Student or educator? Sign up with your school email and get 6 months of Pro free.
Cited by 361

The DOI matches its Crossref record; 8 of the 8 references it cites were found in a registry or an index.

Reconceptualizing the effects of lean on production costs with evidence from the F‐22 program

Browning, Tyson R., Heath, Ralph D.·2009·Journal of Operations Management

Abstract

A central tenet in the theory of lean production is that the implementation of lean practices will reduce waste and thereby decrease costs. However, not all lean implementations have produced such results. Apparently, this effect is moderated by several factors, potentially even to the point of reversal. It is important to increase our understanding of how this might occur. In this paper, we explore how novelty, complexity, instability, and buffering affect the relationship between lean implementation and production costs. An interest in these factors drew us to study the case of Lockheed Martin's production system for the F‐22, an extremely complex and innovative product. To build theory, we synthesize our empirical data from the case with other existing theory, such as theories of learning and complexity. Through this analysis, we develop a revised framework that reconceptualizes the effect of lean on production costs and use it to develop 11 propositions to direct further research. Included among these are propositions about how the timing, scale, and extent of lean implementation can regulate the benefits of lean. Furthermore, when the objective of lean is construed as the provision of value, we propose that this value is an emergent property of a complex process, different from the mere sum of the values provided by its constituent tasks. Therefore, the elimination of tasks will not guarantee cost reduction, and lean may provide even greater value by incorporating some aspects of agile manufacturing. Overall, we develop a fuller range of the effects of lean practices on production costs and illuminate how operations managers might control key variables to draw greater benefits from lean implementation.

Overview

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1016/j.jom.2008.03.009

Cites

8 of 8 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Show all 8 references

Cited by

See all 361

Metadata

Authors
Browning, T. R., & Heath, R. D.
Venue
Journal of Operations Management
Publisher
Wiley
Published
2008-04-11
Volume
27
Issue
1
Pages
23-44
ISSN
  • 0272-6963 (ISSN-L)
  • 1873-1317
OpenAlex
W2029934401
Cited by
361
References
8
FWCI
28.34
Type
journal article
Language
en
Open access
closed

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

How to cite

Cite CoChat for the checks on this page, and the paper for its own findings.

This page
CoChat. (2026). Citation check: Reconceptualizing the effects of lean on production costs with evidence from the F‐22 program. https://app.cochat.ai/papers/10.1016/j.jom.2008.03.009
The paper
Browning, T. R., & Heath, R. D. (2009). Reconceptualizing the effects of lean on production costs with evidence from the F‐22 program. Journal of Operations Management. https://doi.org/10.1016/j.jom.2008.03.009

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.