The DOI matches its Crossref record; 12 of the 12 references it cites were found in a registry or an index.
Criteria of project success: an exploratory re-examination
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Project management : a systems approach to planning, scheduling, and controlling
Kerzner, H. (1995) · Thammasat University Digital Collections · Cited by 3,099
A comparative study of causes of time overruns in Hong Kong construction projects
Chan, D. W., & Kumaraswamy, M. M. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00039-7 · Cited by 831
The Anatomy of Major Projects: A Study of the Reality of Project Management
Morris, P. W. G., & Hough, G. H. (1988) · Medical Entomology and Zoology · Cited by 678
Variations in Critical Success Factors Over the Stages in the Project Life Cycle
Pinto, J. K., & Prescott, J. E. (1988) · Journal of Management · doi:10.1177/014920638801400102 · Cited by 581
Causes of Delay in Large Building Construction Projects
Assaf, S. A., Al-Khalil, M., & Al-Hazmi, M. (1995) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(1995)11:2(45 · Cited by 544
Causes of delay and cost overruns in Nigerian construction projects
Mansfield, N., Ugwu, O., & Doran, T. (1994) · International Journal of Project Management · doi:10.1016/0263-7863(94)90050-7 · Cited by 457
Factors Affecting Project Success
Baker, B. N., Murphy, D. C., & Fisher, D. (1997) · Project Management Handbook · doi:10.1002/9780470172353.ch35 · Cited by 401
BALANCING STRATEGY AND TACTICS IN PROJECT IMPLEMENTATION.
Slevin, D. P., & Pinto, J. K. (1987) · Sloan management review · Cited by 257
In search of excellence in project management
Kerzner, H. (1987) · Journal of systems management · Cited by 217
Reasons for delays in public projects in Turkey
Arditi, D., Akan, G. T., & Gurdamar, S. (1985) · Construction Management and Economics · doi:10.1080/01446198500000013 · Cited by 198
Cited by
Project Success: A Multidimensional Strategic Concept
Shenhar, A. J., Dvir, D., Levy, O., & Maltz, A. C. (2001) · Long Range Planning · doi:10.1016/s0024-6301(01)00097-8 · Cited by 1,222
A Retrospective look at our Evolving Understanding of Project Success
Jugdev, K., & Müller, R. (2005) · Project Management Journal · doi:10.1177/875697280503600403 · Cited by 907
Different stakeholder groups and their perceptions of project success
Davis, K. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.02.006 · Cited by 532
The success of international development projects, trust and communication: an African perspective
Diallo, A., & Thuillier, D. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.10.002 · Cited by 320
Environmental factors and work performance of project managers in the construction industry
Pheng, L. S., & Chuan, Q. T. (2006) · International Journal of Project Management · doi:10.1016/j.ijproman.2005.06.001 · Cited by 306
Metadata
- Authors
- Lim, C. S., & Mohamed, M. Z.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 1999-08
- Volume
- 17
- Issue
- 4
- Pages
- 243-248
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W1965075003
- Cited by
- 731
- References
- 12
- FWCI
- 4.69
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Criteria of project success: an exploratory re-examination. https://app.cochat.ai/papers/10.1016/s0263-7863(98)00040-4
- The paper
- Lim, C. S., & Mohamed, M. Z. (1999). Criteria of project success: an exploratory re-examination. International Journal of Project Management. https://doi.org/10.1016/s0263-7863(98)00040-4
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.