Complexity of Machine Scheduling Problems
Open accessThe DOI matches its Crossref record; 24 of the 24 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Reducibility among Combinatorial Problems
Karp, R. M. (1972) · Complexity of Computer Computations · doi:10.1007/978-1-4684-2001-2_9 · Cited by 11,511
The complexity of theorem-proving procedures
Cook, S. A. (1971) · Proceedings of the third annual ACM symposium on Theory of computing - STOC '71 · doi:10.1145/800157.805047 · Cited by 6,385
Optimal two‐ and three‐stage production schedules with setup times included
Johnson, S. M. (1954) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800010110 · Cited by 3,252
Complexity of Computer Computations
(1972) · Springer eBooks · doi:10.1007/978-1-4684-2001-2 · Cited by 2,781
Edmonds, J. (1965) · Canadian Journal of Mathematics · doi:10.4153/cjm-1965-045-4 · Cited by 2,428
Some simplified NP-complete graph problems
Garey, M. R., Johnson, D. S., & Stockmeyer, L. (1976) · Theoretical Computer Science · doi:10.1016/0304-3975(76)90059-1 · Cited by 2,059
Various optimizers for single‐stage production
Smith, W. E. (1956) · Naval Research Logistics Quarterly · doi:10.1002/nav.3800030106 · Cited by 1,831
Edmonds, J. (2009) · Classic Papers in Combinatorics · doi:10.1007/978-0-8176-4842-8_26 · Cited by 1,517
NP-complete scheduling problems
Ullman, J. D. (1975) · Journal of Computer and System Sciences · doi:10.1016/s0022-0000(75)80008-0 · Cited by 1,452
Parallel Sequencing and Assembly Line Problems
Hu, T. C. (1961) · Operations Research · doi:10.1287/opre.9.6.841 · Cited by 898
Cited by
Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey
Graham, R. L., Lawler, E. L., Lenstra, J. K., & Kan, A. H. G. R. (1979) · Annals of Discrete Mathematics · doi:10.1016/s0167-5060(08)70356-x · Cited by 5,854
Self-citationA Survey of Machine Scheduling Problems with Blocking and No-Wait in Process
Hall, N. G., & Sriskandarajah, C. (1996) · Operations Research · doi:10.1287/opre.44.3.510 · Cited by 842
Deterministic job-shop scheduling: Past, present and future
Jain, A. S., & Meeran, S. (1999) · European Journal of Operational Research · doi:10.1016/s0377-2217(98)00113-1 · Cited by 782
From the Quantum Approximate Optimization Algorithm to a Quantum Alternating Operator Ansatz
Hadfield, S., Wang, Z., O’Gorman, B., Rieffel, E. G., Venturelli, D., & Biswas, R. (2019) · Algorithms · doi:10.3390/a12020034 · Cited by 772
Chapter 9 Sequencing and scheduling: Algorithms and complexity
Lawler, E. L., Lenstra, J. K., Rinnooy Kan, A. H. G., & Shmoys, D. B. (1993) · Handbooks in Operations Research and Management Science · doi:10.1016/s0927-0507(05)80189-6 · Cited by 761
Self-citationSimulated annealing for permutation flow-shop scheduling
Osman, I., & Potts, C. (1989) · Omega · doi:10.1016/0305-0483(89)90059-5 · Cited by 614
A “Pseudopolynomial” Algorithm for Sequencing Jobs to Minimize Total Tardiness
Lawler, E. L. (1977) · Annals of Discrete Mathematics · doi:10.1016/s0167-5060(08)70742-8 · Cited by 610
Operational methods for minimization of energy consumption of manufacturing equipment
Mouzon, G., Yildirim, M. B., & Twomey, J. (2007) · International Journal of Production Research · doi:10.1080/00207540701450013 · Cited by 597
Proceedings of Winter Simulation Conference
(1994) · Proceedings of Winter Simulation Conference WSC-94 · doi:10.1109/wsc.1994.717062 · Cited by 540
The job shop scheduling problem: Conventional and new solution techniques
Błażewicz, J., Domschke, W., & Pesch, E. (1996) · European Journal of Operational Research · doi:10.1016/0377-2217(95)00362-2 · Cited by 536
A branch and bound algorithm for the job-shop scheduling problem
Brucker, P., Jurisch, B., & Sievers, B. (1994) · Discrete Applied Mathematics · doi:10.1016/0166-218x(94)90204-6 · Cited by 499
Self-citationProceedings of the 2002 Winter Simulation Conference
(2002) · Proceedings of the Winter Simulation Conference · doi:10.1109/wsc.2002.1166355 · Cited by 456
Scheduling algorithms and operating systems support for real-time systems
Ramamritham, K., & Stankovic, J. A. (1994) · Proceedings of the IEEE · doi:10.1109/5.259426 · Cited by 428
Zhang, R., & Chiong, R. (2016) · Journal of Cleaner Production · doi:10.1016/j.jclepro.2015.09.097 · Cited by 344
A framework to minimise total energy consumption and total tardiness on a single machine
Mouzon, G., & Yildirim, M. B. (2008) · International Journal of Sustainable Engineering · doi:10.1080/19397030802257236 · Cited by 315
Ogbu, F. A., & Smith, D. K. (1990) · Computers & Operations Research · doi:10.1016/0305-0548(90)90001-n · Cited by 310
An Iterated Dynasearch Algorithm for the Single-Machine Total Weighted Tardiness Scheduling Problem
Congram, R. K., Potts, C. N., & van de Velde, S. L. (2002) · INFORMS Journal on Computing · doi:10.1287/ijoc.14.1.52.7712 · Cited by 306
Computational Complexity of Discrete Optimization Problems
Lenstra, J. K., & Rinnooy Kan, A. H. G. (1979) · Annals of Discrete Mathematics · doi:10.1016/s0167-5060(08)70821-5 · Cited by 292
Self-citationSome Simple Applications of the Travelling Salesman Problem
Lenstra, J. K., & Kan, A. H. G. R. (1975) · Journal of the Operational Research Society · doi:10.1057/jors.1975.151 · Cited by 270
Self-citationOptimal Solution of Set Covering/Partitioning Problems Using Dual Heuristics
Fisher, M. L., & Kedia, P. (1990) · Management Science · doi:10.1287/mnsc.36.6.674 · Cited by 253
Scheduling hard real-time systems: a review
Burns, A. (1991) · Software Engineering Journal · doi:10.1049/sej.1991.0015 · Cited by 247
Tree Growth Algorithm (TGA): A novel approach for solving optimization problems
Cheraghalipour, A., Hajiaghaei-Keshteli, M., & Paydar, M. M. (2018) · Engineering Applications of Artificial Intelligence · doi:10.1016/j.engappai.2018.04.021 · Cited by 239
Woeginger, G. J. (2000) · INFORMS Journal on Computing · doi:10.1287/ijoc.12.1.57.11901 · Cited by 236
A research survey: review of AI solution strategies of job shop scheduling problem
Çaliş, B., & Bulkan, S. (2015) · Journal of Intelligent Manufacturing · doi:10.1007/s10845-013-0837-8 · Cited by 233
“The job shop scheduling problem is one of the most important and complicated problems which has been known as an NP-hard and very challenging combinatorial optimization problem since 1950s (Lenstra et al. 1977; Zhang et al. 2013) in machine scheduling.”
BackgroundYildirim, M. B., & Mouzon, G. (2012) · IEEE Transactions on Engineering Management · doi:10.1109/tem.2011.2171055 · Cited by 172
“The total-completion-time problem when all jobs are not available at the same time (1|ri | ∑ ci , where ri is the release time, and ci is the completion time of job i) is NP-hard [16].”
BackgroundInfluentialEfficient algorithms for collision avoidance at intersections
Colombo, A., & Del Vecchio, D. (2012) · Proceedings of the 15th ACM international conference on Hybrid Systems: Computation and Control · doi:10.1145/2185632.2185656 · Cited by 134
Minimizing Total Weighted Tardiness on a Single Machine with Release Dates and Equal-Length Jobs
van den Akker, J. M., Diepen, G., & Hoogeveen, J. A. (2010) · Journal of Scheduling · doi:10.1007/s10951-010-0181-1 · Cited by 30
Efficient LLM Serving for Agentic Workflows: A Data Systems Perspective
Wadlom, N., Shen, J., & Lu, Y. (2026) · Proceedings of the ACM on Management of Data · doi:10.1145/3802046
Metadata
- Authors
- Lenstra, J. K., Rinnooy Kan, A. H. G., & Brucker, P.
- Venue
- Annals of Discrete Mathematics
- Publisher
- Elsevier
- Published
- 1977
- Pages
- 343-362
- ISSN
- 0167-5060 (ISSN-L)
- OpenAlex
- W2743045177
- Cited by
- 2,197
- References
- 24
- FWCI
- 65.63
- Type
- book chapter
- Language
- en
- Open access
- green
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.