Data- and stakeholder management framework for the implementation of BIM-based Material Passports
The DOI matches its Crossref record; 2 of the 2 references it cites were found in a registry or an index.
Abstract
Abstract European Architecture, Engineering and Construction (AEC) industry consumes a significant amount of materials like steel, aluminum, copper and plastics, thus creating a large reservoir on secondary raw materials in buildings. One of the main strategies to minimize environmental impacts and the energy consumption is maximizing recycling rates. To enable circularity, and in consequence high recycling rates, material information about the existing building stock is necessary. Therefore, new design-centric tools and methods, as well as tools, which enable a compilation of data repositories on the material composition of buildings, are required. The first aim of this research is the generation of a Building Information Modelling (BIM) - supported Material Passport (MP), which enables an assessment of the recycling potential and environmental impacts of building materials. For the compilation of the semi-automated MP, a specific methodology was developed and tested on a use case. Thereby various challenges regarding data and stakeholders were faced, such as inconsistent data and lack of collaboration between various stakeholders. These challenges lead to the second focus of this paper – the development of a data- and stakeholder management framework. The data- and stakeholder management framework presents the required collaboration of various stakeholders in order to achieve a successful implementation of the MP in the AEC industry. Results show, that a semi-automated compilation of the BIM-based MP is possible and the implementation of the MP in the AEC industry requires close collaboration of a broad spectrum of stakeholders, thus forming a need for creating digital platforms for life cycle management of buildings and material resources.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Life cycle energy analysis of buildings: An overview
Ramesh, T., Prakash, R., & Shukla, K. K. (2010) · Energy and Buildings · doi:10.1016/j.enbuild.2010.05.007 · Cited by 1,408
Urban Mining A Contribution to Reindustrializing the City
Brunner, P. H. (2011) · Journal of Industrial Ecology · doi:10.1111/j.1530-9290.2011.00345.x · Cited by 215
Research works printed but not linked: 22
- Alwan, 2017, Strategic sustainable development in the UK construction industry, through the framework for strategic sustainable development, using Building Information Modelling, J. Clean. Prod., 140, 349, 10.1016/j.jclepro.2015.12.085 · DOI · Paper page
- Azhar, 2011, Building Information Modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry, Leadersh. Manag. Eng., 11, 241, 10.1061/(ASCE)LM.1943-5630.0000127 · DOI · Paper page
- M.B. Barison, E.T. Santos, An overview of BIM specialists. Computing in Civil and Building Engineering, Proceedings of the ICCCBE2010, 141, 2010.
- Basbagill, 2013, Application of life-cycle assessment to early stage building design for reduced embodied environmental impacts, Build. Environ., 60, 81, 10.1016/j.buildenv.2012.11.009 · DOI · Paper page
- Dahlbo, 2015, Construction and demolition waste management–a holistic evaluation of environmental performance, J. Clean. Prod., 107, 333, 10.1016/j.jclepro.2015.02.073 · DOI · Paper page
- European Union, 2011, Establishing rules and calculation methods for verifying compliance with the targets set in Article 11(2) of Directive 2008/98/EC of the European Parliament and of the Council, Off. J. Eur. Union
- Henisz, 2012, Toward a unified theory of project governance: economic, sociological and psychological supports for relational contracting, Eng. Proj. Organ. J., 2, 37, 10.1080/21573727.2011.637552 · DOI · Paper page
- Kleemann, 2016, A method for determining buildings’ material composition prior to demolition, Build. Res. Inform., 44, 51, 10.1080/09613218.2014.979029 · DOI · Paper page
- Klinglmair, 2010, Urban mining in times of raw material shortage, J. Ind. Ecol., 14, 666, 10.1111/j.1530-9290.2010.00257.x · DOI · Paper page
- Kohler, 2002, The building stock as a research object, Build. Res. Inform., 30, 226, 10.1080/09613210110102238 · DOI · Paper page
- Lichtensteiger, 2008, Exploration of urban stocks, J. Environ. Eng. Manag., 18, 41
- Lieder, 2016, Towards circular economy implementation: a comprehensive review in context of manufacturing industry, J. Clean. Prod., 115, 36, 10.1016/j.jclepro.2015.12.042 · DOI · Paper page
- Martínez-Rojas, 2016, The role of information technologies to address data handling in construction project management, J. Comput. Civil. Eng., 30, 10.1061/(ASCE)CP.1943-5487.0000538 · DOI
- Mining, 2015, Urban mining: concepts, terminology, challenges, Waste Manag., 45, 1, 10.1016/j.wasman.2015.09.040 · DOI · Paper page
- Pinheiro, 2018, MVD based information exchange between BIM and building energy performance simulation, Autom. Constr., 90, 91, 10.1016/j.autcon.2018.02.009 · doi:10.1016/j.autcon.2018.02.009
- M. Prins, S. Mohammadi, N. Slob, Radical Circular Economy. Proceedings of the CIB joint international symposium - Going north for sustainability: Leveraging knowledge and innovation for sustainable construction and development, London, UK, 23-25 November 2015, 2015.
- P. Rajendran, C.P. Gomez. Implementing BIM for waste minimisation in the construction industry: A literature review. in: Proceedings of the 2nd International Conference on Management (2nd ISM 2012), pp. 557–570.
- Soust-Verdaguer, 2017, Critical review of bim-based LCA method to buildings, Energy Build., 136, 110, 10.1016/j.enbuild.2016.12.009 · DOI · Paper page
- Sebastian, 2011, Changing roles of the clients, architects and contractors through BIM, Eng., Constr. Archit. Manag., 18, 176, 10.1108/09699981111111148 · DOI · Paper page
- Scott, 2012, The institutional environment of global project organizations, Eng. Proj. Organ. J., 2, 27, 10.1080/21573727.2011.634546 · DOI
- Srinivasan, 2014, Comparison of energy-based indicators used in life cycle assessment tools for buildings, Build. Environ., 79, 138, 10.1016/j.buildenv.2014.05.006 · DOI
- Volk, 2014, Building Information Modeling (BIM) for existing buildings - literature review and future needs, Autom. Constr., 38, 109, 10.1016/j.autcon.2013.10.023 · DOI · Paper page
Cited by
Circular Digital Built Environment: An Emerging Framework
Çetin, S., De Wolf, C., & Bocken, N. (2021) · Sustainability · doi:10.3390/su13116348 · Cited by 367
“BIM, as a collaboration platform, brings project stakeholders together for effective information sharing and transparent project coordination [43,51,163,171].”
BackgroundInfluentialDigital product passports as enabler of the circular economy
Walden, J., Steinbrecher, A., & Marinkovic, M. (2021) · Chemie Ingenieur Technik · doi:10.1002/cite.202100121 · Cited by 252
Berger, K., Schöggl, J.-P., & Baumgartner, R. J. (2022) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2022.131492 · Cited by 216
Material Passports for the end-of-life stage of buildings: Challenges and potentials
Honic, M., Kovacic, I., Aschenbrenner, P., & Ragossnig, A. (2021) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2021.128702 · Cited by 181
Self-citationÇetin, S., Raghu, D., Honic, M., Straub, A., & Gruis, V. (2023) · Sustainable Production and Consumption · doi:10.1016/j.spc.2023.07.011 · Cited by 147
Self-citation
Metadata
- Authors
- Honic, M., Kovacic, I., Sibenik, G., & Rechberger, H.
- Venue
- Journal of Building Engineering
- Publisher
- Elsevier BV
- Published
- 2019-05
- Volume
- 23
- Pages
- 341-350
- ISSN
- 2352-7102 (ISSN-L)
- OpenAlex
- W2910492381
- Cited by
- 140
- References
- 2
- FWCI
- 7.07
- Type
- journal article
- Language
- en
- Open access
- closed
- Licence
- www.elsevier.com/tdm/userlicense/1.0/ (tdm)
- Funders
- Austrian Ministry of Transport, Innovation and Technology
- FFG (850049)
- Austrian Research Promotion Agency
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.