Commitment, coordination, competence and the iron triangle
The DOI matches its Crossref record; 25 of the 25 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
(1984) · Cited by 81,983
Atkinson, R. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00069-6 · Cited by 2,359 · cited 1×
“Traditionally project performance is evaluated using schedule, cost, and quality performances, also known as the ‘iron triangle’ [2].”
BackgroundResearch methods for construction
Fellowa, R., & Liu, A. M. M. (2003) · Cited by 1,448
A comparative study of causes of time overruns in Hong Kong construction projects
Chan, D. W., & Kumaraswamy, M. M. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00039-7 · Cited by 831 · cited 1×
“This in itself lends credibility to test results [38,39], yet the analysis results were tested with post analysis structured interviews and case study of 20 live construction projects.”
ResultCritical Success Factors for Public–Private Partnerships in Infrastructure Development
Zhang, X. (2005) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2005)131:1(3 · Cited by 748 · cited 1×
“In recent researches Zhang [22] studied CSF for public–private partnership in infrastructure development while Abraham [23] studied CSF for the construction industry.”
BackgroundCriteria of project success: an exploratory re-examination
Lim, C. S., & Mohamed, M. Z. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00040-4 · Cited by 731
The changing role of the information systems executive : a critical success factors perspectivePreprint
Rockart, J. F. (1980) · RePEc: Research Papers in Economics · Cited by 550
Factors affecting cost performance: evidence from Indian construction projects
Iyer, K. C., & Jha, K. N. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.10.003 · Cited by 504 · cited 1×
“These 55 attributes were collected through case studies, project management literatures and personal interviews of experts in construction industry [24,27].”
BackgroundSelf-citationAn empirical analysis of the relationship between project planning and project success
Dvir, D., Raz, T., & Shenhar, A. J. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00012-1 · Cited by 498 · cited 1×
“While some of the factors have been highlighted to be too important and critical in one literature, the same factors may not bear any recognition in the other [13–17].”
BackgroundFactors Affecting Project Success
Baker, B. N., Murphy, D. C., & Fisher, D. (1997) · Project Management Handbook · doi:10.1002/9780470172353.ch35 · Cited by 401
Jefferies, M. C., Gameson, R., & Rowlinson, S. (2002) · Engineering Construction & Architectural Management · doi:10.1108/eb021230 · Cited by 321
CRITICAL SUCCESS FACTORS ACROSS THE PROJECT LIFE CYCLE
Al-Fahdawi, M. S., Rawi, O. S. A., & Hassan, A. S. (2025) · Journal of Al-Azhar University Engineering Sector · doi:10.21608/auej.2025.336575.1735 · Cited by 259
Critical Factors Affecting Schedule Performance: Evidence from Indian Construction Projects
Iyer, K. C., & Jha, K. N. (2006) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2006)132:8(871 · Cited by 244 · cited 2×
“These 55 attributes were collected through case studies, project management literatures and personal interviews of experts in construction industry [24,27].”
BackgroundMethodSelf-citationConstructive Conflict Resolution: Principles, Training, and Research
Deutsch, M. (1994) · Journal of Social Issues · doi:10.1111/j.1540-4560.1994.tb02395.x · Cited by 239 · cited 1×
“[31–34].”
Glucroft, B. I. (2001) · Ergonomics in Design: The Quarterly of Human Factors Applications · doi:10.1177/106480460100900407 · Cited by 171
Why Does Project Management Fail?
Avots, I. (1969) · California Management Review · doi:10.2307/41164208 · Cited by 167 · cited 1×
“tion; and the improper management of the projects [10–12].”
BackgroundConceptual Model of Partnering
Crowley, L. G., & Karim, M. A. (1995) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(1995)11:5(33 · Cited by 162 · cited 1×
“[31–34].”
The conflict-positive organization : stimulate diversity and create unity
Tjosvold, D. (1990) · Cited by 154
Avison, D., & Torkzadeh, G. (2009) · Sage eBooks · doi:10.4135/9781452274966.n13 · Cited by 151
Model for Predicting Performance of Architects and Engineers
Ling, F. Y. Y. (2002) · Journal of Construction Engineering and Management · doi:10.1061/(asce)0733-9364(2002)128:5(446 · Cited by 79 · cited 1×
“This in itself lends credibility to test results [38,39], yet the analysis results were tested with post analysis structured interviews and case study of 20 live construction projects.”
ResultCritical Success Factors for the Construction Industry
Abraham, G. L. (2003) · Construction Research Congress · doi:10.1061/40671(2003)63 · Cited by 66
Development of the SMARTTM Project Planning framework
Hartman, F. T., & Ashrafi, R. (2004) · International Journal of Project Management · doi:10.1016/j.ijproman.2003.12.003 · Cited by 62
Conflict management styles in Hong Kong industries
Cheung, C. C., & Chuah, K. B. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00059-3 · Cited by 58 · cited 1×
“[31–34].”
Issues affecting motivation on construction projects
MANSFIELD, N., & Odeh, N. S. (1991) · International Journal of Project Management · doi:10.1016/0263-7863(91)90067-6 · Cited by 40 · cited 1×
“clarity of project mission; top management support; project scheduling; client consultation; and personnel selection and training [4,6–9].”
BackgroundHall, S., & Vincenzi, D. A. (2001) · Ergonomics in Design The Quarterly of Human Factors Applications · doi:10.1177/106480460100900307 · Cited by 10
Cited by
Factors associated with the software development agility of successful projects
Sheffield, J., & Lemétayer, J. (2013) · International Journal of Project Management · doi:10.1016/j.ijproman.2012.09.011 · Cited by 222
The relationship between success criteria and success factors in organisational event projects
Cserháti, G., & Szabó, L. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.08.008 · Cited by 174
Metadata
- Authors
- Jha, K. N., & Iyer, K. C.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2007-07
- Volume
- 25
- Issue
- 5
- Pages
- 527-540
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2067345161
- Cited by
- 243
- References
- 25
- FWCI
- 10.49
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.