Preferred risk allocation in China’s public–private partnership (PPP) projects

Ke, Yongjian, Wang, ShouQing, Chan, Albert P.C., Lam, Patrick T.I.·2010·International Journal of Project Management

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1016/j.ijproman.2009.08.007

Cites

14 of 14 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 14 references

Research works printed but not linked: 10

  1. Arndt, 1998, Risk allocation in the Melbourne City Link Project, Journal of Project Finance, 4, 11
  2. Medda, 2007, A game theory approach for the allocation of risks in transport public private partnerships, International Journal of Project Management, 25, 213, 10.1016/j.ijproman.2006.06.003 · doi:10.1016/j.ijproman.2006.06.003
  3. National Treasury of South Africa, 2004. Public–Private Partnership Manual – Module 4: PPP Feasibility Study, South Africa, pp. 63–66.
  4. Roumboutsos, 2008, Public–private partnership projects in Greece. Risk ranking and preferred risk allocation, Construction Management and Economics, 26, 751, 10.1080/01446190802140086 · doi:10.1080/01446190802140086
  5. Sachs, 2007, Analysis of political risks and opportunities in public private partnerships (PPP) in China and selected Asian countries – Survey results, Chinese Management Studies, 1, 126, 10.1108/17506140710758026 · doi:10.1108/17506140710758026
  6. Victorian Department of Treasury and Finance, 2001. Partnerships Victoria: Risk Allocation and Contractual Issues. Australia, June, pp. 178–191.
  7. Wang, S.Q., Ke, Y.J., 2008. Risk management of infrastructure projects in China with case study of the National stadium. In: Proceedings of the Inaugural Conference on Construction Law and Economics Circle in Asia and Pacific, Kyoto University, Kyoto, Japan, October 27–28. pp. 101–114.
  8. Wang, 1999, Political risks: analysis of key contract clauses in China’s BOT project, Journal of Construction Engineering and Management, 125, 190, 10.1061/(ASCE)0733-9364(1999)125:3(190) · doi:10.1061/(asce)0733-9364(1999)125:3(190
  9. Wang, 2000, Evaluation and management of political risks in China’s BOT projects, Journal of Construction Engineering and Management, 126, 242, 10.1061/(ASCE)0733-9364(2000)126:3(242) · doi:10.1061/(asce)0733-9364(2000)126:3(242
  10. Ye, 2003, Effects of tariff design in risk management of privately financed infrastructure projects, Journal of Construction Engineering and Management, 129, 610, 10.1061/(ASCE)0733-9364(2003)129:6(610) · doi:10.1061/(asce)0733-9364(2003)129:6(610

Cited by

See all 449

Metadata

Authors
Ke, Y., Wang, S., Chan, A. P. C., & Lam, P. T. I.
Venue
International Journal of Project Management
Publisher
Elsevier BV
Published
2010-07
Volume
28
Issue
5
Pages
482-492
ISSN
0263-7863 (ISSN-L)
OpenAlex
W1969400456
Cited by
449
References
14
FWCI
34.68
Type
journal article
Language
en
Open access
closed
Licence
www.elsevier.com/tdm/userlicense/1.0/ (tdm)

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Preferred risk allocation in China’s public–private partnership (PPP) projects. https://app.cochat.ai/papers/10.1016/j.ijproman.2009.08.007
The paper
Ke, Y., Wang, S., Chan, A. P. C., & Lam, P. T. I. (2010). Preferred risk allocation in China’s public–private partnership (PPP) projects. International Journal of Project Management. https://doi.org/10.1016/j.ijproman.2009.08.007

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.