Factors influencing temporary wood waste generation in high-rise building construction
Abstract
In Brazil, the use of wood in construction is primarily temporary, and it can represent a great percentage of construction waste. It is typically discarded with minimal reuse or recycling. As landfill wood disposal could result in methane emissions and/or leaching of hazardous constituents polluting water or soil, the implementation of temporary wood waste reduction strategies must be a critical issue for local construction companies. To manage and control wood waste generation, including setting some reduction goals, it is necessary to identify the influencing factors and ways to quantitatively predict their relative contributions. This study uses a multiple regression statistical model to estimate the amount of temporary wood waste generated in the construction of high-rise buildings by considering the influencing factors related to the design/construction as well as site and safety installations. The case study includes 22 high-rise residential buildings. The regression model predicted approximately 89% of the factors involved in the generation of wood waste in similar constructions. The dependent variables that had an influence on the amount of wood waste are related to design features ('number of floors'), structural construction system ('in situ moulded concrete volume'), and site and safety installations ('site wood fence' and 'wood use rate'). Ways of minimising wood waste generation and the contributions of each type of temporary wood use were discussed.
Integrity signals
Registry
Cites
Statistics
Claims the paper makes
Claims other papers make about this one
Each is checked against this paper’s own text: does it say what the citing paper says it does?
The future potential of wood waste recycling is quite low, mainly lacking sustainable reuse or recycling applications.
“the future potential of WW recycling is quite low, mainly lacking sustainable reuse or recycling applications”
Cites
Herne, H., Cooley, W. W., & Lohnes, P. R. (1973) · Journal of the Royal Statistical Society Series A (General) · doi:10.2307/2344428 · Cited by 35,801 · see citing works
Mishra, S., & Datta‐Gupta, A. (2017) · Elsevier eBooks · doi:10.1016/b978-0-12-803279-4.00005-5 · Cited by 3,032 · see citing works
Jaillon, L. C., Poon, C. S., & Chiang, Y. H. (2008) · Waste Management · doi:10.1016/j.wasman.2008.02.015 · Cited by 592 · see citing works
A model for quantifying construction waste in projects according to the European waste list
Llatas, C. (2011) · Waste Management · doi:10.1016/j.wasman.2011.01.023 · Cited by 326 · see citing works
Reducing building waste at construction sites in Hong Kong
Poon, C. S., Yu, A. T. W., & Jaillon, L. C. (2004) · Construction Management and Economics · doi:10.1080/0144619042000202816 · Cited by 298 · see citing works
Lu, W., Yuan, H., Li, J., Hao, J. J. L., Mi, X., & Ding, Z. (2011) · Waste Management · doi:10.1016/j.wasman.2010.12.004 · Cited by 266 · see citing works
Construction and demolition waste indicators
Mália, M., de Brito, J., Pinheiro, M. D., & Bravo, M. (2013) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x12471707 · Cited by 213 · see citing works
Projection of Construction and Demolition Waste in Norway
Bergsdal, H., Bohne, R. A., & Brattebø, H. (2007) · Journal of Industrial Ecology · doi:10.1162/jiec.2007.1149 · Cited by 197 · see citing works
A model for estimating construction waste generation index for building project in China
Li, J., Ding, Z., Mi, X., & Wang, J. (2013) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2013.02.015 · Cited by 172 · see citing works
A novel methodology to estimate the evolution of construction waste in construction sites
Katz, A., & Baum, H. (2010) · Waste Management · doi:10.1016/j.wasman.2010.01.008 · Cited by 155 · see citing works
Wang, L., Chen, S. S., Tsang, D. C. W., Poon, C. S., & Shih, K. (2016) · Construction and Building Materials · doi:10.1016/j.conbuildmat.2016.08.053 · Cited by 147 · see citing works
Lachimpadi, S. K., Pereira, J. J., Taha, M. R., & MOKHTAR, M. B. (2012) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2012.08.011 · Cited by 135 · see citing works
Kern, A. P., Morales, M. F. D., Kulakowski, M. P., & Gomes, L. P. (2015) · Waste Management · doi:10.1016/j.wasman.2015.01.043 · Cited by 122 · see citing works
Self-citationA web-based Decision Support System for the optimal management of construction and demolition waste
Banias, G., Achillas, C., Vlachokostas, C., et al. (2011) · Waste Management · doi:10.1016/j.wasman.2011.07.018 · Cited by 122 · see citing works
Use of Prefabrication to Minimize Construction Waste - A Case Study Approach
Tam, C. M., Tam, V. W. Y., Chan, J. K. W., & Ng, W. C. Y. (2005) · International Journal of Construction Management · doi:10.1080/15623599.2005.10773069 · Cited by 116 · see citing works
Sáez, P. V., Merino, M. D. R., & Porras-Amores, C. (2011) · Waste Management & Research The Journal for a Sustainable Circular Economy · doi:10.1177/0734242x11423955 · Cited by 116 · see citing works
Waste Generation and Recycling: Comparison of Conventional and Industrialized Building Systems
Begum, R. A., Satari, S. K., & Pereira, J. J. (2010) · American Journal of Environmental Sciences · doi:10.3844/ajessp.2010.383.388 · Cited by 99 · see citing works
Kim, S., Choi, Y.-K., Park, K.-W., & Kim, J. T. (2010) · Bioresource Technology · doi:10.1016/j.biortech.2010.03.059 · Cited by 44 · see citing works
Leaching characteristics of CCA-treated wood waste: A UK study
Mercer, T. G., & Frostick, L. E. (2012) · The Science of The Total Environment · doi:10.1016/j.scitotenv.2012.04.008 · Cited by 40 · see citing works
Wang, L., Yu, I. K. M., Tsang, D. C. W., Li, S., & Poon, C. S. (2017) · Industrial & Engineering Chemistry Research · doi:10.1021/acs.iecr.7b01175 · Cited by 31 · see citing works
Recycling of Contaminated Construction and Demolition Wood Waste
Rautkoski, H., Vähä-Nissi, M., Kataja, K., Gestranius, M., Liukkonen, S., Määttänen, M., Liukkonen, J., Kouko, J., & Asikainen, S. (2016) · Waste and Biomass Valorization · doi:10.1007/s12649-016-9481-9 · Cited by 24 · see citing works
Resources of post-consumer wood waste originating from the construction sector in Poland
Ratajczak, E., Bidzińska, G., Szostak, A., et al. (2015) · Resources Conservation and Recycling · doi:10.1016/j.resconrec.2015.02.008 · Cited by 23 · see citing works
Kim, H. D., & Townsend, T. G. (2007) · Chemosphere · doi:10.1016/j.chemosphere.2006.08.039 · Cited by 6 · see citing works
Wood wastes and residues generated along the Colorado Front Range as a potential fuel source
Ward, J. E., Mackes, K., & Lynch, D. L. (2004) · doi:10.2737/rmrs-rp-50 · Cited by 6 · see citing works
EVALUATING ONSITE BENEFICIAL REUSE OF GROUND ENGINEERED WOOD WASTES FROM RESIDENTIAL CONSTRUCTION
Gaskin, J. W., Risse, L. M., Kastner, J. R., et al. (2005) · Transactions of the ASAE · doi:10.13031/2013.20007 · Cited by 5 · see citing works
Modelo para estimar a geração de resíduos na produção de obras residenciais verticais
Morales, M. F. D. (2013) · Americanae (AECID Library) · Cited by 3 · see citing works
Flagged first, then by citations
Research works printed but not linked: 1
- Workink together for a world without waste (WRAP), 2012. PAS 111:2012: Specification for the requirements and test methods for processing waste wood. England, pp. 40.
Cited by
Sorted by citations
Augaitis, N., Vaitkus, S., Członka, S., & Kairytė, A. (2020) · Materials · doi:10.3390/ma13235336 · Cited by 34 · see citing works
- Authors
- Kern, A. P., Amor, L. V., Angulo, S. C., & Montelongo, A.
- Affiliations
- Universidade do Vale do Rio dos Sinos (BR)
- Universidade Federal do Rio Grande do Sul (BR)
- ORCID
- Montelongo, Alfredo
- Venue
- Waste Management
- Publisher
- Elsevier BV
- Published
- 2018-08
- Volume
- 78
- Pages
- 446-455
- ISSN
- 0956-053X (ISSN-L)
- OpenAlex
- W2810484876
- Semantic Scholar
- 96f03dac3acdcb081c13c087003f791a03249057
- Cited by
- 43
- References
- 26
- Citations by year
- 2026: 1 · 2025: 11 · 2024: 5 · 2023: 5 · 2022: 10 · 2021: 4 · 2020: 3 · 2019: 3 · 2018: 1
- FWCI
- 2.16
- Type
- journal article
- Language
- en
- Open access
- closed
- Locations
- Waste Management (publishedVersion)
- PubMed (publishedVersion)
- Funders
- Conselho Nacional de Desenvolvimento CientÃfico e Tecnológico
- Topics
- Physical Sciences › Engineering › Building and Construction › Recycled Aggregate Concrete Performance
- Physical Sciences › Engineering › Civil and Structural Engineering › Construction Engineering and Safety
- Physical Sciences › Engineering › Building and Construction › BIM and Construction Integration
- Keywords
- high-rise building construction, construction waste generation, wood waste reduction, influencing factors, multiple linear regression, high-rise residential buildings, cast-in-place concrete, methane emissions, waste reduction
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review