The DOI matches its Crossref record; 65 of the 65 references it cites were found in a registry or an index.
The Influence of Organizational External Factors on Construction Risk Management among Nigerian Construction Companies
Open accessAbstract
BACKGROUND: Substantial empirical research has shown conflicting results regarding the influence of organizational external factors on construction risk management, suggesting the necessity to introduce a moderator into the study. The present research confirmed whether rules and regulations matter on the relationships between organizational external factors and construction risk management. METHODS: Based on discouragement and organizational control theory, this research examined the effects of organizational external factors and rules and regulations on construction risk management among 238 employees operating in construction companies in Abuja and Lagos, Nigeria. A personally administered questionnaire was used to acquire the data. The data were analyzed using partial least squares structural equation modeling. RESULTS: A significant positive relationship between organizational external factors and construction risk management was asserted. This study also found a significant positive relationship between rules and regulations and construction risk management. As anticipated, rules and regulations were found to moderate the relationship between organizational external factors and construction risk management, with a significant positive result. Similarly, a significant interaction effect was also found between rules and regulations and organizational external factors. Implications of the research from a Nigerian point of view have also been discussed. CONCLUSION: Political, economy, and technology factors helped the construction companies to reduce the chance of risk occurrence during the construction activities. Rules and regulations also helped to lessen the rate of accidents involving construction workers as well as the duration of the projects. Similarly, the influence of the organizational external factors with rules and regulations on construction risk management has proven that most of the construction companies that implement the aforementioned factors have the chance to deliver their projects within the stipulated time, cost, and qualities, which can be used as a yardstick to measure a good project.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
The check wasn’t confident either way, so it gives no verdict — never disputed.
In the citing paper
“One of the limitations of SEM is that it does not assume the uncertainty and stochastic behavior of events [34]; therefore, it has limited applications for complex projects under high uncertainty [1].”
From Cost Overrun Risk Assessment and Prediction in Construction Projects: A Bayesian Network Classifier Approach (2022) · cites this paper as [34]
Experimental — accuracy not yet measured
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Evaluating Structural Equation Models with Unobservable Variables and Measurement Error
Fornell, C., & Larcker, D. F. (1981) · Journal of Marketing Research · doi:10.2307/3151312 · Cited by 109,314
Evaluating structural equation models with unobservable variables and measurement error
Fornell, C., & Larcker, D. F. (1981) · Journal of Marketing Research · doi:10.1177/002224378101800104 · Cited by 109,190
Herne, H., Cooley, W. W., & Lohnes, P. R. (1973) · Journal of the Royal Statistical Society Series A (General) · doi:10.2307/2344428 · Cited by 35,801
On the Evaluation of Structural Equation Models
Bagozzi, R. P., & Yi, Y. (1988) · Journal of the Academy of Marketing Science · doi:10.1007/bf02723327 · Cited by 26,163
Pls-Sem: indeed a silver bullet
Hair, J. F., Ringle, C. M., & Sarstedt, M. (2011) · Journal of Marketing Theory and Practice · doi:10.2753/mtp1069-6679190202 · Cited by 21,631
(1998) · Cited by 12,725
\nThe use of partial least squares path modeling in international marketing
Henseler, J., Ringle, C. M., & Sinkovics, R. R. (2009) · Radboud Repository (Radboud University) · doi:10.1108/s1474-7979(2009)0000020014 · Cited by 12,535
Cross validatory choice and assessment of statistical predictions
Stone, M. (1974) · Journal of the Royal Statistical Society Series B: Statistical Methodology · doi:10.1111/j.2517-6161.1974.tb00994.x · Cited by 10,881
Hanrahan, G. (2008) · CRC Press eBooks · doi:10.1201/9781420067972-10 · Cited by 8,196
Modern Methods for Business Research
(1998) · doi:10.4324/9781410604385 · Cited by 6,534
Flagged first, then by citations
Research works printed but not linked: 4
- Abu Hassan, 2012, Evaluating risk management practices in construction company: evidence from Oman, Int J Acad Res, 42, 32
- Israelsson, 2009, Factors influencing flexibility in buildings, Struct Surv, 272, 138
- Ugochukwu, 2014, Participation of indigenous contractors in Nigerian public sector, construction projects and their challenges in managing working capital, Int J Civil Eng, 1, 1
- Barclay, 1995, The partial least squares (PLS) approach to causal modeling: personal computer adoption and use as an illustration, Technol Stud, 2, 285
Cited by
Sorted by citations
Items 101–107 of 107
Enhancing Construction Project Success: The Significance of Effective Risk Management
JaiSai, T., Muralidhar, P., Kore, S. D., & Deshpande, V. (2025) · Lecture notes in civil engineering · doi:10.1007/978-981-96-4902-0_13
Ahmed, S., Bahram, B., Razzaq, S., Dost, D., & Ali, M. (2025) · Construction technologies and architecture · doi:10.4028/p-mcn3wd
Management of Social network-Related Risks in Megaproject Supply Chains in Africa
Kadan, R., & Wium, J. A. (2025) · Engineering Management Journal · doi:10.1080/10429247.2025.2533796
Integrating human factors principles into construction project management techniques
Aruwajoye, A., Bommer, S., & Adeyemi, E. O. (2026) · International Journal of Construction Management · doi:10.1080/15623599.2026.2619668
Construction Projects in Saudi Arabia: Risk Analysis
Rashid, Y., Maqbool, R., Mansoor, S., Altuwaim, A. A., & Saiba, M. R. (2026) · Springer eBooks · doi:10.1007/978-3-031-94316-4_12
Theoretical and Conceptual Framework
Panday, P. K., & Ahsan, A. H. M. K. (2026) · Springer eBooks · doi:10.1007/978-981-95-6631-0_2
Sihombing, M., Syairudin, B., Asy’ari, M. K., Mu’min, H., & Sam, T. H. (2026) · SSRN Electronic Journal · doi:10.2139/ssrn.7243122
Metadata
- Authors
- Adeleke, A. Q., Bahaudin, A. Y., Kamaruddeen, A. M., Bamgbade, J. A., Salimon, M. G., Khan, M. W. A., & Sorooshian, S.
- Affiliations
- Universiti Malaysia Pahang Al-Sultan Abdullah (MY)
- Universiti Utara Malaysia (MY)
- University of Technology Sarawak (MY)
- Swinburne University of Technology (AU)
- Corresponding author
- Adeleke, A.Q.
- ORCID
- Venue
- Safety and Health at Work
- Publisher
- Elsevier BV
- Published
- 2018-03
- Volume
- 9
- Issue
- 1
- Pages
- 115-124
- ISSN
- 2093-7911 (ISSN-L)
- PMC
- PMC6111111
- OpenAlex
- W2620647389
- Cited by
- 107
- References
- 65
- Citations by year
- 2026: 4 · 2025: 4 · 2024: 12 · 2023: 19 · 2022: 14 · 2021: 16 · 2020: 17 · 2019: 15 · 2018: 6
- FWCI
- 9.20
- Type
- journal article
- Language
- en
- Open access
- gold
- doi.org
- Licence
- Locations
- Safety and Health at Work (publishedVersion, cc-by-nc-nd)
- Europe PMC (PubMed Central) (publishedVersion, cc-by-nc-nd)
- PubMed Central (publishedVersion, cc-by-nc-nd)
- PubMed (publishedVersion)
- Universiti Utara Malaysia Institutional Repository (Universiti Utara Malaysia) (acceptedVersion)
- UMP Institutional Repository (Universiti Malaysia Pahang) (acceptedVersion)
- DOAJ (DOAJ: Directory of Open Access Journals) (submittedVersion, cc-by-sa)
- Figshare (submittedVersion, cc-by-nc-nd)
- Swinburne figshare (Swinburne University of Technology) (submittedVersion, cc-by-nc-nd)
- Swinburne figshare (Swinburne University of Technology)
- Topics
- Social Sciences › Decision Sciences › Management Science and Operations Research › Construction Project Management and Performance
- Social Sciences › Safety Research › Occupational Health and Safety Research
- Physical Sciences › Engineering › Civil and Structural Engineering › Construction Engineering and Safety
- Keywords
- construction risk management, rules and regulations, organizational control theory, political factors, economic factors, technological factors, construction companies, project duration, Nigeria
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review