The DOI matches its Crossref record.
Modelling global risk factors affecting construction cost performance
Open accessAbstract
Abstract This paper discusses the core issues of global risk factors modelling, assessment and management. The research reported upon forms part of a larger study that aims to develop a fuzzy decision framework for contractors to handle global risk factors affecting construction cost performance at a project level. Major global risk factors affecting cost performance were identified through an extensive literature review and preliminary discussions with construction contractors. The main decision perspectives namely normative and behavioural were explored. Different decision-making technologies, both classical and emergent, such as classical management science techniques and DSSs, KBSs were explored and evaluated. Preliminary indications show that Fuzzy Set Theory is a viable technology for modelling, assessing and managing global risk factors affecting construction cost performance and thus a fuzzy decision framework for risk management can be successfully developed.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cited by
Olawale, Y. A., & Sun, M. (2010) · Construction Management and Economics · doi:10.1080/01446191003674519 · Cited by 478
Towards a better modelling and assessment of construction risk: Insights from a literature review
Taroun, A. (2014) · International Journal of Project Management · doi:10.1016/j.ijproman.2013.03.004 · Cited by 387
Eybpoosh, M., Dikmen, I., & Talat Birgonul, M. (2011) · Journal of Construction Engineering and Management · doi:10.1061/(asce)co.1943-7862.0000382 · Cited by 217
Islam, M. S., Nepal, M. P., Skitmore, M., & Attarzadeh, M. (2017) · Advanced Engineering Informatics · doi:10.1016/j.aei.2017.06.001 · Cited by 163
Valipour, A., Yahaya, N., Md Noor, N., Kildienė, S., Sarvari, H., & Mardani, A. (2015) · Journal of Civil Engineering and Management · doi:10.3846/13923730.2015.1051104 · Cited by 111
Metadata
- Authors
- Baloi, D., & Price, A. D. F.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2003-05
- Volume
- 21
- Issue
- 4
- Pages
- 261-269
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2092066568
- Cited by
- 587
- References
- 0
- FWCI
- 7.24
- Type
- journal article
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Modelling global risk factors affecting construction cost performance. https://app.cochat.ai/papers/10.1016/s0263-7863(02)00017-0
- The paper
- Baloi, D., & Price, A. D. F. (2003). Modelling global risk factors affecting construction cost performance. International Journal of Project Management. https://doi.org/10.1016/s0263-7863(02)00017-0
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.