Current practice in project management — an empirical study
The DOI matches its Crossref record; 22 of the 22 references it cites were found in a registry or an index.
Overview
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Free: it reads the open-access text and checks the first 5 claims that cite a source we can check. Create a free account to check every claim.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Project management : a systems approach to planning, scheduling, and controlling
Kerzner, H. (1995) · Thammasat University Digital Collections · Cited by 3,099
Project management: A systems approach to planning, scheduling and controlling
Botter, C. H. (1982) · European Journal of Operational Research · doi:10.1016/0377-2217(82)90164-3 · Cited by 2,408
A new framework for determining critical success/failure factors in projects
Belassi, W., & Tukel, O. I. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00064-x · Cited by 1,187
Critical factors in successful project implementation
Pinto, J. K., & Slevin, D. P. (1987) · IEEE Transactions on Engineering Management · doi:10.1109/tem.1987.6498856 · Cited by 966
Project Risk Management: Processes, Techniques and Insights
Smith, J. U. M. (1998) · Journal of the Operational Research Society · doi:10.1057/palgrave.jors.2600022 · Cited by 555
Systems Analysis and Project Management.
Schmidt, R. N., Cleland, D. I., & King, W. R. (1969) · Administrative Science Quarterly · doi:10.2307/2391604 · Cited by 411
(1997) · Wiley eBooks · doi:10.1002/9780470172353 · Cited by 402
Factors Affecting Project Success
Baker, B. N., Murphy, D. C., & Fisher, D. (1997) · Project Management Handbook · doi:10.1002/9780470172353.ch35 · Cited by 401
Morris, P. W. G., & Hough, G. (1987) · UCL Discovery (University College London) · Cited by 300
IT projects: a basis for success
Wateridge, J. (1995) · International Journal of Project Management · doi:10.1016/0263-7863(95)00020-q · Cited by 264
Critical Success Factors for Information Center Managers
Magal, S. R., Carr, H. H., & Watson, H. J. (1988) · MIS Quarterly · doi:10.2307/249208 · Cited by 163
Systems Analysis and Project Management
Jeffries, T. O. (1969) · Electronics and Power · doi:10.1049/ep.1969.0128 · Cited by 153
Risk assessment and information systems
Willcocks, L., & Margetts, H. (1994) · European Journal of Information Systems · doi:10.1057/ejis.1994.13 · Cited by 140
The project management of organizational change
Partington, D. (1996) · International Journal of Project Management · doi:10.1016/0263-7863(95)00037-2 · Cited by 135
Risk Evaluation and Management
Covello, V. T., Menkes, J., & Mumpower, J. L. (1986) · Springer eBooks · doi:10.1007/978-1-4613-2103-3 · Cited by 132
Risk: Analysis, assessment and management
Pintelon, L. M. (1994) · European Journal of Operational Research · doi:10.1016/0377-2217(94)90130-9 · Cited by 90
The evaluation of risk management in public sector capital projects
Baldry, D. (1998) · International Journal of Project Management · doi:10.1016/s0263-7863(97)00015-x · Cited by 89
Project risk management: Processes, techniques and insights
(1997) · Long Range Planning · doi:10.1016/s0024-6301(97)80942-9 · Cited by 79
Predicting risk of failure in large-scale Information Technology projects
Willcocks, L. P., & Griffiths, C. (1994) · Technological Forecasting and Social Change · doi:10.1016/0040-1625(94)90029-9 · Cited by 61
Applications of Probabilistic Risk Assessments: The Selection of Appropriate Tools1
Linnerooth‐Bayer, J., & Wahlström, B. G. (1991) · Risk Analysis · doi:10.1111/j.1539-6924.1991.tb00600.x · Cited by 55
Contemporary Worldviews and Perception of the Technological System
Buss, D. M., Craik, K. H., & Dake, K. (1986) · Springer eBooks · doi:10.1007/978-1-4613-2103-3_4 · Cited by 35
Comparative Analysis of Formal Decision-Making Approaches
Merkhofer, M. W. (1986) · Springer eBooks · doi:10.1007/978-1-4613-2103-3_7 · Cited by 21
Cited by
Project Success as a Topic in Project Management Journals
Ika, L. A. (2009) · Project Management Journal · doi:10.1002/pmj.20137 · Cited by 783
A study on project success factors in large construction projects in Vietnam
Duy Nguyen, L., Ogunlana, S. O., & Thi Xuan Lan, D. (2004) · Engineering, Construction and Architectural Management · doi:10.1108/09699980410570166 · Cited by 415
Success Criteria and Factors for International Development Projects: A Life-Cycle-Based Framework
Khang, D. B., & Moe, T. L. (2008) · Project Management Journal · doi:10.1002/pmj.20034 · Cited by 394
Do project managers practice what they preach, and does it matter to project success?
Papke-Shields, K. E., Beise, C., & Quan, J. (2010) · International Journal of Project Management · doi:10.1016/j.ijproman.2009.11.002 · Cited by 393
Joslin, R., & Müller, R. (2015) · International Journal of Project Management · doi:10.1016/j.ijproman.2015.03.005 · Cited by 356
Metadata
- Authors
- White, D., & Fortune, J.
- Venue
- International Journal of Project Management
- Publisher
- Elsevier BV
- Published
- 2002-01
- Volume
- 20
- Issue
- 1
- Pages
- 1-11
- ISSN
- 0263-7863 (ISSN-L)
- OpenAlex
- W2004444028
- Cited by
- 705
- References
- 22
- FWCI
- 21.11
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.