Risk Management in Construction Projects: A Knowledge-based Approach
Open accessThe DOI matches its Crossref record; 24 of the 24 references it cites were found in a registry or an index.
Abstract
One of the major roles undertaken by a project manager is the management of the risk of a project. However, this duty is particularly complex and inefficient if good risk management has not been done from the beginning of the project. An effective and efficient risk management approach requires a proper and systematic methodology and, more importantly, knowledge and experience. Previous research results in Chile have shown that both, owners and contractors do not systematically apply risk management practices, resulting in negative consequences for projects’ performance. This paper addresses the problems of risk management in construction projects using a knowledge-based approach, and proposes a methodology based on a three-fold arrangement that includes the modeling of the risk management function, its evaluation, and the availability of a best practices model. This approach is part of a* research effort that is underway. A major preliminary conclusion of this research is the fact that risk management in construction projects is still very ineffective and that the main cause of this situation is the lack of knowledge. It is expected that the application of the proposed approach will allow clients and contractors to develop a project's risk management function based on best practices, and also to improve the performance of this function.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Alavi, M., & Leidner, D. E. (2001) · MIS Quarterly · doi:10.2307/3250961 · Cited by 10,176 · cited 2×
“Then this knowledge becomes information again once it is articulated and presented in the form of text, graphics, words, or other symbolic forms (Alavi and Leidner, 2001).”
Modelling global risk factors affecting construction cost performance
Baloi, D., & Price, A. D. F. (2003) · International Journal of Project Management · doi:10.1016/s0263-7863(02)00017-0 · Cited by 587 · cited 5×
“Risk is a multifaceted concept (Wang et al, 2004), which is defined as the probability of a damaging event occurring in the project, affecting its objectives (Yu, 2002; Baloi and Price, 2003) however not always associated with negative results.”
InfluentialRisk assessment and allocation in the UAE construction industry
El-Sayegh, S. M. (2008) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.07.004 · Cited by 468 · cited 1×
“…et al, 2008) given that construction projects are exposed to risk at the time of their coming into existence (Schieg, 2006) and are perceived to have more inherent risk due to the involvement of many contracting parties such as owners, contractors and designers, among others (El-Sayegh, 2008).”
Risk management framework for construction projects in developing countries
Wang, S. Q., Dulaimi, M. F., & Aguria, M. Y. (2004) · Construction Management and Economics · doi:10.1080/0144619032000124689 · Cited by 445 · cited 1×
“Risk is a multifaceted concept (Wang et al, 2004), which is defined as the probability of a damaging event occurring in the project, affecting its objectives (Yu, 2002; Baloi and Price, 2003) however not always associated with negative results.”
COMMENTARY ON THE INTERNATIONAL STANDARD ISO 31000–2009 “RISK MANAGEMENT. PRINCIPLES AND GUIDELINES”
Pletneva, N. P. (2014) · Spravochnik. Inzhenernyi zhurnal · doi:10.14489/hb.supp.2014.07.pp.001-016 · Cited by 358
Project risk management in the Queensland engineering construction industry: a survey
Lyons, T., & Skitmore, M. (2004) · International Journal of Project Management · doi:10.1016/s0263-7863(03)00005-x · Cited by 340 · cited 1×
“For example, Lyons and Skitmore (2004) found that brainstorming is the most common risk identification techniques used in the Queensland engineering construction industry, and that the qualitative methods of risk assessment are used most frequently, ahead of quantitative and semi-qualitative…”
Large engineering project risk management using a Bayesian belief network
Lee, E., Park, Y., & Shin, J. G. (2008) · Expert Systems with Applications · doi:10.1016/j.eswa.2008.07.057 · Cited by 338 · cited 1×
“Then, the main purpose of project’s risk management is to identify, evaluate, and control the risk for project success (Lee et al, 2009).”
Knowledge Management in UK Construction: Strategies, Resources and Barriers
Carrillo, P. M., Robinson, H. S., Al‐Ghassani, A. M., & Anumba, C. J. (2004) · Project Management Journal · doi:10.1177/875697280403500105 · Cited by 308 · cited 1×
“The construction industry is a knowledge-based industry (Egbu et al. 2004; Carrillo et al., 2004) because the execution of construction activities requires specialized expert knowledge and problem-solving know-how (Anumba et al., 2005).”
Exploiting Knowledge Management: The Engineering and Construction Perspective
Carrillo, P. M., & Chinowsky, P. S. (2005) · Journal of Management in Engineering · doi:10.1061/(asce)0742-597x(2006)22:1(2 · Cited by 284 · cited 4×
“Therefore, the implementation of knowledge management is particularly interesting for the construction sector (Carrillo and Chinowsky, 2006), because this approach could help the industry to innovate, improve performance (Kamara et al. 2002) (Egbu et al, 2004), and to better handle their particular…”
InfluentialRisk and its management in the Kuwaiti construction industry: a contractors’ perspective
Kartam, N. A., & Kartam, S. A. (2001) · International Journal of Project Management · doi:10.1016/s0263-7863(00)00014-4 · Cited by 249
In search of opportunity management: Is the risk management process enough?
Olsson, R. (2007) · International Journal of Project Management · doi:10.1016/j.ijproman.2007.03.005 · Cited by 214 · cited 2×
“There is uncertainty in everyday life, in organizations and projects (Olsson, 2007), representing a clear threat to the business, but also in itself is a significant opportunity that must be taken (Hillson, 2011).”
Organizational knowledge and the manufacturing strategy process: A resource‐based view analysis
Paiva, E. L., Roth, A. V., & Fensterseifer, J. E. (2008) · Journal of Operations Management · doi:10.1016/j.jom.2007.05.003 · Cited by 201 · cited 1×
“Nonaka and Takeuchi (1999) also indicated that knowledge is strongly linked to people’s beliefs and commitments, essentially related to human action in a way that adds value to the enterprise (Paiva et al., 2007; Vail, 1999).”
Knowledge Management in Construction
(2005) · Wiley eBooks · doi:10.1002/9780470759554 · Cited by 195
RISK MANAGEMENT IN CONSTRUCTION PROJECT MANAGEMENT
Schieg, M. (2006) · Journal of Business Economics and Management · doi:10.3846/16111699.2006.9636126 · Cited by 194
Financial Risk and the Need for Superior Knowledge Management
Marshall, C., Prusak, L., & Shpilberg, D. (1996) · California Management Review · doi:10.2307/41165844 · Cited by 178 · cited 1×
“According to Marshall and Prusak (1996), studies of failures of risk management suggest three underlying causes: dysfunctional culture, unmanaged organizational knowledge, and ineffective controls.”
Knowledge Mapping: Getting Started with Knowledge Management
Vail, E. F. (1999) · Information Systems Management · doi:10.1201/1078/43189.16.4.19990901/31199.3 · Cited by 170 · cited 1×
“Nonaka and Takeuchi (1999) also indicated that knowledge is strongly linked to people’s beliefs and commitments, essentially related to human action in a way that adds value to the enterprise (Paiva et al., 2007; Vail, 1999).”
Knowledge-Based Approach to Construction Project Risk Management
Tah, J. H. M., & Carr, V. (2001) · Journal of Computing in Civil Engineering · doi:10.1061/(asce)0887-3801(2001)15:3(170 · Cited by 166 · cited 3×
“The systems used for project risk management have their focus on quantitative risk analysis, but these techniques do not allow that risks, problems, remedial measures and lessons learned from previous projects be captured and reused when developing new projects (Tah and Carr, 2001).”
InfluentialKnowledge management in the architecture, engineering and construction industry
Kamara, J. M., Augenbroe, G., Anumba, C., et al. (2002) · Construction Innovation · doi:10.1191/1471417502ci026oa · Cited by 136
Knowledge management and its relationship with TQM
Hsu, S.-H., & Shen, H.-P. (2005) · Total Quality Management & Business Excellence · doi:10.1080/14783360500054111 · Cited by 132 · cited 1×
“Hsu and Shen (2005) describes knowledge management as a systematic and organized approach to improve the organization’s ability to mobilize knowledge to enhance decision making, take actions and deliver results in support of the underlying business strategy.”
Project Management Maturity Model (PMMM) in educational organizations
Demir, C., & Kocabaş, İ. (2010) · Procedia - Social and Behavioral Sciences · doi:10.1016/j.sbspro.2010.12.379 · Cited by 106
Perceptions of owners in German construction projects: congruence with project risk theory
Bryde, D., & Volm, J. M. (2009) · Construction Management and Economics · doi:10.1080/01446190903222403 · Cited by 53
Maturity model of Knowledge Management in the interpretativist perspective
Édgar Serna, M. (2012) · International Journal of Information Management · doi:10.1016/j.ijinfomgt.2011.12.001 · Cited by 39 · cited 1×
“A maturity model is of evolutionary nature, that is, consist of a number of stages in which the complexity level is increased from one to another in the searching for perfection (Serna, 2012).”
Project, systems and risk management processes interactions
Alali, B., & Pinto, A. C. (2009) · Portland International Conference on Management of Engineering and Technology (PICMET) · doi:10.1109/picmet.2009.5261999 · Cited by 13 · cited 1×
“This is a key process and most of project managers know that risk management is essential for good project management (Baloi and Price, 2003; Perera and Holsomback, 2005; Alali and Pinto, 2009).”
Before and after modelling: risk knowledge management is required
Rodríguez, E., & Edwards, J. S. (2008) · Aston Publications Explorer (Aston University) · Cited by 12
Metadata
- Authors
- Serpella, A. F., Ferrada, X., Howard, R., & Rubio, L.
- Venue
- Procedia - Social and Behavioral Sciences
- Publisher
- Elsevier BV
- Published
- 2014-03
- Volume
- 119
- Pages
- 653-662
- ISSN
- 1877-0428 (ISSN-L)
- OpenAlex
- W2023864955
- Cited by
- 164
- References
- 24
- FWCI
- 12.43
- Type
- conference paper
- Language
- en
- Open access
- diamond
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.