Building demolition waste management through smart BIM: A case study in Hong Kong
The DOI matches its Crossref record; 13 of the 13 references it cites were found in a registry or an index.
Abstract
Hong Kong's construction industry, known for its massive building infrastructure, produces an enormous amount of waste every year, the vast majority of which is disposed for landfills. Therefore, some effective operational measures and waste management policies have been implemented. However, enormous waste remains a concern for stakeholders and exert pressure on the limited capacity of Hong Kong's landfills. Though previous research discusses Building Information Modelling (BIM) application for construction waste management enhancement, the BIM model has not been widely implemented for building demolition with waste management. Hence, as a response to the aforementioned shortcomings, this paper develops a conceptual framework that allows collecting, maintaining, and analyzing comprehensive information through Smart BIM that uses advanced technologies such as Internet of Things (IoT) and capable of reacting to user activities such as waste quantitative assessment, demolition process planning, optimal disposal route selection, and waste management strategy are executed. The advantages of the proposed framework are shown in a case study benefit-cost analysis based on three planned reuse and recycling-rate scenarios that explain on- and off-site recycling methods. The results show that the proposed framework will pave the way for generating sustainable waste disposal practices by providing technical and decision-making support functionalities to engineers and planners in the construction industry.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
A Design Science Research Methodology for Information Systems Research
Peffers, K., Tuunanen, T., Rothenberger, M. A., & Chatterjee, S. (2007) · Journal of Management Information Systems · doi:10.2753/mis0742-1222240302 · Cited by 7,832
Digital twin-driven product design, manufacturing and service with big data
Tao, F., Cheng, J., Qi, Q., Zhang, M., Zhang, H., & Sui, F. (2018) · The International Journal of Advanced Manufacturing Technology · doi:10.1007/s00170-017-0233-1 · Cited by 2,920
Pan, Y., & Zhang, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103517 · Cited by 1,336
Construction and demolition waste management in China through the 3R principle
Huang, B., Wang, X., Kua, H., Geng, Y., Bleischwitz, R., & Ren, J. (2018) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2017.09.029 · Cited by 1,047
Construction and demolition waste best management practice in Europe
Gálvez-Martos, J.-L., Styles, D., Schoenberger, H., & Zeschmar-Lahl, B. (2018) · Resources, Conservation and Recycling · doi:10.1016/j.resconrec.2018.04.016 · Cited by 816
Yeheyis, M., Hewage, K., Alam, M. S., Eskicioglu, C., & Sadiq, R. (2013) · Clean Technologies and Environmental Policy · doi:10.1007/s10098-012-0481-6 · Cited by 640
Yuan, H., Chini, A. R., Lu, Y., & Shen, L. (2012) · Waste Management · doi:10.1016/j.wasman.2011.11.006 · Cited by 205
The classification of construction waste material using a deep convolutional neural network
Davis, P., Aziz, F., Newaz, M. T., Sher, W., & Simon, L. (2021) · Automation in Construction · doi:10.1016/j.autcon.2020.103481 · Cited by 204
Park, J., & Tucker, R. (2017) · International Journal of Construction Management · doi:10.1080/15623599.2016.1192248 · Cited by 180
Evaluations of existing waste recycling methods: A Hong Kong study
Tam, V. W. Y., & Tam, C. M. (2006) · Building and Environment · doi:10.1016/j.buildenv.2005.06.017 · Cited by 173
Cited by
A Circular Built Environment in the Digital Age
(2024) · Circular Economy and Sustainability · doi:10.1007/978-3-031-39675-5 · Cited by 59
A review of drivers and barriers of Digital Twin adoption in building project development processes
Jahangir, M. F., Schultz, C. P. L., & Kamari, A. (2024) · Journal of Information Technology in Construction · doi:10.36680/j.itcon.2024.008 · Cited by 34
Wu, W., Yin, Y., Hao, J. L., Ma, W., Gong, G., & Yu, S. (2023) · Environmental Science and Pollution Research · doi:10.1007/s11356-023-29242-w · Cited by 12
Gómez-Gil, M., Askar, R., Karanafti, A., Trubina, N., Blázquez, T., Güngör, B., Bragança, L., & Leindecker, G. (2024) · Lecture Notes in Civil Engineering · doi:10.1007/978-3-031-57800-7_37 · Cited by 10
van Zandwijk, K., Donkers, A., Alkemade, F., Petrova, E., & Pauwels, P. (2026) · Technology in Society · doi:10.1016/j.techsoc.2026.103496 · Cited by 5
Metadata
- Authors
- Kang, K., Besklubova, S., Dai, Y., & Zhong, R. Y.
- Venue
- Waste Management
- Publisher
- Elsevier BV
- Published
- 2022-04
- Volume
- 143
- Pages
- 69-83
- ISSN
- 0956-053X (ISSN-L)
- OpenAlex
- W4214721647
- Cited by
- 116
- References
- 13
- FWCI
- 10.50
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.