The DOI matches its Crossref record; 10 of the 13 references it cites were found in a registry or an index.
Drivers and Barriers of Lean Implementation in the Greek Manufacturing Sector
Open accessAbstract
Lean manufacturing has evolved from a set of tools and techniques to become a management philosophy. It can be used to reduce waste and improve the efficiency of companies. Many companies worldwide have implemented lean management and achieved great improvements. The present paper focuses on the lean manufacturing implementation within the Greek manufacturing sector. The purpose is to determine the extent to which the main principles of lean manufacturing are understood and adopted in Greek manufacturing sector companies. Also this paper aims to assess the importance of the driving factors and barriers towards implementing lean manufacturing in the Greek environment. A structured questionnaire was developed and circulated to a large number of Greek manufacturing companies. Based on the literature review and questionnaire findings, the degree of implementing lean manufacturing in Greece is assessed and discussed against literature review findings.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Implementation of LM assisted manufacturing firms in Greece to reduce waste and continuously improve their operations”
From A systematic literature review of lean manufacturing implementation in manufacturing-based sectors of the developing and developed countries (2022) · cites this paper as Salonitis and Tsinopoulos (2016)
In the citing paper
“Implementation of LM assisted manufacturing firms in Greece to reduce waste and continuously improve their operations”
From A systematic literature review of lean manufacturing implementation in manufacturing-based sectors of the developing and developed countries (2022) · cites this paper as Salonitis and Tsinopoulos (2016)
In the citing paper
“ThemajordriversfororganizationsimplementingLMindevelopinganddevelopedcountries areimprovingmanufacturingoperationsandcustomersatisfaction(JastiandKodali,2016; Sanders etal. ,2016;SalonitisandTsinopoulos,2016).”
From A systematic literature review of lean manufacturing implementation in manufacturing-based sectors of the developing and developed countries (2022) · cites this paper as Salonitis and Tsinopoulos, 2016
Citations
Cites
Extreme Programming Explained: Embrace Change
Beck, K. L., & Andres, C. (2000) · Cited by 5,855
African Journal of Business Management
Baten, M. A., & Kamil, A. A. (2026) · AFRICAN JOURNAL OF BUSINESS MANAGEMENT · doi:10.5897/ajbm · Cited by 4,206
A Study of the Toyota Production System From an Industrial Engineering Viewpoint
Shingo, S., & Bodek, N. (2019) · doi:10.4324/9781315136509 · Cited by 1,064
Applying the lessons learned from 27 lean manufacturers.
Panizzolo, R. (1998) · International Journal of Production Economics · doi:10.1016/s0925-5273(98)00066-8 · Cited by 251
A framework for lean manufacturing implementation
Mostafa, S. F., Dumrak, J., & Soltan, H. (2013) · Production & Manufacturing Research · doi:10.1080/21693277.2013.862159 · Cited by 249
Beck, K. (1999) · Technology of Object-Oriented Languages and Systems · doi:10.1109/tools.1999.779100 · Cited by 198
A simulation-enhanced lean design process
Marvel, J., & Standridge, C. R. (2009) · LA Referencia (Red Federada de Repositorios Institucionales de Publicaciones Científicas) · doi:10.3926/jiem..v2n1.p90-113 · Cited by 95
A proposed dynamic model for a lean roadmap
Anvari, A., Zulkifli, N., Yusuff, R. M., Hojjati, S. M., & Ismail, Y. (2011) · AFRICAN JOURNAL OF BUSINESS MANAGEMENT · doi:10.5897/ajbm10.1278 · Cited by 67
Simulation-enhanced lean design process
Standridge, C. R., & Marvel, J. (2009) · Journal of Industrial Engineering and Management · doi:10.3926/jiem.2009.v2n1.p90-113 · Cited by 43
LEAN PRODUCTION IMPLEMENTATION: A SURVEY IN ITALY
Staudacher, A. P., & Tantardini, M. (2008) · Dirección y Organización · doi:10.37610/dyo.v0i35.56 · Cited by 27
Cited by
Sorted by citations
The Role of Leadership in Implementing Lean Manufacturing
Alefari, M., Salonitis, K., & Xu, Y. (2017) · Procedia CIRP · doi:10.1016/j.procir.2017.03.169 · Cited by 168
Self-citationLean Implementation Frameworks: The Challenges for SMEs
Almanei, M., Salonitis, K., & Xu, Y. (2017) · Procedia CIRP · doi:10.1016/j.procir.2017.03.170 · Cited by 131
Self-citationTouriki, F. E., Benkhati, I., Kamble, S., Belhadi, A., & Elfezazi, S. (2021) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2021.128691 · Cited by 131
Critical review of literature on Lean Six Sigma methodology
Patel, A. S., & Patel, K. M. (2021) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-04-2020-0043 · Cited by 113
Dehdasht, G., Ferwati, M. S., Zin, R. M., & Abidin, N. Z. (2020) · PLoS ONE · doi:10.1371/journal.pone.0228746 · Cited by 114
Barriers to lean six sigma implementation in the supply chain: An ISM model
Ali, S. M., Hossen, M. A., Mahtab, Z., Kabir, G., Paul, S. K., & Adnan, Z. H. (2020) · Computers & Industrial Engineering · doi:10.1016/j.cie.2020.106843 · Cited by 104
Maware, C., Okwu, M. O., & Adetunji, O. (2022) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-12-2020-0223 · Cited by 88
Analysing the barriers of lean in Indian coal mining industry using integrated ISM-MICMAC and SEM
Khaba, S., & Bhar, C. (2018) · Benchmarking An International Journal · doi:10.1108/bij-04-2017-0057 · Cited by 75
A conceptual lean implementation framework based on change management theory
Almanei, M., Salonitis, K., & Tsinopoulos, C. D. (2018) · Procedia CIRP · doi:10.1016/j.procir.2018.03.141 · Cited by 72
Self-citationLean Manufacturing: Trends and Implementation Issues
Duraković, B., Demir, R., Abat, K., & Emek, C. (2018) · Periodicals of Engineering and Natural Sciences (PEN) · doi:10.21533/pen.v6.i1.1697 · Cited by 71
Hariyani, D., & Mishra, S. (2022) · Cleaner Engineering and Technology · doi:10.1016/j.clet.2022.100449 · Cited by 80
Drivers and motives for sustainable manufacturing system
Hariyani, D., Mishra, S., Hariyani, P., & Sharma, M. K. (2023) · Innovation and Green Development · doi:10.1016/j.igd.2022.100031 · Cited by 66
A new vision of LARG Manufacturing — A trail towards Industry 4.0
Amjad, M. S., Rafique, M. Z., Hussain, S., & Khan, M. A. (2020) · CIRP journal of manufacturing science and technology · doi:10.1016/j.cirpj.2020.06.012 · Cited by 73
Organizational enablers for sustainable manufacturing and industrial ecology
Hariyani, D., & Mishra, S. (2021) · Cleaner Engineering and Technology · doi:10.1016/j.clet.2021.100375 · Cited by 60
Lean manufacturing, leadership and employees: the case of UAE SME manufacturing companies
Alefari, M., Almanei, M., & Salonitis, K. (2020) · Production & Manufacturing Research · doi:10.1080/21693277.2020.1781704 · Cited by 59
Self-citationDahmani, N., Belhadi, A., Benhida, K., Elfezazi, S., Touriki, F. E., & Azougagh, Y. (2021) · Energy & Environment · doi:10.1177/0958305x21993481 · Cited by 57
Joshi, S., Sharma, M., Bartwal, S., Joshi, T., & Prasad, M. (2022) · The TQM Journal · doi:10.1108/tqm-08-2022-0245 · Cited by 56
Singh, C., Singh, D., & Khamba, J. S. (2020) · Journal of Science and Technology Policy Management · doi:10.1108/jstpm-08-2019-0080 · Cited by 50
Schulze, F., & Dallasega, P. (2021) · Production Planning & Control · doi:10.1080/09537287.2021.1888159 · Cited by 47
Qureshi, K. M., Mewada, B. G., Alghamdi, S. Y., Almakayeel, N. M., Mansour, M., & Qureshi, M. N. (2022) · Applied System Innovation · doi:10.3390/asi5040084 · Cited by 46
Lean Manufacturing Implementation through DMAIC Approach: A Case Study in the Automotive Industry
Rifqi, H., Zamma, A., Souda, S. B., & Hansali, M. (2021) · Quality Innovation Prosperity · doi:10.12776/qip.v25i2.1576 · Cited by 74
Organizational barriers to the sustainable manufacturing system: A literature review
Hariyani, D., Mishra, S., Sharma, M. K., & Hariyani, P. (2022) · Environmental Challenges · doi:10.1016/j.envc.2022.100606 · Cited by 53
DeSanctis, I., Ordieres-Meré, J. B., Bevilacqua, M., & Ciarapica, F. E. (2018) · Production Planning & Control · doi:10.1080/09537287.2018.1494345 · Cited by 40
Hariyani, D., & Mishra, S. (2022) · Benchmarking An International Journal · doi:10.1108/bij-08-2021-0488 · Cited by 42
Gandhi, J., Thanki, S. J., & Thakkar, J. J. (2021) · The TQM Journal · doi:10.1108/tqm-12-2020-0289 · Cited by 36
Barriers for Lean implementation in the textile industry
Robertsone, G., Mežinska, I., & Lapiņa, I. (2021) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-12-2020-0225 · Cited by 35
Hariyani, D., & Mishra, S. (2022) · Benchmarking : An International Journal · doi:10.1108/bij-10-2021-0585 · Cited by 28
Vigneshvaran, R., & Vinodh, S. (2020) · The TQM Journal · doi:10.1108/tqm-07-2020-0151 · Cited by 34
Dallasega, P., Schulze, F., & Revolti, A. (2022) · Construction Management and Economics · doi:10.1080/01446193.2022.2135748 · Cited by 36
Literature Review of Lean Manufacturing in Small and Medium-sized Enterprises
Driouach, L., Zarbane, K., & Beidouri, Z. (2019) · International Journal of Technology · doi:10.14716/ijtech.v10i5.2718 · Cited by 32
Farouk, I. I. E., Moufad, I., Frichi, Y., Arif, J., & Jawab, F. (2020) · Information · doi:10.3390/info11090431 · Cited by 32
Barriers to Adopting Lean Construction in Small and Medium-Sized Enterprises—The Case of Peru
Huaman-Orosco, C., Erazo-Rondinel, A. A., & Herrera, R. F. (2022) · Buildings · doi:10.3390/buildings12101637 · Cited by 32
Bhadu, J., Singh, D., & Bhamu, J. (2021) · International Journal of Productivity and Performance Management · doi:10.1108/ijppm-10-2020-0540 · Cited by 34
Hybrid simulation modelling of the human-production process interface in lean manufacturing systems
Oleghe, O., & Salonitis, K. (2018) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-01-2018-0004 · Cited by 24
Self-citationThe Development of an Excellence Model Integrating the Shingo Model and Sustainability
Sá, J. C., Reis, M., Dinis‐Carvalho, J., Silva, F. J. G., Santos, G., Ferreira, L. P., & Lima, V. M. (2022) · Sustainability · doi:10.3390/su14159472 · Cited by 24
Prasad, S. V. S. R., Baltov, M., Neelakanteswara Rao, A., & Lanka, K. (2020) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-09-2019-0100 · Cited by 25
Pinto, J. L. Q., Matias, J. C. O., Pimentel, C., Azevedo, S. G., & Govindan, K. (2018) · Management for professionals · doi:10.1007/978-3-319-77016-1_4 · Cited by 22
Hariyani, D., & Mishra, S. (2023) · Benchmarking An International Journal · doi:10.1108/bij-06-2022-0344 · Cited by 22
Palacios-Gazules, S., Giménez, G., & Castro, R. D. (2024) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-06-2023-0103 · Cited by 21
Hoellthaler, G., Braunreuther, S., & Reinhart, G. (2019) · Procedia CIRP · doi:10.1016/j.procir.2019.02.046 · Cited by 21
Mohapatra, B., Tripathy, S., & Singhal, D. (2023) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-06-2022-0134 · Cited by 19
Sustainability metrics and a hybrid decision-making model for selecting lean manufacturing tools
Naeemah, A. J., & Wong, K. Y. (2023) · Resources Environment and Sustainability · doi:10.1016/j.resenv.2023.100120 · Cited by 18
Reducing the Scrap Rate on a Production Process Using Lean Six Sigma Methodology
Enache, I., Chivu, O. R., Rugescu, A.-M. M., Ioniță, E., & Radu, I. V. (2023) · Processes · doi:10.3390/pr11041295 · Cited by 17
Salman, S., Morshed, S. M., Karim, M. R., Rahman, R., Hasanat, S., & Ahsan, A. (2024) · International Journal of Industrial Engineering and Operations Management · doi:10.1108/ijieom-10-2023-0074 · Cited by 17
Analysing the barriers to green apparel manufacturing implementation
Guo, H. (2022) · Journal of Fashion Marketing and Management · doi:10.1108/jfmm-09-2021-0226 · Cited by 15
Action research of lean 4.0 application to the maintenance of hydraulic systems in steel industry
Torre, N. M. D. M., & Bonamigo, A. (2024) · Journal of Quality in Maintenance Engineering · doi:10.1108/jqme-06-2023-0058 · Cited by 19
Lean projects’ evaluation: the perceived level of success and barriers
Antomarioni, S., Bevilacqua, M., Ciarapica, F., Sanctis, I. D., & Meré, J. B. O. (2020) · Total Quality Management and Business Excellence · doi:10.1080/14783363.2020.1731301 · Cited by 16
Munyai, T., Makinde, O. A., Mbohwa, C., & Ramatsetse, B. (2019) · The South African Journal of Industrial Engineering · doi:10.7166/30-1-2089 · Cited by 15
Tripathi, V., Chattopadhyaya, S., Mukhopadhyay, A., Sharma, S., Li, C.-H., Singh, S., Saleem, W., Salah, B., & Mohamed, A. (2022) · Processes · doi:10.3390/pr10081587 · Cited by 15
Caracterización de los procesos productivos de las pymes textileras de Cundinamarca
Sarmiento, W. J. A., Sandoval, D. C. G., & González, A. (2019) · Revista Logos, Ciencia & Tecnología · doi:10.22335/rlct.v11i2.839 · Cited by 8
Improving Overhaul Process on Steam Power Plants using Lean Thinking and LCA
Devi, O. M., & Putu, D. (2020) · IOP Conference Series Earth and Environmental Science · doi:10.1088/1755-1315/448/1/012043 · Cited by 12
Exploring Lean HRM Practices in the Aerospace Industry
Benkarim, A., & Imbeau, D. (2022) · Sustainability · doi:10.3390/su14095208 · Cited by 12
Alzunaidy, N. A., Al-Khalifa, A. S., Alhussain, M. H., Mohammed, M. A., Alfheeaid, H. A., Faris, M. E., & Althwab, S. A. (2023) · Medicina · doi:10.3390/medicina59071191 · Cited by 11
Salman, S., Ahmed, T., Taqi, H. M. M., Frederico, G. F., Dip, A. S., & Ali, S. M. (2023) · International Journal of Industrial Engineering and Operations Management · doi:10.1108/ijieom-02-2023-0027 · Cited by 11
Cortez, C., Laura, N. D., Viacava, G., Raymundo, C., & Domínguez, F. (2019) · Advances in intelligent systems and computing · doi:10.1007/978-3-030-20154-8_10 · Cited by 11
Singh, C., & Singh, D. (2024) · Measuring Business Excellence · doi:10.1108/mbe-04-2023-0067 · Cited by 10
Sakataven, R. S., Helmi, S. A., & Hisjam, M. (2021) · Evergreen · doi:10.5109/4480735 · Cited by 10
Improving The Order Fulfilment Process At A Metalwork Company
Dias, J. A., Ferreira, L. P., Sá, J. C., Ribeiro, M. T., & Silva, F. J. G. (2019) · Procedia Manufacturing · doi:10.1016/j.promfg.2019.10.030 · Cited by 10
Lean Thinking: From the Shop Floor to an Organizational Culture
Amaro, P., Alves, A. C., & Sousa, R. M. (2020) · IFIP advances in information and communication technology · doi:10.1007/978-3-030-57997-5_47 · Cited by 10
Almutairi, A. M., Almanei, M., Al-Ashaab, A., & Salonitis, K. (2021) · Logistics · doi:10.3390/logistics5010009 · Cited by 10
Self-citationConceptual Framework of Lean Ergonomics for Assembly Process: PDCA Approach
Universiti Teknikal Malaysia Melaka, M., & Amin, A. N. M. (2018) · Journal of Engineering and Science Research · doi:10.26666/rmp.jesr.2018.1.9 · Cited by 10
Guillen, D. J., Gómez, D., Hernández, I., Charris, D., Gonzalez, J., Leon, D., & Sanjuan, M. E. (2020) · Facilities · doi:10.1108/f-03-2019-0040 · Cited by 10
Lean implementation barriers in the apparel industry in Bangladesh
Bashar, A., Hasin, A. A., Sakib, M. N., & Bashar, N. B. (2024) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-12-2022-0249 · Cited by 11
Prioritization of Lean Six Sigma Success Factors using Pareto Analysis
Patel, A. S., & Patel, K. M. (2021) · IOP Conference Series Materials Science and Engineering · doi:10.1088/1757-899x/1070/1/012133 · Cited by 9
Evaluating Agile and Lean Software Development Methods from a System Dynamics Perspective
Ching, P. M. L., & Mutuc, J. E. (2018) · IEEE International Conference on Humanoid, Nanotechnology, Information Technology, Communication and Control, Environment, and Management (HNICEM) · doi:10.1109/hnicem.2018.8666338 · Cited by 8
Introduction to Lean Waste and Lean Tools
Sharma, S. S., & Khatri, R. (2021) · IntechOpen eBooks · doi:10.5772/intechopen.97573 · Cited by 8
Assessment of Organizational Culture in Construction – A Case Study Approach
Simon, S. M., & Varghese, K. (2018) · Annual Conference of the International Group for Lean Construction · doi:10.24928/2018/0396 · Cited by 8
Modelling and Analysis of Barriers in Lean Green Manufacturing Implementation: An ISM Approach
Prasad, S. V. S. R., Neelakanteswara Rao, A., & Lanka, K. (2021) · Lecture notes on multidisciplinary industrial engineering · doi:10.1007/978-3-030-73495-4_7 · Cited by 8
Lean manufacturing is the financial performance and sustainable finances problems solution?
Maldonado-Guzmán, G., Pinzón-Castro, S. Y., & del Toro, R. J. (2023) · Tec Empresarial · doi:10.18845/te.v17i3.6846 · Cited by 6
A FRAMEWORK FOR LEAN READINESS EVALUATION USING A HIERARCHICAL FUZZY SYSTEM
Baskaran, S. M., & Lakshmanan, A. R. (2019) · DOAJ (DOAJ: Directory of Open Access Journals) · doi:10.7166/30-1-1988 · Cited by 7
Harin, R. S., Sanmukhaprian, S. R. J., Raghuram, P., Sreedharan, V., & Zouadi, T. (2024) · IEEE transactions on engineering management · doi:10.1109/tem.2023.3240927 · Cited by 3
Cognitive biases that influence Lean implementation and practices in a multicultural environment
Purushothaman, M. B., Seadon, J., & Moore, D. (2023) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-10-2022-0218 · Cited by 6
Matindana, J. M., Sinkamba, F. D., & Mgwatu, M. I. (2025) · African Journal of Science Technology Innovation and Development · doi:10.1080/20421338.2025.2471095 · Cited by 6
Karthikeyan, R., & Jerald, J. (2025) · International Journal on Interactive Design and Manufacturing (IJIDeM) · doi:10.1007/s12008-025-02294-7 · Cited by 6
From Micro to Macro: A Comprehensive Study of Lean Manufacturing Tools in Tanzanian Industries
Sinkamba, F. D., Matindana, J. M., & Mgwatu, M. I. (2025) · Engineering Reports · doi:10.1002/eng2.70020 · Cited by 8
Uso y aplicación de herramientas del modelo de producción Toyota: una revisión de literatura
Pinzón, D. S. M., Sarmiento, W. J. A., & Sandoval, D. C. V. (2018) · Revista Politécnica · doi:10.33571/rpolitec.v14n27a8
Determinants Influencing the Application of Lean Accounting: The Case of Vietnamese Garment Firms
Nguyen, T. M. P., & Ngo, T. H. C. (2023) · Journal of risk and financial management · doi:10.3390/jrfm16050279 · Cited by 6
Building and evolving a culture of excellence: a conceptual exploration
Provance, T. W., Ramisetty, S. B., Urick, M. J., & Wieczorkowski, K. A. (2022) · Measuring Business Excellence · doi:10.1108/mbe-05-2021-0067 · Cited by 6
Qureshi, K. M., & Mewada, B. G. (2025) · Frontiers in Engineering and Built Environment · doi:10.1108/febe-02-2025-0011 · Cited by 5
Yasir, A. S. H. M., Mohamed, N. M. Z. N., & Nelfiyanti (2024) · Heliyon · doi:10.1016/j.heliyon.2024.e38216 · Cited by 11
Le, T. T., & Le, H. C. (2024) · Operations Management Research · doi:10.1007/s12063-024-00525-w · Cited by 5
A K-Chart based implementation framework to attain lean & agile manufacturing
Zaheer, S., Amjad, M. S., Rafique, M. Z., & Khan, M. A. (2020) · International journal of production management and engineering · doi:10.4995/ijpme.2020.12935 · Cited by 6
Terradillos, E. E. D., Matias, J. C. O., Navas, H. V. G., & Costa, O. (2026) · Sustainability · doi:10.3390/su18031666 · Cited by 5
Identification and categorization of lean manufacturing barriers in Indian SMEs
Sharma, S. S., Pandey, P. K., & Sharma, B. P. (2020) · AIP conference proceedings · doi:10.1063/5.0024294 · Cited by 4
Modelo de gestión del cambio organizacional con pensamiento lean en servicios turísticos
Cancañón, C. E. Z., León, Y. O. L., & Pino, M. R. M. (2021) · Contaduría y Administración · doi:10.22201/fca.24488410e.2022.2912 · Cited by 4
Longitudinal study of lean tools in Spanish manufacturing firms
Palacios-Gazules, S., Leal, G. G., & Vila, R. D. C. (2023) · Journal of Manufacturing Technology Management · doi:10.1108/jmtm-11-2022-0406 · Cited by 5
Ahmed, A., Mathrani, S., & Jayamaha, N. P. (2020) · IEEE Asia-Pacific Conference on Computer Science and Data Engineering (CSDE) · doi:10.1109/csde50874.2020.9411384 · Cited by 4
Can BIMFurnish Lean Benefits - an Indian Case Study
Singhal, N., & Ahuja, R. (2018) · Annual Conference of the International Group for Lean Construction · doi:10.24928/2018/0425 · Cited by 4
Implementation of Lean Manufacturing Methods in Russian Companies
Смирнов, С., & Sorokin, G. S. (2022) · EURASIAN INTEGRATION economics law politics · doi:10.22394/2073-2929-2022-04-55-67 · Cited by 3
Lean construction and SDGs: Delivering value and performance in the built environment
Opoku, A., Adewumi, A. S., Lok, K. L., & Amoh, E. (2024) · Edward Elgar Publishing eBooks · doi:10.4337/9781035300037.00027 · Cited by 3
Facilitating lean implementation through change management
Almanei, M., Kaur, R., Patsavellas, J., & Salonitis, K. (2024) · Procedia CIRP · doi:10.1016/j.procir.2024.03.012 · Cited by 3
Self-citationObstacles to the Introduction of Lean Production in Russian Electrotechnical Enterprises
Iashchenko, V. V., & Orlova, E. D. (2019) · IEEE Conference of Russian Young Researchers in Electrical and Electronic Engineering · doi:10.1109/eiconrus.2019.8657146 · Cited by 3
da Silva, T. M. F., Santos, L. C., & Gohr, C. F. (2021) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-10-2020-0167 · Cited by 3
Matindana, J. M., Sinkamba, F. D., & Mgwatu, M. I. (2025) · Engineering Reports · doi:10.1002/eng2.70414 · Cited by 3
Change Management via Data Analytics for a successful Lean Transformation of Public Companies
Angelopoulos, M., & Pollalis, Y. (2021) · Archives of Business Research · doi:10.14738/abr.912.11351 · Cited by 2
Obstacles in adopting Lean Thinking at the Driver and Vehicle Licensing Authority in Ghana
Nyande, K., Alhassan, S., & Tuurosong, D. (2022) · Ghana Journal of Development Studies · doi:10.4314/gjds.v19i2.4 · Cited by 2
LEAN SYSTEMS E INDÚSTRIA 4.0 APLICADOS NA INDÚSTRIA SIDERÚRGICA: UMA ANÁLISE BIBLIOMÉTRICA
Torre, N. M. D. M., Leo, C. G., & Bonamigo, A. (2023) · Simpósio Acadêmico de Engenharia de Produção da EEL-USP (SAEPRO) · doi:10.29327/1289625.4-17 · Cited by 2
Presentación, R. V., & Florez, J. V. (2025) · Production Engineering Archives · doi:10.30657/pea.2025.31.15 · Cited by 2
Schulze, F., & Dallasega, P. (2022) · Annual Conference of the International Group for Lean Construction · doi:10.24928/2022/0192 · Cited by 3
FRAMEWORK FOR SUCCESSFUL PROBLEM-SOLVING IN LEAN: A FOCUS GROUP RESEARCH IN MALAYSIAN AUTOMOTIVE
Islam, A. S. M. T. (2023) · MEST Journal · doi:10.12709/mest.11.11.01.06 · Cited by 2
Metadata
- Authors
- Salonitis, K., & Tsinopoulos, C.
- Affiliations
- Cranfield University (GB)
- Durham University (GB)
- Corresponding author
- Salonitis, Konstantinos
- Venue
- Procedia CIRP
- Publisher
- Elsevier BV
- Published
- 2016
- Volume
- 57
- Pages
- 189-194
- ISSN
- 2212-8271 (ISSN-L)
- OpenAlex
- W2569465694
- Cited by
- 130
- References
- 13
- Citations by year
- 2026: 5 · 2025: 8 · 2024: 10 · 2023: 21 · 2022: 23 · 2021: 20 · 2020: 17 · 2019: 11 · 2018: 13 · 2017: 2
- FWCI
- 15.55
- Type
- journal article
- Language
- en
- Open access
- diamond
- doi.org
- Licence
- Locations
- Procedia CIRP (publishedVersion, cc-by-nc-nd)
- Durham Research Online (Durham University) (acceptedVersion, other-oa)
- Durham Research Online (Durham University) (submittedVersion, cc-by-nc-nd)
- CERES (Cranfield University) (submittedVersion, cc-by-nc-nd)
- Topics
- Social Sciences › Business, Management and Accounting › Management Information Systems › Quality and Supply Management
- Social Sciences › Business, Management and Accounting › Strategy and Management › Management and Optimization Techniques
- Physical Sciences › Engineering › Industrial and Manufacturing Engineering › Digital Transformation in Industry
- Keywords
- lean manufacturing, lean implementation, implementation drivers, implementation barriers, Greek manufacturing sector, waste reduction, manufacturing companies
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review