CoChat

Separation studies of concrete and brick from construction and demolition waste

Hu, Kui, Chen, Yujing, Naz, Falak, Zeng, Changnv, Cao, Shihao · 2019 · Waste Management
Cited by 63

The DOI matches its Crossref record; 1 of the 1 references it cites were found in a registry or an index.

Overview

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1016/j.wasman.2019.01.007

Cites

1 of 1 references verified0 citation errors · 0 not checkable

Statistics

Verification

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.

A few free checks a day · papers already verified open instantly · results are public

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Citations

Cites

Research works printed but not linked: 32

  1. Abd Aziz, 2017, Pneumatic jigging: influence of operating parameters on separation efficiency of solid waste materials, Waste Manage. Res., 35, 647, 10.1177/0734242X17697815 · doi:10.1177/0734242x17697815
  2. Al-Fakih, 2019, Incorporation of waste materials in the manufacture of masonry bricks: an update review, J. Build. Eng., 21, 37, 10.1016/j.jobe.2018.09.023 · DOI · Paper page
  3. Ambros, 2017, Usage of air jigging for multi-component separation of construction and demolition waste, Waste Manage., 60, 75, 10.1016/j.wasman.2016.11.029 · DOI
  4. Boylu, 2014, Effect of fluidizing characteristics on upgrading of lignitic coals in gravity based air jig, Int. J. Miner. Process., 129, 27, 10.1016/j.minpro.2014.04.001 · doi:10.1016/j.minpro.2014.04.001
  5. Brozek, 2007, Effect of particle shape on jig separation efficiency, Physicochem. Probl. Miner. Process., 41, 397
  6. Cazacliu, 2014, The potential of using air jigging to sort recycled aggregates, J. Clean. Prod., 66, 46, 10.1016/j.jclepro.2013.11.057 · DOI
  7. Cierpisz, 2016, Monitoring of coal separation in a jig using a radiometric density meter, Measurement, 88, 147, 10.1016/j.measurement.2016.03.060 · doi:10.1016/j.measurement.2016.03.060
  8. Di Maria, 2016, Quality assessment for recycling aggregates from construction and demolition waste: an image-based approach for particle size estimation, Waste Manage., 48, 344, 10.1016/j.wasman.2015.12.005 · DOI
  9. Fatemi, 2016, Performance evaluation of recycled asphalt mixtures by construction and demolition waste materials, Constr. Build. Mater., 120, 450, 10.1016/j.conbuildmat.2016.05.117 · doi:10.1016/j.conbuildmat.2016.05.117
  10. Feil, 2012, Influence of jig frequency on the separation of coal from the Bonito seam – Santa Catarina, Brazil, Fuel Process. Technol., 96, 22, 10.1016/j.fuproc.2011.12.010 · doi:10.1016/j.fuproc.2011.12.010
  11. Hori, 2009, Optimum water pulsation of jig separation for crushed plastic particles, Int. J. Miner. Process., 92, 103, 10.1016/j.minpro.2009.01.001 · doi:10.1016/j.minpro.2009.01.001
  12. Huo, 2013, Mesh regeneration method for jig-shape optimization design of the high-aspect-ratio wing, Adv. Mech. Eng., 5, 5, 10.1155/2013/513637 · doi:10.1155/2013/513637
  13. Jankovic, 2012, Concrete paving blocks and flags made with crushed brick as aggregate, Constr. Build. Mater., 28, 659, 10.1016/j.conbuildmat.2011.10.036 · doi:10.1016/j.conbuildmat.2011.10.036
  14. Khabiri, 2010, The effect of stabilized subbase containing waste construction materials on reduction of pavement rutting depth, Electron. J. Geotech. Eng., 15, 1211
  15. Kurosaka, 2013, Strategy for controlling the hauling speed of the jigging machine for reducing the catch loss of neon flying squid Ommastrephes bartramii, Nippon Suisan Gakkaishi, 79, 327, 10.2331/suisan.79.327 · doi:10.2331/suisan.79.327
  16. Medina, 2015, Effect of the constituents (asphalt, clay materials, floating particles and fines) of construction and demolition waste on the properties of recycled concretes, Constr. Build. Mater., 79, 22, 10.1016/j.conbuildmat.2014.12.070 · DOI
  17. Nazemi, 2014, Design and implementation of integrated solid wastes management pattern in industrial zones, case study of Shahroud, Iran, J. Environ. Health Sci. Eng., 12
  18. Ossa, 2016, Use of recycled construction and demolition waste (CDW) aggregates: a sustainable alternative for the pavement construction industry, J. Clean. Prod., 135, 379, 10.1016/j.jclepro.2016.06.088 · DOI
  19. Ozalp, 2016, Effects of recycled aggregates from construction and demolition wastes on mechanical and permeability properties of paving stone, kerb and concrete pipes, Constr. Build. Mater., 110, 17, 10.1016/j.conbuildmat.2016.01.030 · DOI
  20. Pasandin, 2013, Laboratory evaluation of hot-mix asphalt containing construction and demolition waste, Constr. Build. Mater., 43, 497, 10.1016/j.conbuildmat.2013.02.052 · DOI
  21. Paul, 2018, Size by size separation characteristics of a coal cleaning jig, Trans. Indian Inst. Met., 71, 1439, 10.1007/s12666-018-1275-2 · doi:10.1007/s12666-018-1275-2
  22. Pielot, 2010, An analysis of effects of coal jigging after changes in the grain composition of a feed, Arch. Min. Sci., 55, 827
  23. Pita, 2016, Influence of shape and size of the particles on jigging separation of plastics mixture, Waste Manage., 48, 89, 10.1016/j.wasman.2015.10.034 · DOI
  24. Sampaio, 2008, Coal beneficiation of Candiota mine by dry jigging, Fuel Process. Technol., 89, 198, 10.1016/j.fuproc.2007.09.004 · doi:10.1016/j.fuproc.2007.09.004
  25. Sampaio, 2016, Stratification in air jigs of concrete/brick/gypsum particles, Constr. Build. Mater., 109, 63, 10.1016/j.conbuildmat.2016.01.058 · DOI
  26. Tripathy, 2016, Statistical optimization study of jigging process on beneficiation of fine size high ash Indian non-coking coal, Adv. Powder Technol., 27, 1219, 10.1016/j.apt.2016.04.006 · doi:10.1016/j.apt.2016.04.006
  27. Ulsen, 2013, Separability studies of construction and demolition waste recycled sand, Waste Manage., 33, 656, 10.1016/j.wasman.2012.06.018 · DOI
  28. Vegas, 2015, Upgrading the quality of mixed recycled aggregates from construction and demolition waste by using near-infrared sorting technology, Constr. Build. Mater., 75, 121, 10.1016/j.conbuildmat.2014.09.109 · DOI
  29. Voigt, 2012, Novel size and shape measurements applied to jig plant performance analysis, J. South Afr. Inst. Min. Metall., 112, 171
  30. Wang, 2015, The application of pneumatic jigging in the recovery of metallic fraction from shredded printed wiring boards, Waste Manage. Res., 33, 785, 10.1177/0734242X15589782 · doi:10.1177/0734242x15589782
  31. Wu, 2014, Quantifying construction and demolition waste: an analytical review, Waste Manage., 34, 1683, 10.1016/j.wasman.2014.05.010 · DOI · Paper page
  32. Xing, 2004, The quality improvement of stony construction and demolition waste (CDW), J. Wuhan Univ. Technol. – Master. Sci.Ed., 19, 78, 10.1007/BF02835068 · doi:10.1007/bf02835068

Metadata

Authors
Hu, K., Chen, Y., Naz, F., Zeng, C., & Cao, S.
ORCID
Hu, Kui
Venue
Waste Management
Publisher
Elsevier BV
Published
2019-02
Volume
85
Pages
396-404
ISSN
0956-053X
Cited by
63
References
1
Language
en
Licence
Funders
  • National Natural Science Foundation of China (51608045)
  • Foundation for Distinguished Young Talents of Henan University of Technology (2017BS035, 2018QNJH09)

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review

Data sources

Bibliographic data: Semantic Scholar, OpenAlex, Crossref.

Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).

Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.