Cited by 1,047Recycled Aggregate Concrete PerformanceMunicipal Solid Waste ManagementSustainable Supply Chain Management

Construction and demolition waste management in China through the 3R principle

Open access
Huang, Beijia, Wang, Xiangyu, Kua, Harnwei, Geng, Yong, Bleischwitz, Raimund, Ren, Jingzheng·2018·Resources, Conservation and Recycling

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Integrity signals

Registry

Crossref · 10.1016/j.resconrec.2017.09.029

Cites

1 of 1 references verified0 citation errors · 0 not checkable

Statistics

Claims the paper makes

The claims and statistics of this paper haven’t been checked yet.

Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.

A few free checks a day · papers already verified open instantly · results are public

Claims other papers make about this one

Each is checked against this paper’s own text: does it say what the citing paper says it does?

  • In the case of wood waste reusability, direct reuse may not always be accepted because of the lack of material standards, which leads clients to doubt the quality of reused materials.

    “However, in the case of wood waste reusability, direct reuse may not always be accepted because of the lack of material standards, which leads clients to doubt the quality of reused materials [80].”

    From Circular Economy of Construction and Demolition Wood Waste—A Theoretical Framework Approach (2022) · cites this paper as [80]

    Section 4.2 (Reuse; page not provided) says that a lack of standards for reused construction and demolition waste leads consumers to doubt its quality, and that companies seldom use it because quality cannot be guaranteed. The passage does not establish this specifically for wood waste or direct reuse. (LLM, conf=0.86)

    Experimental — accuracy not yet measured
  • Through BIM, the detailed composition of waste materials can be calculated at the early design stage.

    “Through BIM, the detailed composition of waste materials can be calculated at the early design stage [79][80][81][82].”

    From Circular Economy of Construction and Demolition Wood Waste—A Theoretical Framework Approach (2022) · cites this paper as [80]

    Section 4.1 (Reduce; page unavailable) says BIM can help reduce construction and demolition waste by simulating building modules and the construction process, and discusses waste reduction during design. It does not say that BIM calculates the detailed composition of waste materials at the early design stage. (LLM, conf=0.82)

    Experimental — accuracy not yet measured
  • The average recycling rate in the EU, UK, France, Spain, Germany, Australia, US, and China are 46%, 89.9%, 47.5%, 37.9%, 34%, 38-40%, 70%, and 5%, respectively.

    “The average recycling rate in the EU, UK, France, Spain, Germany, Australia, US, and China are 46%, 89.9%, 47.5%, 37.9%, 34%, 38-40%, 70%, and 5%, respectively [78,80,97,98].”

    From Circular Economy of Construction and Demolition Wood Waste—A Theoretical Framework Approach (2022) · cites this paper as [80]

    The Abstract in our copy gives China's average construction-and-demolition-waste recycling rate as about 5%. The Introduction says recycling and reuse can reach 70%–95% in some developed countries, including the US, but does not assign the US an average of 70%. The paper does not provide the cited averages for the EU, UK, France, Spain, Germany, or Australia. (LLM, conf=0.88)

    Experimental — accuracy not yet measured
  • Currently, there are no standards to certify the quality of reused components.

    “According to the reviewed articles, currently, there are no standards to certify the quality of the reused components (Chini and Acquaye, 2001, Dunant et al., 2017, Huang et al., 2018).”

    From Components reuse in the building sector – A systematic review (2020) · cites this paper as Huang et al., 2018

    Section 4.2 (Reuse) says that standards for reused construction and demolition waste materials are lacking and that their quality cannot be guaranteed. This supports the concern about quality standards, but the paper discusses China; it does not establish that no certification standards exist for reused components generally. (LLM, conf=0.84)

    Experimental — accuracy not yet measured
  • In China, the lower cost of landfilling is an impediment to reuse.

    “For instance, (Huang et al., 2018) report that the lower cost of landfilling is an impediment to reuse.”

    From Components reuse in the building sector – A systematic review (2020) · cites this paper as Huang et al., 2018

Self-check

Percentages, sums and reported differences re-computed from the paper’s own numbers.

The self-check needs the paper’s full text.

Cites

Flagged first, then by citations

Research works printed but not linked: 10

  1. China National Bureau of Statistics, 2014. International Statistical Yearbook. China Statistics Press, Beijing.
  2. China Architecture Design and Research Group, 2015. Policy Research on Construction Waste Recycling and Reutilization. City Building Energy Conservation and Wall Materials Innovation Office, pp. 38-44.
  3. Duan, H., Li, J., 2016. Construction and demolition waste management: china's lessons. Waste Manag. Res. 34 (5), 397-398.
  4. Gluzhge, P.J., 1946. The work of scientific research institute Gidrotekhnicheskoye Stroitel'stvo 4. pp. 27-28.
  5. Li, Y., Zheng, Y., Chen, J.L., 2008. Policy study on construction waste reclamation in Beijing. Build. Sci. 24 (10), 4-10.
  6. National Bureau of Statistics of the People's Republic of China, 2015. China Statistical Yearbook. China Statistics Press, Beijing.
  7. Shi, W.Y., 2009. The Study of Building Deconstruction and the Reuse of Building Materials in Foreign Countries, Master Thesis. Tianjin University, Architectural Design and Theory, Tianjin.
  8. Su, Z.L., 2012. The protection of urban style and historic buildings in the process of urbanization in China. J. Shanghai Norm. Univ.(Phil. Soc. Sci. Ed.) 41, 18-24.
  9. Wu, J.B., Hu, M.M., Shi, S.Y., 2016a. Eco-efficiency of construction and demolition waste recycling in Chongqing, China. Sustain. Built Environ. Reg. Conf. 39, 82-87.
  10. Zuo, H.K., Fu, S.L., 2011. Research on the construction and distribution of construction waste generation and disposal facilities in beijing city. Environ. Sanitation Eng. 19 (2), 63-64.

Cited by

Sorted by citations

Authors
Huang, B., Wang, X., Kua, H., Geng, Y., Bleischwitz, R., & Ren, J.
Affiliations
  • University of Shanghai for Science and Technology (CN)
  • Shanghai Jiao Tong University (CN)
  • University College London (GB)
  • Hong Kong Polytechnic University (HK)
Corresponding author
Huang, Beijia
Venue
Resources, Conservation and Recycling
Publisher
Elsevier BV
Published
2018-02
Volume
129
Pages
36-44
ISSN
0921-3449 (ISSN-L)
OpenAlex
W2765640623
Cited by
1,047
References
1
Citations by year
2026: 118 · 2025: 173 · 2024: 163 · 2023: 153 · 2022: 151 · 2021: 140 · 2020: 82 · 2019: 51 · 2018: 14 · 2017: 1 · 2014: 1
FWCI
37.84
Type
journal article
Language
en
Open access
Locations
  • Resources Conservation and Recycling (publishedVersion)
  • PolyU Institutional Research Archive (Hong Kong Polytechnic University) (submittedVersion, cc-by-nc-nd)
  • National University of Singapore (submittedVersion)
  • UCL Discovery (University College London) (submittedVersion)
  • PolyU Institutional Research Archive (Hong Kong Polytechnic University) (submittedVersion)
Funders
  • National Natural Science Foundation of China (71690241, 71461137008, 71325006, 71403170)
  • Economic and Social Research Council (ES/L015838/1)
Topics
  • Physical Sciences › Engineering › Building and Construction › Recycled Aggregate Concrete Performance
  • Physical Sciences › Environmental Science › Waste Management and Disposal › Municipal Solid Waste Management
  • Social Sciences › Business, Management and Accounting › Strategy and Management › Sustainable Supply Chain Management
Keywords
construction and demolition waste, 3Rs, circular economy, waste reduction, waste reuse, waste recycling, China, waste management policy, building design standards, waste collection and sorting, recycling technology, economic incentives, source control

About these checks

Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.

Statistics and arithmetic are recomputed, not judged.

Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.

What counts as a claim ›How we measure confidence ›How we check this ›

Are you an author, or do you see a problem with this page? Request a review