CoChat

BIM-enabled computerized design and digital fabrication of industrialized buildings: A case study

He, Rui, Li, Mingkai, Gan, Vincent J.L., Ma, Jun · 2021 · Journal of Cleaner Production
Cited by 210

The DOI matches its Crossref record; 5 of the 5 references it cites were found in a registry or an index.

Abstract

Abstract Industrialized construction leverages factory-based manufacturing and lean-site assembly to achieve higher industrial efficiency. Building information modeling (BIM) offers new opportunities to underpin the computerized design and fabrication of industrialized buildings, providing greater productivity and cost-effectiveness. In this study, attempts are made to review the state-of-the-art BIM applications on design and prefabrication automation of industrialized buildings, with more emphasis on the recent achievement in concrete 3D printing technology. Following this, a BIM method is proposed to support the detailed geometry design and digital fabrication of modular housings. A program interfaced within BIM is developed and demonstrated through discussions on its capacity in generating the geometry details of 3D-printed modules. In addition, robotic simulation of 3D printing is performed to explore a flexible plan in producing the 3D-printed modules or components. The lessons learned from the study are discussed to highlight the future research challenges and opportunities. First, as current Industry Foundation Classes-based BIM model provides limited support to prefabrication, research on BIM open standards demands more attentions to interoperate the computerized design and computer-aided manufacturing. Moreover, today’s industrialized buildings consist of sophisticated architectural, structural, and mechanical systems that are intervened across the whole life cycle, more research on the interdependent building systems is needed (via digital twins) to optimize the life cycle performance. When moving towards data-driven decision making, there are research needs to expand Internet of Things and Artificial Intelligence to collect the big data from prefabrication, perform predictive analysis, and optimize the control decisions for manufacturing facilities operations. This study illustrates the process and future work in BIM design and prefabrication automation that can assist practitioners to enhance the quality of industrialized construction.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1016/j.jclepro.2020.123505

Cites

5 of 5 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 5 references

Cited by

Metadata

Authors
He, R., Li, M., Gan, V. J. L., & Ma, J.
Venue
Journal of Cleaner Production
Publisher
Elsevier BV
Published
2021-01
Volume
278
Pages
123505
ISSN
0959-6526 (ISSN-L)
OpenAlex
W3048242959
Cited by
210
References
5
FWCI
12.89
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.