Abstract
This paper refers to the management of the construction and demolition (C&D) waste since, according to the EU Waste Strategy, C&D waste is considered to be one of the priority waste streams and appropriate actions need to be taken with respect to its effective management. Initially, the paper presents the state-of-the-art of the problem of C&D waste, including the amount and composition of C&D waste in EU countries, differences in the characteristics of this waste stream depending on its origin, as well as collection and management practices that are applied. A methodology is described for the estimation of the quantities of the waste stream under examination, since in most cases quantitative primary data is not available. Next, the fundamentals for the development of an integrated scheme for the management of C&D waste are presented and discussed, such as appropriate demolition procedures and location of waste management (off-site waste management, on-site waste management, direct on-site recovery, centralized on-site recovery). Finally, taking into consideration all relevant parameters, alternative systems that could be applied for the management of the C&D waste are suggested.
Overview
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
In the citing paper
“Therefore, during the demolition stage, the release of nanomaterials into the environment can be uncontrollable, and, hence, why strict standard demolition procedures need to be applied [66].”
From Nanoparticles in Construction Materials and Other Applications, and Implications of Nanoparticle Use (2019) · cites this paper as [66]
Citations
Cites
On-site sorting of construction and demolition waste in Hong Kong
Poon, C. S., Yu, A. T. W., & Ng, L. H. (2001) · Resources, Conservation and Recycling · doi:10.1016/s0921-3449(01)00052-0 · Cited by 431 · cited 3×
“According to this method, the demolition is evolved from the roof to the ground going down floor by floor (Poon et al. 2001).”
BackgroundMethodInfluentialEnvironmental management of construction and demolition waste in Kuwait
Kartam, N., Al-Mutairi, N., Al-Ghusain, I., & Al-Humoud, J. (2004) · Waste Management · doi:10.1016/j.wasman.2004.06.003 · Cited by 310 · cited 1×
“More importantly, at places where the disposal costs are low, the transport costs are high and the prices of raw and secondary materials are almost the same, the viability of a recycling centre is rendered very difficult (Kartam et al. 2004).”
BackgroundStrategies for successful construction and demolition waste recycling operations
Peng, C.-L., Scorpio, D. E., & Kibert, C. J. (1997) · Construction Management and Economics · doi:10.1080/014461997373105 · Cited by 291
Management of construction waste in public housing projects in Hong Kong
Poon, C. S., Yu, A. T. W., Wong, S. W., & Cheung, E. (2004) · Construction Management and Economics · doi:10.1080/0144619042000213292 · Cited by 218 · cited 3×
“The steps of conventional demolition are identified in the following list (Poon et al. 2004a).”
BackgroundGeneration and management of construction and demolition waste in Greece—an existing challenge
Fatta, D., Papadopoulos, A., Avramikos, E., Sgourou, E., Moustakas, K., Kourmoussis, F., Mentzis, A., & Loizidou, M. (2003) · Resources, Conservation and Recycling · doi:10.1016/s0921-3449(03)00035-1 · Cited by 215 · cited 1×
“Next, an indicative mathematical model for the estimation of the generated quantities of C&D waste, which has been developed by the NTUA, is presented (NTUA 2002, Fatta et al. 2003).”
MethodSelf-citationRecycling of construction and demolition waste via a mechanical sorting process
Huang, W.-L., Lin, D.-H., Chang, N.-B., & Lin, K.-S. (2002) · Resources, Conservation and Recycling · doi:10.1016/s0921-3449(02)00053-8 · Cited by 179
Minimizing demolition wastes in Hong Kong public housing projects
Poon, C. S., Yu, A. T. W., See, S. C., & Cheung, E. (2004) · Construction Management and Economics · doi:10.1080/0144619042000213283 · Cited by 74 · cited 3×
“The steps of conventional demolition are identified in the following list (Poon et al. 2004a).”
BackgroundMaterial Balance of a Construction Waste Sorting Plant
Brunner, P. H., & Stämpfli, D. M. (1993) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x9301100104 · Cited by 50 · cited 1×
“Recycling centres are characterized by the heavy mechanical equipment and the high level of technology that is used at such type of installations (Brunner & Stampfli 1993, Peng et al. 1997, Huang et al. 2002).”
BackgroundMaterial Balance of a Construction Waste Sorting Plant
Brunner, P. H. (1993) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1006/wmre.1993.1005 · Cited by 31
Developing and Inclusive Model for Design for Deconstruction
Crowther, P. (2001) · Faculty of Built Environment and Engineering · Cited by 15
Research works printed but not linked: 13
- Abdullah, A., Deconstruction and Materials Reuse. Proceedings of the 11th Rinker International Conference
- Bringezu, S., 1998, Material flows-construction materials and packaging. Sub-group meeting on statistics on scare and hazardous material of the working group `statistics of the environment'
- Crowther, P., Deconstruction and Materials Reuse: Technology, Economic, and Policy, Proceedings of the CIB Task Group 39 - Deconstruction Meeting, CIB World Building Congress
- Donovan, C.T., 1991, Resource Recycling, 146
- European Community (EC), 2001, Sixth Environment Action Programme of the 2001-2010 (Sixth EAP): Environment 2010: Our future, Our Choice
- European Environmental Agency (EEA), 2002, Review of Selected Waste Streams. Technical Report N.69
- John, V.M., CIB World Building Congress
- Nakajima, S., 2000, The state of deconstruction in Japan
- Ntua, 2002, Report to Eurostat. Collection of Data related to the waste produced by (i) Constructions, demolitions and excavations and (ii) Mining, quarrying activities, grinding and milling for Greece
- Pasxali, K., 2005, Techno economic study report of the national Cypriot project: "Provision of consultant services for the preparation of environmental, land planning, techno economic and feasibility study for the construction of integrated C&D waste management facilities at the municipalities of Leukosia, Larnaka and Ammoxostos"
- Schultmann, F., 2000, The state of deconstruction in Germany
- Seemann, A., Design for Deconstruction and Materials Reuse, Proceedings of the CIB Task Group 39 - Deconstruction Meeting
- Symonds Group Ltd., 1999, Consulting Engineers and Planners and PRC Bouwcentrum
Cited by
Lee, J., Mahendra, S., & Alvarez, P. J. J. (2010) · ACS Nano · doi:10.1021/nn100866w · Cited by 750
Zhang, C., Hu, M., Di Maio, F., Sprecher, B., Yang, X., & Tukker, A. (2022) · Science of The Total Environment · doi:10.1016/j.scitotenv.2021.149892 · Cited by 514
Quantifying construction and demolition waste: An analytical review
Wu, Z., Yu, A. T. W., Shen, L., & Liu, G. (2014) · Waste Management · doi:10.1016/j.wasman.2014.05.010 · Cited by 400
Nanoparticles in Construction Materials and Other Applications, and Implications of Nanoparticle Use
Mohajerani, A., Burnett, L., Smith, J. V., Kurmus, H., Milas, J., Arulrajah, A., Horpibulsuk, S., & Abdul Kadir, A. (2019) · Materials · doi:10.3390/ma12193052 · Cited by 348
“Therefore, during the demolition stage, the release of nanomaterials into the environment can be uncontrollable, and, hence, why strict standard demolition procedures need to be applied [66].”
BackgroundA Spanish model for quantification and management of construction waste
Solís-Guzmán, J., Marrero, M., Montes-Delgado, M. V., & Ramírez-de-Arellano, A. (2009) · Waste Management · doi:10.1016/j.wasman.2009.05.009 · Cited by 359
Metadata
- Authors
- Kourmpanis, B., Papadopoulos, A., Moustakas, K., Stylianou, M., Haralambous, K. J., & Loizidou, M.
- Affiliations
- National Technical University of Athens (GR)
- Corresponding author
- Kourmpanis, B.
- Venue
- Waste Management & Research: The Journal for a Sustainable Circular Economy
- Publisher
- SAGE Publications
- Published
- 2008-06
- Volume
- 26
- Issue
- 3
- Pages
- 267-275
- ISSN
- 0734-242X (ISSN-L)
- 1096-3669
- OpenAlex
- W2144889409
- Cited by
- 128
- References
- 12
- Citations by year
- 2025: 5 · 2024: 9 · 2023: 7 · 2022: 8 · 2021: 11 · 2020: 7 · 2019: 12 · 2018: 5 · 2017: 10 · 2016: 11 · 2015: 4 · 2014: 7 · 2013: 9 · 2012: 7
- FWCI
- 14.95
- Type
- journal article
- Language
- en
- Open access
- green
- doi.org
- Licence
- other-oa
- journals.sagepub.com/page/policies/text-and-data-mining-license (tdm)
- Locations
- Waste Management & Research The Journal for a Sustainable Circular Economy (publishedVersion)
- PubMed (publishedVersion)
- DSpace - NTUA (National Technical University of Athens) (submittedVersion, other-oa)
- Kypseli (submittedVersion)
- Topics
- Physical Sciences › Engineering › Building and Construction › Recycled Aggregate Concrete Performance
- Physical Sciences › Environmental Science › Waste Management and Disposal › Municipal Solid Waste Management
- Physical Sciences › Engineering › Building and Construction › Recycling and utilization of industrial and municipal waste in materials production
- Keywords
- construction and demolition waste, waste management, on-site waste management, waste composition
- MeSH terms
- Construction Materials, European Union, Explosions, Waste Management
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Preliminary study for the management of construction and demolition waste. https://app.cochat.ai/papers/10.1177/0734242x07083344
- The paper
- Kourmpanis, B., Papadopoulos, A., Moustakas, K., Stylianou, M., Haralambous, K. J., & Loizidou, M. (2008). Preliminary study for the management of construction and demolition waste. Waste Management & Research: The Journal for a Sustainable Circular Economy. https://doi.org/10.1177/0734242x07083344
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.