Perceptions of the impact of project sponsorship practices on project success
The DOI matches its Crossref record; 41 of the 41 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Herne, H., Cooley, W. W., & Lohnes, P. R. (1973) · Journal of the Royal Statistical Society. Series A (General) · doi:10.2307/2344428 · Cited by 35,697
(1997) · Chemometrics in Environmental Analysis · doi:10.1002/352760216x.ch5 · Cited by 18,653
Norussis, H. (1993) · Medical Entomology and Zoology · Cited by 2,704
Atkinson, R. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00069-6 · Cited by 2,359
The “real” success factors on projects
Cooke-Davies, T. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00067-9 · Cited by 1,837
Zhu, Q., Sarkis, J., & Lai, K.-H. (2007) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2006.05.021 · Cited by 1,232
Project Success: A Multidimensional Strategic Concept
Shenhar, A. J., Dvir, D., Levy, O., & Maltz, A. C. (2001) · Long Range Planning · doi:10.1016/s0024-6301(01)00097-8 · Cited by 1,222
A new framework for determining critical success/failure factors in projects
Belassi, W., & Tukel, O. I. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00064-x · Cited by 1,187
Measurement of project success
de Wit, A. (1988) · International Journal of Project Management · doi:10.1016/0263-7863(88)90043-9 · Cited by 977
Li, J., & Hambrick, D. C. (2005) · Academy of Management Journal · doi:10.5465/amj.2005.18803923 · Cited by 792
Current practice in project management — an empirical study
White, D., & Fortune, J. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00029-6 · Cited by 705
Morris, P. W. G. (1994) · doi:10.1680/mop.16934 · Cited by 645
Daniel, D. (1961) · Harvard business review · Cited by 643
THE HANDBOOK OF PROJECT-BASED MANAGEMENT
Turner, J. R. (2008) · Cited by 628
Variations in Critical Success Factors Over the Stages in the Project Life Cycle
Pinto, J. K., & Prescott, J. E. (1988) · Journal of Management · doi:10.1177/014920638801400102 · Cited by 581
Theory-W software project management principles and examples
BOEHM, B. W., & Ross, R. W. (1989) · IEEE Transactions on Software Engineering · doi:10.1109/32.29489 · Cited by 538
Factors affecting cost performance: evidence from Indian construction projects
Iyer, K. C., & Jha, K. N. (2005) · International Journal of Project Management · doi:10.1016/j.ijproman.2004.10.003 · Cited by 504
How can IS/IT projects be measured for success?
Wateridge, J. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00022-7 · Cited by 474
ERP Implementation: Chief Information Officers' Perceptions of Critical Success Factors
Nah, F. F.-H., Zuckweiler, K. M., & Lee-Shang Lau, J. (2003) · International Journal of Human-Computer Interaction · doi:10.1207/s15327590ijhc1601_2 · Cited by 455
The handbook of project based management
Bennett, J. M. (1993) · International Journal of Project Management · doi:10.1016/0263-7863(93)90051-n · Cited by 403
ERP systems adoption: An exploratory study of the organizational factors and impacts of ERP success
Law, C. C. H., & Ngai, E. W. T. (2007) · Information & Management · doi:10.1016/j.im.2007.03.004 · Cited by 361
Critical Success Factors in R&D Projects
Pinto, J. K., & Slevin, D. P. (1989) · Research-Technology Management · doi:10.1080/08956308.1989.11670572 · Cited by 294
Swink, M. L. (2000) · Journal of Product Innovation Management · doi:10.1016/s0737-6782(00)00040-0 · Cited by 251
Commitment, coordination, competence and the iron triangle
Jha, K. N., & Iyer, K. C. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2006.11.009 · Cited by 243
An empirical investigation of project evaluation criteria
Tukel, O. I., & Rom, W. O. (2001) · International Journal of Operations & Production Management · doi:10.1108/01443570110364704 · Cited by 171
Key manufacturing capability elements and business performance
Corbett, L. M., & Claridge, G. S. (2002) · International Journal of Production Research · doi:10.1080/00207540110073091 · Cited by 157
A model of information systems development project performance
Yetton, P., Martin, A., Sharma, R., & Johnston, K. D. (2000) · Information Systems Journal · doi:10.1046/j.1365-2575.2000.00088.x · Cited by 147
Geddes, M., Briner, W., & Hastings, C. (1990) · Cited by 139
Agostinelli, C. (2002) · Journal of Applied Statistics · doi:10.1080/02664760220136168 · Cited by 113
The politics of innovation: Why innovations need a godfather
Smith, D. J. (2006) · Technovation · doi:10.1016/j.technovation.2006.05.001 · Cited by 110
Human resource management and performance: A neural network analysis
Stavrou, E., Charalambous, C., & Spiliotis, S. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2006.06.006 · Cited by 106
Leading the development and implementation of collaborative interorganizational systems
Volkoff, O., Chan, Y. E., & Newson, E. F. P. (1999) · Information & Management · doi:10.1016/s0378-7206(98)00087-1 · Cited by 97
Time and budget: the twin imperatives of a project sponsor
Wright, J. (1997) · International Journal of Project Management · doi:10.1016/s0263-7863(96)00059-2 · Cited by 94
The evaluation of risk management in public sector capital projects
Baldry, D. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00015-x · Cited by 89
The impact of information systems on quality performance: an empirical study
Forza, C. (1995) · International Journal of Operations & Production Management · doi:10.1108/01443579510090363 · Cited by 89
Cooperative Planning, Uncertainty, and Managerial Control in Concurrent Design
Mitchell, V. L., & Nault, B. R. (2007) · Management Science · doi:10.1287/mnsc.1060.0641 · Cited by 70
Todorovic, Z. W., & Schlosser, F. K. (2007) · Journal of Small Business & Entrepreneurship · doi:10.1080/08276331.2007.10593401 · Cited by 69
Chia, Y. M., & Koh, H. C. (2007) · Financial Accountability and Management · doi:10.1111/j.1468-0408.2007.00425.x · Cited by 63
Garrido, E. D., Peña, M. L. M., & García‐Muiña, F. E. (2006) · International Journal of Production Research · doi:10.1080/00207540600735480 · Cited by 61
London Ambulance Service computer-aided despatch system
Hougham, M. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00067-4 · Cited by 49
Project Management Body of Knowledge
Richardson, G. L. (2010) · Auerbach Publications eBooks · doi:10.1201/9781439882856-8 · Cited by 38
Cited by
Mir, F. A., & Pinnington, A. H. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.05.012 · Cited by 602
The management of project management: A conceptual framework for project governance
Too, E. G., & Weaver, P. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.07.006 · Cited by 507
Transformational leadership and project success: The mediating role of team-building
Aga, D. A., Noorderhaven, N., & Vallejo, B. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.02.012 · Cited by 486
Critical success factors for World Bank projects: An empirical investigation
Ika, L. A., Diallo, A., & Thuillier, D. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.03.005 · Cited by 448
Project Management for Development in Africa: Why Projects are Failing and What Can be Done about It
Ika, L. A. (2012) · Project Management Journal · doi:10.1002/pmj.21281 · Cited by 253
Metadata
- Authors
- Bryde, D.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2008-11
- Volume
- 26
- Issue
- 8
- Pages
- 800-809
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2073677941
- Cited by
- 182
- References
- 41
- FWCI
- 8.20
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.