Complexity of Machine Scheduling Problems
Open accessThe DOI matches its Crossref record; 24 of the 24 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Reducibility among Combinatorial Problems
Karp, R. M. (1972) · Complexity of Computer Computations · doi:10.1007/978-1-4684-2001-2_9 · Cited by 11,511
The complexity of theorem-proving procedures
Cook, S. A. (1971) · Proceedings of the third annual ACM symposium on Theory of computing - STOC '71 · doi:10.1145/800157.805047 · Cited by 6,385
Optimal two‐ and three‐stage production schedules with setup times included
Johnson, S. M. (1954) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800010110 · Cited by 3,252
Complexity of Computer Computations
(1972) · Springer eBooks · doi:10.1007/978-1-4684-2001-2 · Cited by 2,781
Edmonds, J. (1965) · Canadian Journal of Mathematics · doi:10.4153/cjm-1965-045-4 · Cited by 2,428
Some simplified NP-complete graph problems
Garey, M. R., Johnson, D. S., & Stockmeyer, L. (1976) · Theoretical Computer Science · doi:10.1016/0304-3975(76)90059-1 · Cited by 2,059
Various optimizers for single‐stage production
Smith, W. E. (1956) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800030106 · Cited by 1,831
Edmonds, J. (2009) · Classic Papers in Combinatorics · doi:10.1007/978-0-8176-4842-8_26 · Cited by 1,517
NP-complete scheduling problems
Ullman, J. D. (1975) · Journal of Computer and System Sciences · doi:10.1016/s0022-0000(75)80008-0 · Cited by 1,452
Parallel Sequencing and Assembly Line Problems
Hu, T. C. (1961) · Operations Research · doi:10.1287/opre.9.6.841 · Cited by 898
On the Computational Complexity of Combinatorial Problems
Karp, R. M. (1975) · Networks · doi:10.1002/net.1975.5.1.45 · Cited by 711
Optimal scheduling for two-processor systems
Coffman, E. G., & Graham, R. L. (1972) · Acta Informatica · doi:10.1007/bf00288685 · Cited by 614
A “Pseudopolynomial” Algorithm for Sequencing Jobs to Minimize Total Tardiness
Lawler, E. L. (1977) · Annals of Discrete Mathematics · doi:10.1016/s0167-5060(08)70742-8 · Cited by 610
Complexity of Scheduling under Precedence Constraints
Lenstra, J. K., & Kan, A. H. G. R. (1978) · Operations Research · doi:10.1287/opre.26.1.22 · Cited by 557
Self-citationScheduling independent tasks to reduce mean finishing time
Bruno, J., Coffman, E. G., & Sethi, R. (1974) · Communications of the ACM · doi:10.1145/361011.361064 · Cited by 504
Complexity Results for Multiprocessor Scheduling under Resource Constraints
Garey, M. R., & Johnson, D. S. (1975) · SIAM Journal on Computing · doi:10.1137/0204035 · Cited by 493
Algorithms and Complexity: New Directions and Recent Results
Traub, J. F. (1976) · UCLA - Biblioteca de Ciencias y Tecnologia Felix Morales Bueno · Cited by 427
Sequencing Jobs to Minimize Total Weighted Completion Time Subject to Precedence Constraints
Lawler, E. L. (1978) · Annals of discrete mathematics · doi:10.1016/s0167-5060(08)70323-6 · Cited by 354
Machine scheduling problems: Classification, complexity and computations
Rand, G. K. (1977) · European Journal of Operational Research · doi:10.1016/0377-2217(77)90029-7 · Cited by 341
Some Simple Applications of the Travelling Salesman Problem
Lenstra, J. K., & Kan, A. H. G. R. (1975) · Journal of the Operational Research Society · doi:10.1057/jors.1975.151 · Cited by 270
Self-citationTwo-Processor Scheduling with Start-Times and Deadlines
Garey, M. R., & Johnson, D. S. (1977) · SIAM Journal on Computing · doi:10.1137/0206029 · Cited by 236
Decomposition Algorithms for Single-Machine Sequencing with Precedence Relations and Deferral Costs
Sidney, J. B. (1975) · Operations Research · doi:10.1287/opre.23.2.283 · Cited by 211
Minimizing maximum lateness on one machine: computational experience and some applications
Lageweg, B. J., Lenstra, J. K., & Kan, A. H. G. R. (1976) · Statistica Neerlandica · doi:10.1111/j.1467-9574.1976.tb00264.x · Cited by 114
Self-citationKnuth, D. E. (1974) · ACM SIGACT News · doi:10.1145/1811129.1811130 · Cited by 44
Cited by
Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
Graham, R. L., Lawler, E. L., Lenstra, J. K., & Kan, A. H. G. R. (1979) · Annals of Discrete Mathematics · doi:10.1016/s0167-5060(08)70356-x · Cited by 5,854
Self-citationA Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
Hall, N. G., & Sriskandarajah, C. (1996) · Operations Research · doi:10.1287/opre.44.3.510 · Cited by 842
Deterministic job-shop scheduling: Past, present and future
Jain, A. S., & Meeran, S. (1999) · European Journal of Operational Research · doi:10.1016/s0377-2217(98)00113-1 · Cited by 782
From the Quantum Approximate Optimization Algorithm to a Quantum Alternating Operator Ansatz
Hadfield, S., Wang, Z., O’Gorman, B., Rieffel, E. G., Venturelli, D., & Biswas, R. (2019) · Algorithms · doi:10.3390/a12020034 · Cited by 772
Chapter 9 Sequencing and scheduling: Algorithms and complexity
Lawler, E. L., Lenstra, J. K., Rinnooy Kan, A. H. G., & Shmoys, D. B. (1993) · Handbooks in Operations Research and Management Science · doi:10.1016/s0927-0507(05)80189-6 · Cited by 761
Self-citation
Metadata
- Authors
- Lenstra, J. K., Rinnooy Kan, A. H. G., & Brucker, P.
- Venue
- Annals of Discrete Mathematics
- Publisher
- Elsevier
- Published
- 1977
- Pages
- 343-362
- ISSN
- 0167-5060 (ISSN-L)
- OpenAlex
- W2743045177
- Cited by
- 2,197
- References
- 24
- FWCI
- 65.63
- Type
- book chapter
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.