The DOI matches its Crossref record; 31 of the 31 references it cites were found in a registry or an index.
Risk evaluation in failure mode and effects analysis using fuzzy weighted geometric mean
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Citations
Cites
Zadeh, L. A. (1965) · Information and Control · doi:10.1016/s0019-9958(65)90241-x · Cited by 67,855
Zadeh, L. A. (1996) · Cited by 46,960
Fuzzy Sets and Systems - Theory and Applications
Didier Dubois, A., & Prade, H. M. (1980) · Mathematics in Science and Engineering/Mathematics in science and engineering · doi:10.1016/s0076-5392(09)x6008-x · Cited by 6,418
Failure Mode and Effect Analysis: FMEA From Theory to Execution
Schneider, H., & Stamatis, D. H. (1996) · Technometrics · doi:10.1080/00401706.1996.10484424 · Cited by 1,497
A procedure for ordering fuzzy subsets of the unit interval
Yager, R. R. (1981) · Information Sciences · doi:10.1016/0020-0255(81)90017-7 · Cited by 1,447
Fuzzy logic prioritization of failures in a system failure mode, effects and criticality analysis
Bowles, J. B., & Peláez, C. E. (1995) · Reliability Engineering & System Safety · doi:10.1016/0951-8320(95)00068-d · Cited by 687
Modified failure mode and effects analysis using approximate reasoning
Pillay, A., & Wang, J. (2003) · Reliability Engineering & System Safety · doi:10.1016/s0951-8320(02)00179-5 · Cited by 581
Fuzzy weighted averages and implementation of the extension principle
Dong, W., & Wong, F. S. (1987) · Fuzzy Sets and Systems · doi:10.1016/0165-0114(87)90163-1 · Cited by 554
Fuzzy data envelopment analysis (DEA): a possibility approach
Lertworasirikul, S., Fang, S., Joines, J. A., & Nuttle, H. L. W. (2003) · Fuzzy Sets and Systems · doi:10.1016/s0165-0114(02)00484-0 · Cited by 411
Fuzzy assessment of FMEA for engine systems
Xu, K., Tang, L. C., Xie, M., Ho, S. L., & Zhu, M. L. (2002) · Reliability Engineering & System Safety · doi:10.1016/s0951-8320(01)00101-6 · Cited by 380
Cited by
Sorted by citations
Items 401–500 of 627
Fault Statistics and Mode Analysis of Steam-Induced Vibration of Steam Turbine Based on FMEA Method
He, C., & Gu, Y. (2011) · Journal of Computers · doi:10.4304/jcp.6.10.2098-2103 · Cited by 5
Engineering Trust: A Graph-Based Algorithm for Modeling, Validating, and Evaluating Trust
Tucker, S. (2018) · IEEE International Conference on Trust, Security and Privacy in Computing and Communications (TrustCom) · doi:10.1109/trustcom/bigdatase.2018.00011 · Cited by 5
Sneak analysis and its applications in thermal systems
Yao, S., Chen, C., Xiao, M., & Jin, M.-M. (2018) · Applied Thermal Engineering · doi:10.1016/j.applthermaleng.2018.12.041 · Cited by 5
Zaman, M. B., Siswantoro, N., Priyanta, D., Pitana, T., Prastowo, H., Semin, S., & Busse, W. (2021) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/698/1/012015 · Cited by 5
INVESTIGATING THE ADVERSE IMPACTS OF RURAL ROADS USING A FUZZY MULTICRITERIA APPROACH
Tirth, V., Wagale, M., Singh, A. P., Sarkar, A. K., Singh, R. K., Algahtani, A., & Islam, S. (2021) · Journal of Civil Engineering and Management · doi:10.3846/jcem.2021.15264 · Cited by 5
Classify Purchasing Items Based on Risk and Profitability Attributes; using MCDM and FMEA Techniques
Arabzad, S. M., Razmi, J., & Ghorbani, M. (2011) · doi:10.13140/2.1.3457.0882 · Cited by 5
Mkalaf, K. A., & AL-Sabbagh, A. A. A. K. (2019) · International Conference on Industrial Technology and Management (ICITM) · doi:10.1109/icitm.2019.8710662 · Cited by 5
Advanced Analytical Methods for Risk Mitigation in Multimodal Freight Transport
Kaewfak, K., Pharino, C., & Ouppara, N. S. (2024) · Symmetry · doi:10.3390/sym16101394 · Cited by 4
Al-Hourani, S., & Hassanlou, A. (2025) · Processes · doi:10.3390/pr13103153 · Cited by 4
Resilience Integrated Failure Analysis for Hydraulic Lifting System of Deep-sea Mining
Guo, Y., Kang, Z., Sun, Y. S., Zhang, H., Liu, J., & Kang, J. (2026) · Journal of Marine Science and Application · doi:10.1007/s11804-026-00833-6 · Cited by 4
Risk assessment for apartment building maintenance using Fuzzy-FMEA methods
Reza, A., Vanany, I., & Machsus, M. (2021) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/1072/1/012001 · Cited by 4
Fuzzy FMEA in Risk Assessment of Human-Factor in Production Process
Łapczyńska, D. (2023) · Lecture notes in mechanical engineering · doi:10.1007/978-3-031-44282-7_51 · Cited by 4
Mahdi, A. M., & Erzaij, K. R. (2024) · Open Engineering · doi:10.1515/eng-2022-0513 · Cited by 4
Setiadi, M. S., Usman, K., Sebayang, S., & Kustiani, I. (2024) · Journal of Sustainable Construction · doi:10.26593/josc.v3i2.7218 · Cited by 4
An investigation of the effect of workload on ship engine room operators using fNIRS
Symes, S., Blanco‐Davis, E., Fairclough, S. H., Yang, Z., Wang, J., & Shaw, E. (2024) · Ocean Engineering · doi:10.1016/j.oceaneng.2024.118671 · Cited by 4
Tiwari, A., Kumar, S., Sharma, R. K., Mehdi, H., & Saroha, M. (2025) · International Journal on Interactive Design and Manufacturing (IJIDeM) · doi:10.1007/s12008-025-02237-2 · Cited by 4
A Belief Rule-Based Generic Risk Assessment Framework
Liu, J., Chen, S., Martínez, L. M., & Wang, H. (2013) · Atlantis computational intelligence systems · doi:10.2991/978-94-91216-74-9_7 · Cited by 4
Mirghafoori, S. H., Ardakani, F. A., & Azizi, F. (2014) · Iranian journal of management studies · doi:10.22059/ijms.2014.36620 · Cited by 4
Decision support system for the selection of advanced manufacturing technologies
Al-Ahmari, A. M., Ateekh-Ur-Rehman, & Ali, S. (2016) · Journal of Engineering Research · doi:10.1016/s2307-1877(25)00894-6 · Cited by 4
Fuzzy Logic-Based Approaches in Supply Chain Risk Management: A Review
Díaz-Curbelo, A., Municio, Á. M. G., & Andrade, R. A. E. (2021) · Studies in computational intelligence · doi:10.1007/978-3-030-73819-8_5 · Cited by 4
SRB Field Joints Failure Analysis Using Fuzzy FMEA
Jenab, K., Blecher, R. M., & Moslehpour, S. (2015) · International Journal of Physics and Astronomy · doi:10.15640/ijpa.v3n1a1 · Cited by 4
Chakhrit, A., & Chennoufi, M. (2022) · Algerian Journal of Research and Technology · doi:10.58681/ajrt.22060105 · Cited by 4
Li, S., & Zhou, W. (2014) · Frontiers in Energy · doi:10.1007/s11708-014-0336-4 · Cited by 4
Risk comprehensive evaluation of urban network planning based on fuzzy Bayesian LS_SVM
He, Y., Tao, W., Dai, A.-Y., Yang, L., Fang, R., & Li, F. (2010) · Kybernetes · doi:10.1108/03684921011043206 · Cited by 4
Automation of FMEA for computer servers using log data with grey relational analysis
Ayaz, H. İ., & Testik, M. C. (2017) · International Conference on Computer Science and Engineering (UBMK) · doi:10.1109/ubmk.2017.8093480 · Cited by 4
Supply Chain Risk Management: Conceptual Framework and a Supply-Side Literature Review
Erdal, H. (2018) · Pamukkale University Journal of Engineering Sciences · doi:10.5505/pajes.2018.50102 · Cited by 4
Yücenur, G. N., ÇATALTEPE, S., & SAKİN, İ. (2020) · Cumhuriyet Science Journal · doi:10.17776/csj.567601 · Cited by 4
Dimyati, D., Khadijah, A., & Kristiningrum, E. (2020) · AIP conference proceedings · doi:10.1063/5.0000725 · Cited by 4
Sarı, E. B. (2021) · Ege Akademik Bakis (Ege Academic Review) · doi:10.21121/eab.873999 · Cited by 4
Bir risk temelli karar verme yaklaşımı ile metalik biyomalzeme değerlendirme
Singer, H., & Özçelik, T. Ö. (2022) · Gazi Üniversitesi Mühendislik-Mimarlık Fakültesi Dergisi · doi:10.17341/gazimmfd.935288 · Cited by 4
New Quality Cost Framework (QCF) Based on the Hybrid Fuzzy MCDM Approach
Wu, Q., Xuan, J., Zhou, F., Mei, Y., & Su, J. (2022) · Computational Intelligence and Neuroscience · doi:10.1155/2022/6416989 · Cited by 4
Total failure mode and effect analysis: a powerful technique for overcoming failures
Krishnaraj, C., Mohanasundram, K. M., Devadasan, S. R., & Sivaram, N. M. (2012) · International Journal of Productivity and Quality Management · doi:10.1504/ijpqm.2012.048295 · Cited by 4
Direct centroid computation of fuzzy numbers
Han, S., Sang, X., Liu, X., & Qin, Y. (2012) · IEEE International Conference on Fuzzy Systems (FUZZ-IEEE) · doi:10.1109/fuzz-ieee.2012.6251303 · Cited by 4
Kharola, A., & Singh, S. (2014) · Cited by 4
Effective FMEA Analysis or Not?!
Jenab, K., Khoury, S., & Rodriguez, S. (2015) · Strategic Management Quarterly · doi:10.15640/smq.v3n2a2 · Cited by 4
A literature view on the application of failure mode and effects analysis in tea industry
Ebenezer, I. A., Devadasan, S. R., Sreenivasa, C. G., & Iskanius, P. (2011) · International Journal of Value Chain Management · doi:10.1504/ijvcm.2011.043229 · Cited by 4
Dandachi, E., & Osman, Y. E. (2017) · Eastern Mediterranean University Institutional Repository (Eastern Mediterranean University) · Cited by 4
Risk prioritization in enterprise supply chains: application of fuzzy analytic hierarchy process
Mukherjee, S., De, A., & Roy, S. (2025) · Business Process Management Journal · doi:10.1108/bpmj-10-2024-1003 · Cited by 3
Mohammed, A., Al-Baqami, A., Alshibani, A., Hadidi, L. A., Ghaithan, A. M., & Alabbas, A. (2025) · Journal of Modelling in Management · doi:10.1108/jm2-04-2025-0167 · Cited by 3
Enhancing risk-based engineering design: a hybrid fuzzy failure analysis with empirical validation
Ardebili, A. A., Roshany, A. S., Pourmadadkar, M., Ghodsi, M., Padoano, E., & Boscolo, M. (2026) · Frontiers in Mechanical Engineering · doi:10.3389/fmech.2025.1732819 · Cited by 3
Rohimmah, R. (2022) · J TI UNDIP JURNAL TEKNIK INDUSTRI · doi:10.14710/jati.17.2.92-101 · Cited by 3
Razzaq, A., Aized, T., Ameer, M. F., Khan, S. U., Khan, M. I., & Abdullaeva, B. S. (2024) · International Journal on Interactive Design and Manufacturing (IJIDeM) · doi:10.1007/s12008-024-01849-4 · Cited by 3
Hicham, R., Abdallah, L., & Mohamed, M. (2024) · Eng—Advances in Engineering · doi:10.3390/eng5030071 · Cited by 3
Fuzzy Based Bridge Rating System (FBRS) for Condition Assessment of Existing Railway Bridges
Patel, S. B., Srivastava, A., Pathak, K. K., & Jha, I. (2025) · International Journal of Steel Structures · doi:10.1007/s13296-025-00989-x · Cited by 3
A New Sign Distance-Based Ranking Method for Fuzzy Numbers
Chai, K. C., Tay, K. M., & Lim, C. P. (2014) · Proceedings in adaptation, learning and optimization · doi:10.1007/978-3-319-13356-0_5 · Cited by 3
OPTIMISATION OF SHOCK ABSORBER PARAMETERS USING FAILURE MODE AND EFFECT ANALYSIS AND TAGUCHI METHOD
Gandhi, R., & Senthilvelan, T. (2012) · Cited by 3
Farahani, R. Z., Roghanian, E., Tavakoli, M., & Nasir, K. (2012) · Cited by 3
Jayarullah, & Hartati, R. (2023) · Jurnal Inotera · doi:10.31572/inotera.vol8.iss1.2023.id219 · Cited by 3
Alshehhi, K., Cheaitou, A., & Rashid, H. S. (2023) · International Journal of Advanced Computer Science and Applications · doi:10.14569/ijacsa.2023.0141060 · Cited by 3
Khairansyah, M. D., Amrullah, H. N., & Qurratuláini, N. F. (2024) · Jurnal Keselamatan Kesehatan Kerja dan Lingkungan · doi:10.25077/jk3l.5.2.93-101.2024 · Cited by 3
Quality Risk Management in Pharmaceutical Dispensing Center
Chitmetha, M., Prombanpong, S., & Somboonwiwat, T. (2013) · International Journal of Chemical Engineering and Applications · doi:10.7763/ijcea.2013.v4.304 · Cited by 3
Zhou, H., Yang, Y., Huang, H., Li, Y., & Mi, J. (2018) · International Journal of Turbo and Jet Engines · doi:10.1515/tjj-2018-0003 · Cited by 3
Yücesan, M. (2020) · Elektronik Sosyal Bilimler Dergisi · doi:10.17755/esosder.569291 · Cited by 3
Nguyen, H. (2020) · IEEE International Conference on Fuzzy Systems (FUZZ-IEEE) · doi:10.1109/fuzz48607.2020.9177551 · Cited by 3
A Semi-Automatic Methodology for Making FMEA Surveys
Spreafico, C., & Russo, D. (2020) · International Journal of Mathematical Engineering and Management Sciences · doi:10.33889/ijmems.2021.6.1.007 · Cited by 3
Çıtıroğlu, H. K., Arca, D., & Can, E. (2022) · Bitlis Eren Üniversitesi Fen Bilimleri Dergisi · doi:10.17798/bitlisfen.1170909 · Cited by 3
Supplier Selection Using Adaptive Neuro-Fuzzy Inference System and Fuzzy Delphi
Abbasi, A., & Asgari, M. S. (2014) · Cited by 3
Reliability Quantitative Risk Assessment in Engineering System using Fuzzy Event Tree Analysis
Ouache, R., & Ali, A. J. A. (2014) · UMP Institutional Repository (Universiti Malaysia Pahang) · Cited by 3
Human action quality evaluation based on fuzzy logic with application in underground coal mining
Ionica, A. C., & Leba, M. (2015) · Work · doi:10.3233/wor-152012 · Cited by 3
Gan, L., Li, Y., Zhu, S., Yang, Y., & Huang, H. (2013) · International Journal of Turbo and Jet Engines · doi:10.1515/tjj-2013-0038 · Cited by 3
Septiyana, D. (2021) · J TI UNDIP JURNAL TEKNIK INDUSTRI · doi:10.14710/jati.16.3.153-160 · Cited by 3
Enright, J. M., Lewis, H. J., & Ryan, A. G. (2013) · Lecture notes in mechanical engineering · doi:10.1007/978-3-319-00557-7_16 · Cited by 3
Selvan, T. A., Jegadheesan, C., Varthanan, P. A., & Senthilkumar, K. M. (2013) · The South African Journal of Industrial Engineering · doi:10.7166/24-2-579 · Cited by 3
Aprilia, A. R., Santoso, I., & Ekasari, D. M. (2017) · AIP conference proceedings · doi:10.1063/1.4983435 · Cited by 3
A Study of Product Development Engineering and Design Reliability Concerns
Aikhuele, D. O. (2018) · International Journal of Applied Industrial Engineering · doi:10.4018/ijaie.2018010105 · Cited by 3
Yücenur, G. N., Atay, İ., Argon, S., & Gül, E. F. (2019) · International Journal of Knowledge-Based Organizations · doi:10.4018/ijkbo.2019070102 · Cited by 3
Djenadić, S., Tanasijević, M., Milisavljević, V., Ignjatović, D., & Jovančić, P. (2021) · SSRN Electronic Journal · doi:10.2139/ssrn.3945617 · Cited by 3
Research on Aircraft Control System Fault Risk Assessment Based on Composite Framework
Shi, T., Gao, Y., Xu, L., & Wang, Y. (2025) · Aerospace · doi:10.3390/aerospace12060532 · Cited by 2
Self-citationAjalli, M. (2025) · Iranian Journal of Science · doi:10.1007/s40995-025-01844-8 · Cited by 2
Caristi, G., Barilla, D., Morabito, M., & Феррара, М. (2025) · Decisions in Economics and Finance · doi:10.1007/s10203-025-00544-7 · Cited by 2
Probability Distribution of Risk Priority Numbers in Failure Mode and Effects Analysis
Mahmoudvand, R., Maccioni, A. F., Frigau, L., & Banks, D. (2025) · Risk Analysis · doi:10.1111/risa.70143 · Cited by 2
Sengul, D., & Karahan, F. K. (2026) · Symmetry · doi:10.3390/sym18071115 · Cited by 2
FMEA Using Intuitionistic Fuzzy Hybrid Weighted Euclidean Distance Operator
Liu, H. (2016) · Springer eBooks · doi:10.1007/978-981-10-1466-6_3 · Cited by 2
ویسی, ع., Rohani, A., Tabasizadeh, M., Khodabakhshian, R., & Kolahan, F. (2018) · DOAJ (DOAJ: Directory of Open Access Journals) · Cited by 2
Wang, Q., Yang, C., Zhou, J., Xu, J., Chen, B., Zhu, K., Wu, L., Xu, X., & Su, W. (2023) · Proceedings of the Institution of Mechanical Engineers Part O Journal of Risk and Reliability · doi:10.1177/1748006x231201193 · Cited by 2
Roman, D., Ari, N., & Mell, J. (2024) · Proceedings of the AAAI Conference on Artificial Intelligence and Interactive Digital Entertainment · doi:10.1609/aiide.v20i1.31870 · Cited by 2
Method of Water Consumers Safety Analysis and Assessment
Szpak, D. (2017) · E3S Web of Conferences · doi:10.1051/e3sconf/20171700092 · Cited by 2
Santoso, I., Prahastuti, I. Y., & Pusfitasari, D. A. (2020) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/475/1/012049 · Cited by 2
Atmaka, S. D. C., Santoso, I., Deoranto, P., & Dania, W. A. P. (2023) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/1153/1/012002 · Cited by 2
Erdil, A. (2023) · Pressacademia · doi:10.17261/pressacademia.2023.1817 · Cited by 2
Chen, T., & Wang, Y.-C. (2024) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-024-13046-4 · Cited by 2
Self-citationBahri, T. S., Romano, R., Iskandar, E., Wardhana, M. Y., Widyawati, W., Vonna, A. G., & Humaira, C. S. (2025) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/1476/1/012060 · Cited by 2
de Lemos, F. S. B., Fiorese, A., Alves, O. C., & Vieira, R. (2015) · Intelligent systems reference library · doi:10.1007/978-3-319-17906-3_9 · Cited by 2
Evaluating the Risk of Failure on Injection Pump Using Fuzzy FMEA Method
Rachieru, N., Belu, N., & Anghel, D.-C. (2014) · Applied Mechanics and Materials · doi:10.4028/www.scientific.net/amm.657.976 · Cited by 2
A REVIEW ON THE METHODOLOGIES USED IN FAILURE MODES AND EFFECTS ANALYSIS (FMEA)
Chrysostom, S., & Dwivedi, R. K. (2013) · Cited by 2
Szpak, D., & Tchórzewska-Cieślak, B. (2015) · Journal of Konbin · doi:10.1515/jok-2015-0023 · Cited by 2
Du, Y. (2014) · Journal of Information and Computational Science · doi:10.12733/jics20103022 · Cited by 2
FMEA Using Fuzzy Evidential Reasoning and GRA Method
Liu, H. (2016) · Springer eBooks · doi:10.1007/978-981-10-1466-6_5 · Cited by 2
Syahtaria, I., Mashudi, A., & Suharjo, B. (2018) · JOURNAL ASRO · doi:10.37875/asro.v9i2.73 · Cited by 2
Risk issues in facility layout design
Amri, S. K., Darmoul, S., Hajri–Gabouj, S., & Pierreval, H. (2016) · HAL · Cited by 2
Moreano, Á. D. L., Dilon, C. D. R., & Castillo-Medina, A. G. (2020) · Ciencia Digital · doi:10.33262/cienciadigital.v4i3.1353 · Cited by 2
Yangın Safhalarının HTEA Risk Analizi ile İncelenmesi
Özfırat, M. K., & Özfırat, P. M. (2021) · Karaelmas İş Sağlığı ve Güvenliği Dergisi · doi:10.33720/kisgd.823832 · Cited by 2
Risk Analysis and Process Improvement for Medical Devices with Integrated Method DEA and FMEA
Yamandır, M. N., Dinler, E., & Atalay, K. D. (2022) · Lecture notes on data engineering and communications technologies · doi:10.1007/978-3-031-10385-8_47 · Cited by 2
Altinsoy, U., Aktepe, A., & Ersöz, S. (2022) · Journal of Intelligent & Fuzzy Systems · doi:10.3233/jifs-220985 · Cited by 2
Harwati, Asih, A. M. S., & Sopha, B. M. (2022) · IEEE International Conference on Industrial Engineering and Engineering Management (IEEM) · doi:10.1109/ieem55944.2022.9989884 · Cited by 2
Chnina, K., & Daneshvar, S. (2024) · Applied Sciences · doi:10.3390/app14020584 · Cited by 2
Risk Priority Analysis for Engine Based on Fuzzy Weighted Geometric Mean
Gu, Y. K., Luo, X. C., & Tang, S. Y. (2012) · Advanced materials research · doi:10.4028/www.scientific.net/amr.463-464.1160 · Cited by 2
INTEGRATE FAULT TREE ANALYSIS AND FUZZY SETS IN QUANTITATIVE RISK ASSESSMENT
Ouache, R., & Azizan, N. A. (2014) · Cited by 2
THE ANALYSIS OF THE RISKS OF RENEWABLE ENERGY RESOURCES BY USING FUZZY FMEA TECHNIQUE
Yörükoğlu, H., Özkale, C., Özcan, B., & Çelik, C. (2014) · DergiPark (Istanbul University) · Cited by 2
Risk Analysis and Mitigation Using SCOR -Fuzzy ANP
Afifa, Y. N., & Santoso, I. (2018) · Indian Journal of Science and Technology · doi:10.17485/ijst/2018/v11i24/117978 · Cited by 2
Metadata
- Authors
- Wang, Y.-M., Chin, K.-S., Poon, G. K. K., & Yang, J.-B.
- Affiliations
- City University of Hong Kong (HK)
- Corresponding author
- Wang, Ying-Ming
- Venue
- Expert Systems with Applications
- Publisher
- Elsevier BV
- Published
- 2009-03
- Volume
- 36
- Issue
- 2
- Pages
- 1195-1207
- ISSN
- 0957-4174 (ISSN-L)
- OpenAlex
- W1983686086
- Cited by
- 630
- References
- 31
- Citations by year
- 2026: 26 · 2025: 32 · 2024: 29 · 2023: 37 · 2022: 43 · 2021: 47 · 2020: 54 · 2019: 55 · 2018: 52 · 2017: 40 · 2016: 36 · 2015: 36 · 2014: 42 · 2013: 32 · 2012: 22
- FWCI
- 12.15
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Expert Systems with Applications (publishedVersion)
- Research Explorer (The University of Manchester) (submittedVersion)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Multi-Criteria Decision Making
- Physical Sciences › Mathematics › Statistics and Probability › Fuzzy Systems and Optimization
- Physical Sciences › Engineering › Safety, Risk, Reliability and Quality › Reliability and Maintenance Optimization
- Keywords
- failure mode and effects analysis, fuzzy risk priority number, risk priority number, fuzzy linguistic terms, alpha-cuts, centroid defuzzification, failure mode prioritization, risk factors
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review