10.2307/1814811 · DOI
  119. Touran, A. (1996). Rank correlation and simulation in construction. Journal of Construction Engineering and Management, 122(2), 130-136. https://doi.org/10.1061/(asce)0733-9364(1996)122:2(130) · DOI
  120. Touran, A., & Wiser, E. (1992). Monte Carlo technique with correlated random variables. Journal of Construction Engineering and Management, 118(2), 258-272. https://doi.org/10.1061/(asce)0733- 9364(1992)118:2(258) · DOI
  121. van Marrewijk, A., Clegg, S. R., Pitsis, T. S., & Veenswijk, M. (2008). Managing public-private megaprojects: Paradoxes, complexity and project design. International Journal of Project Management, 26(6), 591-600. https://doi.org/10.1016/j.ijproman.2007.12.002 · DOI
  122. Van Slyke, R. M. (1963). Monte Carlo methods and the PERT problem. Operations Research, 11(5), 839- 860. https://doi.org/10.1287/opre.11.5.839 · DOI
  123. Ward, S., & Chapman, C. (2003). Transforming project risk management into project uncertainty management. International Journal of Project Management, 21(2), 97-105. https://doi.org/10.1016/s0263-7863(02)00080-1 · DOI
  124. Zhang, G., & Zou, P. X. W. (2007). Fuzzy analytical hierarchy process risk assessment approach for joint venture construction projects in China. Journal of Construction Engineering and Management, 133(10), 771-779. https://doi.org/10.1061/(asce)0733-9364(2007)133:10(771) · DOI
  125. Zou, P. X. W., Zhang, G., & Wang, J. (2007). Understanding the key risks in construction projects in China. International Journal of Project Management, 25(6), 601-614. https://doi.org/10.1016/j.ijproman.2007.03.001 · DOI

Cited by

Sorted by citations

Authors
Chief Executive Officer (CEO), G. H. L. (. G., & Jahid, M. S. R.
Venue
Journal of Sustainable Development and Policy
Published
2022-04-30
Volume
01
Issue
02
Pages
01-34
OpenAlex
W7084033432
Cited by
3
References
2
Citations by year
2026: 2 · 2025: 1
FWCI
0.15
Type
journal article
Language
en
Open access
Licence
cc-by
Topics
  • Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
  • Social Sciences › Economics, Econometrics and Finance › Finance › Capital Investment and Risk Analysis
  • Physical Sciences › Engineering › Architecture › Real estate and construction management
Keywords
quantitative risk assessment, Monte Carlo simulation, input distribution, dependence modeling, copulas, Latin hypercube sampling, quasi-Monte Carlo, sensitivity analysis, model validation, debt service coverage ratio, heavy-tailed distributions

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review