The DOI matches its Crossref record; 3 of the 3 references it cites were found in a registry or an index.
Project Success as a Topic in Project Management Journals
Abstract
This article highlights the characteristics of articles on project success published between 1986 and 2004 in the Project Management Journal (PMJ) and the International Journal of Project Management (IJPM). The analysis covers references, concepts like project management success, project success, success criteria, and success factors; features of the samples, data collection, and analysis techniques used; and professional disciplines. The results show that research on project success is characterized by diversity except in epistemological and methodological perspectives. The article suggests a shift to project, portfolio, and program success and concludes with a discussion on the traditional state of the research, criticizes its assumptions, and offers alternative metaphors and recommendations for future research.
Overview
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Integrity signals
Registry
Cites
Statistics
Verification
Claims the paper makes
The claims and statistics of this paper haven’t been checked yet.
Run the check — free, no account needed. It reads the open-access text and checks the sources it cites.
Self-check
Percentages, sums and reported differences re-computed from the paper’s own numbers.
The self-check needs the paper’s full text.
Citations
Cites
Atkinson, R. (1999) · International Journal of Project Management · doi:10.1016/s0263-7863(98)00069-6 · Cited by 2,359
The Logical Framework Method for Defining Project Success
Baccarini, D. (1999) · Project Management Journal · doi:10.1177/875697289903000405 · Cited by 1,136
Transcending General Linear Reality
Abbott, A. (1988) · Sociological Theory · doi:10.2307/202114 · Cited by 716
Cited by
Transformational leadership and project success: The mediating role of team-building
Aga, D. A., Noorderhaven, N., & Vallejo, B. (2016) · International Journal of Project Management · doi:10.1016/j.ijproman.2016.02.012 · Cited by 486
Critical success factors for World Bank projects: An empirical investigation
Ika, L. A., Diallo, A., & Thuillier, D. (2012) · International Journal of Project Management · doi:10.1016/j.ijproman.2011.03.005 · Cited by 448
Self-citationThe front-end of projects: a systematic literature review and structuring
Williams, T., Vo, H., Samset, K., & Edkins, A. (2019) · Production Planning & Control · doi:10.1080/09537287.2019.1594429 · Cited by 145
Governance Impact Assessment on Large Infrastructure Project (LIP) Delivery.
Department of Quantity Surveying, B. U., Zarewa, G. A., Ibrahim, A. D., Department of Quantity Surveying, A. B. U., Ibrahim, Y. M., Department of Quantity Surveying, A. B. U., Adogbo, K. J., & Department of Quantity Surveying, A. B. U. (2018) · Journal of Engineering, Project, and Production Management · doi:10.32738/jeppm.201801.0003 · Cited by 6
Metadata
- Authors
- Ika, L. A.
- Venue
- Project Management Journal
- Publisher
- SAGE Publications
- Published
- 2009-12
- Volume
- 40
- Issue
- 4
- Pages
- 6-19
- ISSN
- 1938-9507 (ISSN-L)
- 8756-9728
- OpenAlex
- W1985872311
- Cited by
- 783
- References
- 3
- FWCI
- 20.30
- Type
- journal article
- Language
- en
- Open access
- closed
About these checks
Registry, retraction, Cites and statistics results are computed, not judged, with one exception: a printed reference that no index lists is read once by a model before it counts as a citation error. Claims are extracted by a model and kept only when their quote appears verbatim in the text; each cited source is then checked, with a model’s help, for whether it says what the claim relies on. Those verdicts can be wrong — read the claim’s quote and the cited source before relying on one.
Statistics and arithmetic are recomputed, not judged.
Confidence bands are shown only for fields calibrated on our annotated test set. None is calibrated yet, so no band is shown.
What counts as a claim ›How we measure confidence ›How we check this ›
Are you an author, or do you see a problem with this page? Request a review
How to cite
Cite CoChat for the checks on this page, and the paper for its own findings.
- This page
- CoChat. (2026). Citation check: Project Success as a Topic in Project Management Journals. https://app.cochat.ai/papers/10.1002/pmj.20137
- The paper
- Ika, L. A. (2009). Project Success as a Topic in Project Management Journals. Project Management Journal. https://doi.org/10.1002/pmj.20137
Data sources
Bibliographic data: Semantic Scholar, OpenAlex, Crossref.
Contains information from the Semantic Scholar Academic Graph Datasets, made available under the ODC Attribution License (ODC-BY 1.0).
Semantic Scholar’s data is described in: Kinney, R., et al. (2023). The Semantic Scholar Open Data Platform. arXiv:2301.10140.