The DOI matches its Crossref record; 23 of the 23 references it cites were found in a registry or an index.
A Review on Lean Manufacturing Implementation Techniques
Open accessAbstract
The concept of lean manufacturing was developed for maximizing the resource utilization through minimization of waste, later on lean was formulated in response to the fluctuating and competitive business environment. Due to rapidly changing business environment the organizations are forced to face challenges and complexities. Any organization whether manufacturing or service oriented to survive may ultimately depend on its ability to systematically and continuously respond to these changes for enhancing the product value. Therefore value adding process is necessary to achieve this perfection; hence implementing a lean manufacturing system is becoming a core competency for any type of organizations to sustain. The majority of the study focuses on single aspect of lean element, only very few focuses on more than one aspect of lean elements, but for the successful implementation of lean the organisation had to focuses on all the aspects such as Value Stream Mapping (VSM),Cellular Manufacturing (CM), U-line system, Line Balancing, Inventory control, Single Minute Exchange of Dies (SMED), Pull System, Kanban, Production Levelling etc., In this paper, an attempt has been made to develop a lean route map for the organization to implement the lean manufacturing system. Analyses of the exploratory survey results are summarized in this paper to illustrate the implementation sequence of lean elements in volatile business environment and the finding of this review was synthesized to develop a unified theory for implementation of lean elements.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A survey of scheduling problems with setup times or costs
Allahverdi, A., Ng, C. T., Cheng, T. C. E., & Kovalyov, M. Y. (2006) · European Journal of Operational Research · doi:10.1016/j.ejor.2006.06.060 · Cited by 1,398
Monden, Y. (1993) · Springer eBooks · doi:10.1007/978-1-4615-9714-8 · Cited by 1,303
Liker, J. Κ. (2003) · Cited by 1,134
A survey on problems and methods in generalized assembly line balancing
Becker, C., & Schöll, A. (2004) · European Journal of Operational Research · doi:10.1016/j.ejor.2004.07.023 · Cited by 1,086
Abdulmalek, F. A., & Rajgopal, J. (2007) · International Journal of Production Economics · doi:10.1016/j.ijpe.2006.09.009 · Cited by 1,046
Pegels, C. C. (1984) · Japan vs. the West · doi:10.1007/978-94-017-5271-8_8 · Cited by 802
A Revolution in Manufacturing: The SMED System
Shingo, S. (2019) · Routledge eBooks · doi:10.4324/9781315136479 · Cited by 792
An overview of continuous improvement: from the past to the present
Bhuiyan, N., & Baghel, A. (2005) · Management Decision · doi:10.1108/00251740510597761 · Cited by 642
The Impact of Just-in-Time Manufacturing and Its Infrastructure on Manufacturing Performance
Sakakibara, S., Flynn, B. B., Schroeder, R. G., & Morris, W. T. (1997) · Management Science · doi:10.1287/mnsc.43.9.1246 · Cited by 462
Developing strategic continuous improvement capability
Bessant, J., & Francis, D. (1999) · International Journal of Operations & Production Management · doi:10.1108/01443579910291032 · Cited by 405
Variations of the kanban system: Literature review and classification
Lage Junior, M., & Godinho Filho, M. (2010) · International Journal of Production Economics · doi:10.1016/j.ijpe.2010.01.009 · Cited by 388
Organizational Change Recipients' Beliefs Scale: Development of an Assessment Instrument
Armenakis, A. A., Bernerth, J. B., Pitts, J. P., & Walker, H. J. (2007) · The Journal of Applied Behavioral Science · doi:10.1177/0021886307303654 · Cited by 386
The impact of lean practices on inventory turnover
Demeter, K., & Matyusz, Z. (2011) · International Journal of Production Economics · doi:10.1016/j.ijpe.2009.10.031 · Cited by 298
Production Flow Analysis through Value Stream Mapping: A Lean Manufacturing Process Case Study
Rahani, A. R., & al-Ashraf, M. (2012) · Procedia Engineering · doi:10.1016/j.proeng.2012.07.375 · Cited by 295
Continuous improvement and kaizen: standardization and organizational designs
Berger, A. (1997) · Integrated Manufacturing Systems · doi:10.1108/09576069710165792 · Cited by 220
Utilising Simulation to Enhance Value Stream Mapping: A Manufacturing Case Application
McDonald, T., Van Aken, E. M., & Rentes, A. F. (2002) · International Journal of Logistics Research and Applications · doi:10.1080/13675560210148696 · Cited by 216
Factors influencing employee perceptions in lean transformations
Losonci, D., Demeter, K., & Jenei, I. (2011) · International Journal of Production Economics · doi:10.1016/j.ijpe.2010.12.022 · Cited by 193
A revolution in manufacturing : the SMED system
新郷, 重. (1985) · Productivity Press eBooks · Cited by 192
Herron, C., & Hicks, C. (2007) · Robotics and Computer-Integrated Manufacturing · doi:10.1016/j.rcim.2007.07.014 · Cited by 153
Trading off between heijunka and just-in-sequence
Hüttmeir, A., de Treville, S., van Ackere, A., Monnier, L., & Prenninger, J. P. (2009) · International Journal of Production Economics · doi:10.1016/j.ijpe.2008.12.014 · Cited by 125
Literature review of material flow control mechanisms
Graves, R. J., Konopka, J., & Milne, R. J. (1995) · Production Planning & Control · doi:10.1080/09537289508930296 · Cited by 73
Efficiency and Economic Evaluation of Cellular Manufacturing to Enable Lean Machining
Metternich, J., Bechtloff, S., & Seifermann, S. (2013) · Procedia CIRP · doi:10.1016/j.procir.2013.06.038 · Cited by 29
The reliable design of one-piece flow production system using fuzzy ant colony optimization
Li, S. G., & Rong, Y. (2008) · Computers & Operations Research · doi:10.1016/j.cor.2008.03.010 · Cited by 27
Cited by
Lean Manufacturing: Trends and Implementation Issues
Duraković, B., Demir, R., Abat, K., & Emek, C. (2018) · Periodicals of Engineering and Natural Sciences (PEN) · doi:10.21533/pen.v6.i1.1697 · Cited by 71
A phase-wise approach to implement lean manufacturing
Chauhan, G., & Chauhan, V. (2019) · International Journal of Lean Six Sigma · doi:10.1108/ijlss-09-2017-0110 · Cited by 66
S, S., Chakraborty, P. S., S, N., & V, K. (2023) · International Journal of Mechanical Engineering · doi:10.14445/23488360/ijme-v10i8p104 · Cited by 5
Metadata
- Authors
- Sundar, R., Balaji, A. N., & Kumar, R. M. S.
- Venue
- Procedia Engineering
- Publisher
- Elsevier BV
- Published
- 2014
- Volume
- 97
- Pages
- 1875-1885
- ISSN
- 1877-7058 (ISSN-L)
- OpenAlex
- W2077342641
- Cited by
- 456
- References
- 23
- FWCI
- 17.61
- Type
- conference paper
- Language
- en
- Open access
- diamond
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.