The DOI matches its Crossref record; 13 of the 13 references it cites were found in a registry or an index.
On the effectiveness in implementing a waste-management-plan method in construction
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Implementation of environmental management in the Hong Kong construction industry
Shen, L. Y., & Tam, V. W. Y. (2002) · International Journal of Project Management · doi:10.1016/s0263-7863(01)00054-0 · Cited by 367
Self-citationISO 14000 : a Guide to the New Environmental Management Standards
Stoss, F. W. (1996) · Electronic Green Journal · doi:10.5070/g31610261 · Cited by 222
Management of construction waste in public housing projects in Hong Kong
Poon, C. S., Yu, A. T. W., Wong, S. W., & Cheung, E. (2004) · Construction Management and Economics · doi:10.1080/0144619042000213292 · Cited by 218
Implementing a waste management plan during the construction phase of a project: a case study
McDonald, B. B., & Smithers, M. (1998) · Construction Management and Economics · doi:10.1080/014461998372600 · Cited by 159
Environmental performance measurement indicators in construction
Tam, V. W. Y., Tam, C. M., Zeng, S., & Chan, K. (2005) · Building and Environment · doi:10.1016/j.buildenv.2005.01.009 · Cited by 145
Self-citationMANAGEMENT AND RECYCLING OF DEMOLITION WASTE IN HONG KONG
Poon, C. S. (1997) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1006/wmre.1996.0111 · Cited by 136
KEIN, A. T. T., Ofori, G., & BRIFFETT, C. (1999) · Construction Management and Economics · doi:10.1080/014461999371376 · Cited by 118
Use of Prefabrication to Minimize Construction Waste - A Case Study Approach
Tam, C. M., Tam, V. W. Y., Chan, J. K. W., & Ng, W. C. Y. (2005) · International Journal of Construction Management · doi:10.1080/15623599.2005.10773069 · Cited by 116
Self-citationWaste management issues for the UK ready-mixed concrete industry
Sealey, B. J., Phillips, P. S., & Hill, G. (2001) · Resources Conservation and Recycling · doi:10.1016/s0921-3449(01)00069-6 · Cited by 114
Cutting Construction Wastes by Prefabrication
Tam, V. W. Y., Tam, C. M., Chan, J. K. W., & Ng, W. C. Y. (2006) · International Journal of Construction Management · doi:10.1080/15623599.2006.10773079 · Cited by 95
Self-citation
Cited by
Kabirifar, K., Mojtahedi, M., Wang, C., & Tam, V. W. Y. (2020) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2020.121265 · Cited by 695
Self-citationTrend of the research on construction and demolition waste management
Yuan, H., & Shen, L. (2011) · Waste Management · doi:10.1016/j.wasman.2010.10.030 · Cited by 574
Shen, L.-Y., Tam, V. W. Y., Tam, L., & Ji, Y.-B. (2010) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2009.10.014 · Cited by 426
Self-citationJin, R., Li, B., Zhou, T., Wanatowski, D., & Piroozfar, P. (2017) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2017.07.034 · Cited by 401
Quantifying construction and demolition waste: An analytical review
Wu, Z., Yu, A. T. W., Shen, L., & Liu, G. (2014) · Waste Management · doi:10.1016/j.wasman.2014.05.010 · Cited by 400
Metadata
- Authors
- Tam, V. W. Y.
- Venue
- Waste Management
- Publisher
- Elsevier BV
- Published
- 2008
- Volume
- 28
- Issue
- 6
- Pages
- 1072-1080
- ISSN
- 0956-053X (ISSN-L)
- OpenAlex
- W1963712024
- Cited by
- 263
- References
- 13
- FWCI
- 13.13
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: On the effectiveness in implementing a waste-management-plan method in construction. https://app.cochat.ai/papers/10.1016/j.wasman.2007.04.007
- The paper
- Tam, V. W. Y. (2008). On the effectiveness in implementing a waste-management-plan method in construction. Waste Management. https://doi.org/10.1016/j.wasman.2007.04.007
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.